Test Pressure and Leakage. Test pressure shall be one and one-half times the maximum operating pressure (MOP) for gas lines measured at the pipeline low point or 100 psi, whichever is greater. Absolutely no pressure drop will be allowed during the test period. Minimum test period shall be twenty-four (24) hours. However, if, in the opinion of the Engineer, additional testing is required, such additional testing shall be performed by the Contractor at no additional expense to the Owner.
Appears in 1 contract
Sources: Amendment to Contract
Test Pressure and Leakage. Test pressure shall be one and one-half times the maximum operating pressure (MOP) for gas lines measured at the pipeline low point or 100 psi, whichever is greaterpoint. Absolutely no pressure drop will be allowed after temperature corrections have been made during the test period. Minimum test period shall be twenty-four (24) hours. However, if, in the opinion of the Engineer, additional testing is required, such additional testing shall be performed by the Contractor at no additional expense to the Owner.four
Appears in 1 contract
Sources: Amendment to Contract