Temporary Construction / Maintenance Easements Sample Clauses

A Temporary Construction / Maintenance Easements clause grants a party, typically a contractor or utility company, the right to access and use a specific portion of property for a limited period to perform construction or maintenance activities. This easement is usually defined by a set timeframe and specific boundaries, and may include provisions for restoring the property to its original condition once the work is completed. The core function of this clause is to facilitate necessary work on or near the property while ensuring that the property owner's rights are respected and that any disruptions are temporary and clearly regulated.
Temporary Construction / Maintenance Easements. (1) In connection with exercise of the foregoing Access Easements, the Shared Pipeline Easement and the Easements granted hereinafter in Section 2.3, each Party (a “Constructing Party”) is hereby granted by the other Party a temporary construction and maintenance easement as needed from time to time to use necessary portions of the other Party’s Parcel, as the servient estate under such Easement, in connection with: (a) All construction activities as permitted under the applicable Easement; (b) Inspecting, maintaining, repairing and replacing the Constructing Party’s pipelines, transmission lines, conduits, equipment and other improvements; and (c) The transportation and hauling of heavy vehicles, loads and equipment over any road within an Access Area of the other Party, in which case the Constructing Party may temporarily cap (with gravel, asphalt or other suitable, protective material) such road in order to prevent or mitigate damage thereby caused to such road. Notwithstanding anything to the contrary contained in this Agreement, any damage to any such road of a Party caused by such transportation and hauling by the Constructing Party shall be promptly repaired by the Constructing Party at its sole cost and expense. The foregoing easements are collectively referred to herein as the “Temporary Construction/ Maintenance Easements”. Any and all activities described in Sections 2.2(E)(1)(a) and (b) are collectively referred to in this Section 2.2(E)(1) as “Work”. (2) Within a reasonable time before it begins any Work, the Constructing Party shall provide reasonable prior notice (except in an emergency situation, in which case no prior notice is required, but instead the Constructing Party shall submit subsequent notice) to the other Party outlining those portions of the other Party’s Parcel in which the Temporary Construction/Maintenance Easement is needed, identifying the Work to be undertaken, and the estimated duration of such Work. (3) When the Constructing Party ceases using the other Party’s Parcel for such Work, it must promptly restore such area to the condition in which it existed before the commencement of the Work within a reasonable period of time. This restoration Work shall include clearing the area of all loose dirt, debris, equipment and construction materials and the repair or replacement of equipment areas, equipment connections, utility services, paving, and landscaping and repairs and replacements to such other items as may be required ...

Related to Temporary Construction / Maintenance Easements

  • Construction and Maintenance There are on-going maintenance, renovation and construction projects taking place in and around the residences. The work typically takes place during regular business hours, but may begin earlier or extend into evenings or weekends. On-going construction or renovation projects will continue through midterm and final exam periods. The University will take measures to ensure that prudent construction practices are followed, but there may be noise, dust and temporary interruption of some services. Residents may be required to temporarily or permanently relocate to facilitate construction or renovation to their residence area. There will be no compensation or reduction to your residence fees due to disruption and/or relocation.

  • Routine Maintenance, Construction, and Repair The NYISO or Connecting Transmission Owner may interrupt interconnection service or curtail the output of the Small Generating Facility and temporarily disconnect the Small Generating Facility from the New York State Transmission System or Distribution System when necessary for routine maintenance, construction, and repairs on the New York State Transmission System or Distribution System. The NYISO or the Connecting Transmission Owner shall provide the Interconnection Customer with five Business Days notice prior to such interruption. The NYISO and Connecting Transmission Owner shall use Reasonable Efforts to coordinate such reduction or temporary disconnection with the Interconnection Customer.

  • Property Maintenance Maintain all of its property that is necessary to or useful in the proper conduct of its business in good working condition, ordinary wear and tear excepted.

  • Improvements to Premises Lessee shall take the Premises in its "as-is" condition for the Extended Term except for certain Leasehold Improvements (herein so called) to the Premises which shall be completed in accordance with the specifications attached hereto as Exhibit A (the "Approved Plans"), which have been approved by both Lessor and Lessee. Lessor shall cause the Leasehold Improvements to be installed or constructed in accordance with the Approved Plans by Lessor's contractor. So long as no Event of Default (or event which with notice or lapse of time could become an Event of Default) has occurred under the Lease, Lessor agrees to provide Lessee an allowance equal to One Hundred Fifty-Three Thousand One Hundred Nineteen and No/100 Dollars ($153,119.00) (the "Improvement Allowance"), which allowance is to be used solely for completion of the Leasehold Improvements in accordance with the Approved Plans, and an additional allowance equal to Three Thousand Two Hundred and No/100 Dollars ($3,200.00) (the "Architectural Allowance"), which allowance is to be used solely for space planning and design services for the Premises. In the event that any alterations or modifications to the Premises are required in order to comply with applicable law, including, without limitation, the Americans with Disabilities Act of 1990, as amended, or the State of Texas equivalent laws and regulations, the cost of any such alterations or modifications shall be satisfied out of the Improvement Allowance. The cost of the Leasehold Improvements and the space planning and design fees is to be paid by Lessor out of the Improvement Allowance and the Architectural Allowance, respectively. Any completed work (labor or materials) outside the scope of the Approved Plans or the cost of which is in excess of the Improvement Allowance or the Architectural Allowance, as the case may be, shall be at Lessee's sole cost and will be billed to Lessee by Lessor and will be due and payable within ten (10) days after Lessee's receipt of an invoice therefor. Notwithstanding the foregoing, Lessee will not be liable for work outside the scope of the Approved Plans or excess costs over the amount of the Improvement Allowance or the Architectural Allowance unless Lessee has consented in writing to such work outside the scope of the Approved Plans or excess costs prior to the commencement of such work or the incurring of such excess costs. Any portion of the Improvement Allowance or the Architectural Allowance remaining upon the completion of the Leasehold Improvements shall be deemed forfeited by Lessee. Lessor further acknowledges and agrees that Section 4.07 of the Lease is hereby amended to provide that Lessee shall not be required to surrender possession of the Premises to Lessor "in the same condition as when received", but rather shall be entitled to surrender possession of the Premises in the same condition as exists upon the completion of the Leasehold Improvements described in Paragraph 3 above, subject to any and all other requirements set forth in Section 4.07 of the Lease.

  • Common Area Maintenance Landlord will maintain or cause to be maintained the Common Areas and Tenant will reimburse Landlord for Tenant’s prorata share of the cost of such maintenance as hereinafter provided. (a) Common area maintenance costs and expenses shall be determined in accordance with generally accepted accounting principles consistently applied and allocated to any particular calendar year on the accrual method of accounting. Such costs and expenses shall include, but shall not be limited to upkeep, exterior painting, repairs, replacements and improvements in the Common Areas, snow removal, sweeping and cleanup, depreciation allowance on any machinery and equipment owned by Landlord and used in connection therewith, utility services including fire line water service charges, premiums for public liability, property damage and fire insurance including the Common Areas, any real estate tax and/or tax consultant expense incurred for the purpose of maintaining equitable tax assessments on the Development, all property taxes or assessments levied or assessed against all Common Areas, which, if not separately assessed, shall be determined, for land, by the ratio of land area designated for Common Area use to the total land area in the Development and, for improvements, on a fair and equitable allocation among the various improvements in the Development, giving weight to the factors which determine the amount of the real property tax or assessment in question. In addition, such costs shall include administrative costs equal to ten percent (10%) of the total cost paid or incurred by Landlord under this paragraph. (b) Tenant shall pay as additional rent to Landlord, Tenant’s prorata share of such Common Area expenses in the following manner: (1) From and after the date the minimum rental provided for herein has commenced, but subject to adjustment as hereinafter in this subparagraph (1) provided, Tenant shall pay Landlord in advance on the first day of each calendar month during the term of this Lease an estimated and adjustable amount covering Tenant’s proportionate share of common area services and expenses, which amount may be adjusted by Landlord by notice to Tenant at the end of any calendar month on the basis of Landlord’s experience and reasonably anticipated costs. (See Lease Rider “A” Building Expenses attached hereto and incorporated herein.) (2) Within thirty (30) days following the end of each calendar year, Landlord shall furnish Tenant a statement covering the calendar year just expired, showing the total operating costs, the amount of Tenant’s prorata share of such Common Area expenses for such calendar year and the payments made by Tenant with respect to such calendar year as set forth in subparagraph (b) I. If Tenant’s prorata share of such Common Area expenses exceeds Tenant’s payments so made, Tenant shall pay Landlord the deficiency within ten (10) days after receipt of such statement. If said payments exceed Tenant’s prorata share of such Common Area expenses, Tenant shall be entitled to offset the excess against payments next thereafter to become due Landlord as set forth in said subparagraph (b) I. Tenant’s pro-rata share of the total Common Area expenses for the previous calendar year shall be that portion of all such expenses which is equal to the proportion which the number of square feet of gross leasable area in the Demised Premises bears to the total number of square feet of gross leasable area of buildings in the entire Development which are from time to time completed and occupied as of the commencement of each calendar year.