Common use of TESTING AND ACCEPTANCE CRITERIA Clause in Contracts

TESTING AND ACCEPTANCE CRITERIA. The material should get approval from the client before the actual supply start. Contractor within 30 days of issue of work order shall intimate Engineer in charge about the brand of material he intend to procure along with technical literature, past experience and other details about the manufacturer and arrange a visit of consultant to factory for inspection and testing of the material. The visit expenses (traveling, lodging and boarding) will be borne by client whereas the testing expenses will be born by the Contractor. Tensile strength test shall be done on one sample per every 20,000 sqm of geogrid/strap supplied. Manufacturer of the geogrid should provide “Manufacturers Test Certificate” for the tensile strength of geogrid/strap elements. In case of failure of any test /or contractor desire to source material from more than one manufacturer, the cost of visit in respect of additional source or visit for retesting by client and consultant shall be borne by Contractor. The cost of Airfare to &fro, Lodging& Boarding, shall be borne by contractor. It is not advisable to use geogrids/strap of different characteristics and inherent material properties together and that should not be allowed

Appears in 2 contracts

Sources: Epc Agreement, Epc Agreement