Common use of Tenant’s Right to Terminate Clause in Contracts

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 2 contracts

Sources: Sublease (Va Software Corp), Lease Agreement (Centillium Communications Inc)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Leases Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlorddamage; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced; or C. Landlord does not complete the restoration of the Leased Premises within nine months from the date of the damage, provided that such nine-month period of time shall be extended for such number of days as Landlord may be delayed by reason of Force Majeure.

Appears in 2 contracts

Sources: Industrial Space Lease (Viasystems Group Inc), Industrial Space Lease (Viasystems Group Inc)

Tenant’s Right to Terminate. If the Leased Premises Premises, the Building or the Outside Areas are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term Terminate and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 2 contracts

Sources: Industrial Space Lease (Atroad Inc), Industrial Space Lease (Atroad Inc)

Tenant’s Right to Terminate. If the Leased Premises Premises, the Building or the Outside Areas are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.. Landlord Initials W Tenant Initials NH

Appears in 2 contracts

Sources: Industrial Space Lease (Corsair Gaming, Inc.), Industrial Space Lease (Corsair Gaming, Inc.)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this ArticleArticle 10, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven thirty (30) days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlordcasualty; or B. The Leased Premises are damaged by any peril within nine twelve (12) months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety (90) days after the date such restoration is commenced.

Appears in 2 contracts

Sources: Industrial Lease (Quantenna Communications Inc), Industrial Lease (Quantenna Communications Inc)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may be complete. complete Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven thirty days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 2 contracts

Sources: Industrial Space Lease (Asyst Technologies Inc /Ca/), Industrial Space Lease (Asyst Technologies Inc /Ca/)

Tenant’s Right to Terminate. If the Leased Premises Premises, the Building or the Outside Areas are damaged damage by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction constructive consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 1 contract

Sources: Industrial Space Lease (Mattson Technology Inc)

Tenant’s Right to Terminate. If the Leased Premises Premises, the Building or the Outside Areas are damaged damage by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. : The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or B. or The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction constructive consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 1 contract

Sources: Industrial Space Lease (Mattson Technology Inc)

Tenant’s Right to Terminate. If the Leased Premises Premises, the Building or the Outside Areas are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine twelve (12) months of the last day of the Lease Term and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety (90) days after the date such restoration is commenced.

Appears in 1 contract

Sources: Industrial Space Lease (Asyst Technologies Inc)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril Peril not caused by Tenant, and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to section 11.2 of this ArticleLease, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be completecompleted. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven 30 days after Tenant receives from Landlord the date of Landlord’s contractor’s estimate of the time needed to complete such restoration: A. 11.3.1 The Leased Premises or Building necessary for use of, or access to, the Leased Premises are damaged by any peril Peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months 150 days after the date of such notice from damage. Neither party shall have any further obligations under this Lease after such termination, except for Landlord; or B. The Leased Premises are damaged by ’s obligation to return the Security Deposit (less any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commencedpermitted deductions) to Tenant.

Appears in 1 contract

Sources: Multi Tenant Space Lease (Sight Sciences, Inc.)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlorddamage; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced; or C. Landlord does not complete the restoration of the Leased Premises within nine months from the date of the damage, provided that such nine-month period of time shall be extended for such number of days as Landlord may be delayed by reason of Force Majeure.

Appears in 1 contract

Sources: Industrial Space Lease (Adeza Biomedical Corp)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may is expected to be completecompleted, subject to receipt of insurance proceeds. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven (7) days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlorddamage; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction consultant, Landlord does not complete the restoration of the Leased Premises cannot be substantially completed within ninety days after ten (10) months from the date of the damage, provided that such restoration ten (10) month period of time shall be extended for such number of days as Landlord is commenceddelayed by reason of Force Majeure or by nonpayment of insurance proceeds by Landlord’s insurance company.

Appears in 1 contract

Sources: Industrial Space Lease (SOS Hydration Inc.)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven fifteen days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine ninety (990) months days after the date of such notice from Landlord; oror 1003283 v5/SF B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety sixty days after the date such restoration is commenced.

Appears in 1 contract

Sources: Industrial Space Lease (Silicon Graphics International Corp)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord▇▇▇▇▇▇▇▇'s architect or construction consultant as to when the restoration work required of Landlord may is expected to be completecompleted, subject to receipt of insurance proceeds. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven (7) days after Tenant ▇▇▇▇▇▇ receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord▇▇▇▇▇▇▇▇'s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlorddamage; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction consultant, Landlord does not complete the restoration of the Leased Premises cannot be substantially completed within ninety days after ten (10) months from the date of the damage, provided that such restoration ten (10) month period of time shall be extended for such number of days as Landlord is commenceddelayed by reason of Force Majeure or by nonpayment of insurance proceeds by Landlord’s insurance company.

Appears in 1 contract

Sources: Industrial Space Lease

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within with seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable reasonably opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 1 contract

Sources: Single Tenant Lease (Va Linux Systems Inc)

Tenant’s Right to Terminate. If the Leased Premises Premises, the Building or the Outside Areas are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 1 contract

Sources: Consent to Sublease (Virage Logic Corp)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Leasedl Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 1 contract

Sources: Lease Agreement (ArcSoft, Inc.)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlorddamage; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced; or C. Landlord does not complete the restoration of the Leased Premises within nine months from the date of the damage, provided that such nine month period of time shall be extended for such number of days as Landlord may be delayed by reason of Force Majeure.

Appears in 1 contract

Sources: Industrial Space Lease (Adeza Biomedical Corp)

Tenant’s Right to Terminate. If the Leased Premises Premises, the Building or the Outside Areas are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 1 contract

Sources: Industrial Space Lease (Virage Logic Corp)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) twelve months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 1 contract

Sources: Industrial Space Lease (Virage Logic Corp)

Tenant’s Right to Terminate. If the Leased Premises Premises, the Building or the Outside Areas are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) eight months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 1 contract

Sources: Industrial Space Lease (Lexar Media Inc)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven thirty (30) days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) six months after the date of such notice from Landlorddamage; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced; or C. Landlord does not complete the restoration of the Leased Premises within six months from the date of the damage, provided that such nine month period of time shall be extended for such number of days as Landlord may be delayed by reason of Force Majeure.

Appears in 1 contract

Sources: Net Industrial Space Lease (Adeza Biomedical Corp)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine (9) months after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 1 contract

Sources: Sublease (@Road, Inc)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven fifteen days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine ninety (990) months days after the date of such notice from Landlord; or B. The Leased Premises are damaged by any peril within nine months of the last day of the Lease Term and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety sixty days after the date such restoration is commenced.

Appears in 1 contract

Sources: Industrial Space Lease (Rackable Systems, Inc.)

Tenant’s Right to Terminate. If the Leased Premises are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant to this Article, then as soon as reasonably practicable, Landlord shall furnish Tenant with the written opinion of Landlord's ’s architect or construction consultant as to when the restoration work required of Landlord may be completecompleted. Should the Leased Premises be reasonably unsuitable for Tenant’s continued use of the same as a result of such damage, Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven ten (10) days after Tenant receives from Landlord the estimate of the time needed to complete such restoration: A. The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine One Hundred Eighty (9180) months days after the date of such notice from Landlord; damage, or B. The Leased Premises are damaged by any peril within nine months of the last day twelve (12) months of the Lease Term (and an option to extend, if any, has not been exercised), and, in the reasonable opinion of Landlord's ’s architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety Sixty (60) days after the date of such restoration is commenceddamage.

Appears in 1 contract

Sources: Lease Agreement (Spectrum Pharmaceuticals Inc)

Tenant’s Right to Terminate. If the Leased Premises Premises, the Building or the Outside Areas are damaged by any peril and Landlord does not elect to terminate this Lease or is not entitled to terminate this Lease pursuant Pursuant to this Article, then as soon as reasonably practicable, practicable no to exceed thirty (30) days Landlord shall furnish Tenant with the written opinion of Landlord's architect or construction consultant as to when the restoration work required of Landlord may be complete. Tenant shall have the option to terminate this Lease in the event any of the following occurs, which option may be exercised in the case of A or B below only by delivery to Landlord of a written notice of election to terminate within seven days after Tenant receives from form Landlord the estimate of the time needed to complete such restoration: A. : The Leased Premises are damaged by any peril and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within nine six (96) months after the date of such notice from Landlord; or B. or The Leased Premises are damaged by any peril within nine twelve (12) months of the last day of the Lease Term and, in the reasonable opinion of Landlord's architect or construction consultant, the restoration of the Leased Premises cannot be substantially completed within ninety days after the date such restoration is commenced.

Appears in 1 contract

Sources: Industrial Space Lease (Gatefield Corp)