Test Scenario Sample Clauses

Test Scenario. ‌ The test environment is the same as the one in Figure 21, which was used in Active Tag Network Construction Delay test. But in this test, only single ARTag is connected to 6LoRAs. In this structure, we’ve measured the delay of RFSurvey for a single ARTag with given EPCID.
Test Scenario. Currently the lines in the pilot are oversized with respect to the demand and generation it hosts, and consequently real critical events are not expected. Given this situation, critical events have been generated artificially by downsizing the ampacity parameter of specific line in the pilot. This allows creating artificially critical events associated to a congestion in the specified line segment without affecting the normal operation of the grid. At the same time, this strategy reduces uncertainty during the evaluation since the real location of the supposed congestion is known. The proposed test scenario is represented in the Figure 23. The red segment represents the relative position of the weakest part of the grid with the selected configuration set at [011] with all the load and generation connected to the same substation SS-B (SS030). The segment labelled as 155722 corresponds to the real segment which ampacity has been substantially reduced to, in somehow, simulate a thinner line. Switchgear configuration code corresponds to the triplet (SG1, SG3, SG2) and values represent 1/0 (closed/open).
Test Scenario. 1: LAN PC Conference - Create a conference room and join the room with 10 PC participants on a LAN - Talk among the 10 participants and validate that the audio quality is consistent with that of a G.723.1 codec - View participants in a conference room and see who are speaking

Related to Test Scenario

  • Test Results The employer, upon request from an employee or former employee, will provide the confidential written report issued pursuant to 4.9 of the Canadian Model in respect to that employee or former employee.

  • Laboratory Testing All laboratories selected by UPS Freight for analyzing Controlled Substances Testing will be HHS certified.

  • Random Drug Testing All employees covered by this Agreement shall be subject to random drug testing in accordance with Appendix D.

  • Drug Testing (A) The state and the PBA agree to drug testing of employees in accordance with section 112.0455, F.S., the Drug-Free Workplace Act. (B) All classes covered by this Agreement are designated special risk classes for drug testing purposes. Special risk means employees who are required as a condition of employment to be certified under Chapter 633 or Chapter 943, F.S. (C) An employee shall have the right to grieve any disciplinary action taken under section 112.0455, the Drug-Free Workplace Act, subject to the limitations on the grievability of disciplinary actions in Article 10. If an employee is not disciplined but is denied a demotion, reassignment, or promotion as a result of a positive confirmed drug test, the employee shall have the right to grieve such action in accordance with Article 6.

  • Stability Testing Patheon will conduct stability testing on the Products in accordance with the protocols set out in the Specifications for the separate fees and during the time periods set out in Schedule C. Patheon will not make any changes to these testing protocols without prior written approval from Client. If a confirmed stability test failure occurs, Patheon will notify Client within [***], after which Patheon and Client will jointly determine the proceedings and methods to be undertaken to investigate the cause of the failure, including which party will bear the cost of the investigation. Patheon will not be liable for these costs unless it has failed to perform the Manufacturing Services in accordance with the Specifications and cGMPs. Patheon will give Client all stability test data and results at Client’s request.