Test Elements. The first Test Day shall require Seller to perform validation of the following for each Generating Unit (each a “Test Element”): Capability to achieve the Maximum Capacity Output within 10 minutes from being off-line. Capability to be started and achieve Minimum Load within the time(s) set forth in Appendix 1.02. Capability to achieve and maintain stated GU Contract Capacity; and in the case of the Initial Commercial Operation Test, set the GU Contract Capacity. Regulation Ramp Rates. Heat Rate at GU Contract Capacity. The applicable Test Parameters shall be used to correct the GU Contract Capacity and Heat Rate test data results in accordance with PART III.F. of this Appendix. The second (2nd) and third (3rd) day of the Test (not including no more than two (2) additional days if required to complete each Test Element) will be conducted at SCE’s sole discretion; provided, no performance measurements shall be taken. During this period, the Generating Unit(s) shall be operated to demonstrate MCO and/or Contract Capacity (as applicable), Minimum Load and respective ramp rates (ramp up and down) to the satisfaction of SCE.
Appears in 2 contracts
Sources: Resource Adequacy Purchase Agreement, Resource Adequacy Purchase Agreement