TESTING AND INSPECTION. 16 4.1 Pre-Commercial Operation Date Testing and Modifications. 16 4.2 Right to Observe Testing. 17 4.3 Right to Inspect. 17 ARTICLE 5. COMMUNICATIONS 17 5.1 Developer Obligations. 17 5.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 No Annexation. 18 ARTICLE 6. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 Provision and Application of Security 18 6.3 Line Outage Costs 18 ARTICLE 7. INVOICE 18 7.1 General. 18 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. 19 ARTICLE 8. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 Regulatory Requirements. 19 8.2 Governing Law. 20 ARTICLE 9. NOTICES 20 9.1 General. 20 9.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Alternative Forms of Notice 20 ARTICLE 10. FORCE MAJEURE 20 10.1 Force Majeure 20 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 No Consequential Damages. 23 12.3 Insurance 23 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 ARTICLE 14. SEVERABILITY 25 14.1 Severability 25 ARTICLE 15. COMPARABILITY 25 15.1 Comparability 25 ARTICLE 16. CONFIDENTIALITY 26 16.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 30
Appears in 6 contracts
Sources: Engineering, Procurement, and Construction Agreement, Engineering, Procurement, and Construction Agreement, Engineering, Procurement, and Construction Agreement
TESTING AND INSPECTION. 1621
4.1 6.1 Pre-Commercial Operation In Service Date Testing and Modifications. 16Modifications 21
4.2 6.2 Post-In-Service Date Testing and Modifications 22
6.3 Right to Observe Testing. 17 4.3 Testing 22 6.4 Right to InspectInspect 22 ARTICLE 7. 17 ARTICLE 5. COMMUNICATIONS 17 5.1 METERING 22 7.1 General 22 7.2 Check Meters 23 7.3 Standards 23 7.4 Testing of Metering Equipment 23 7.5 Metering Data 23 8.1 Transmission Developer Obligations. 17 5.2 Obligations 23 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 8.3 No AnnexationAnnexation 24 ARTICLE 9. 18 OPERATIONS 24 9.1 General 24 9.2 NYISO and Connecting Transmission Owner Obligations 25 9.3 Transmission Developer Obligations 25 9.4 Reserved 25 9.5 Outages and Interruptions 25 9.6 Switching and Tagging Rules 28 9.7 Disturbance Analysis Data Exchange 28 ARTICLE 610. MAINTENANCE 28 10.1 Connecting Transmission Owner Obligations 28 10.2 Transmission Developer Obligations 28 10.3 Coordination 29 10.4 Secondary Systems 29 10.5 Operating and Maintenance Expenses 29 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 29 11.1 Transmission Project 29 11.2 Network Upgrade Facilities 29 11.3 Special Provisions for Affected Systems 30 11.4 Provision and Application of Security 18 6.3 30 11.5 Forfeiture of Security 30 11.6 Network Upgrade Facility Costs 31 11.7 Line Outage Costs 18 31 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 32 12.1 General 32 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment32 12.3 Payment 32 12.4 Disputes 32 ARTICLE 13. 19 7.4 DisputesEMERGENCIES 33 13.1 Obligations 33 13.2 Notice 33 13.3 Immediate Action 33 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 19 33 13.5 Limited Liability 34 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 34 14.1 Regulatory Requirements. 19 8.2 Requirements 34 14.2 Governing Law. 20 Law 34 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 34 15.1 General 34 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 35 15.3 Alternative Forms of Notice 20 35 15.4 Operations and Maintenance Notice 35 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 35 17.1 General 35 17.2 Right to Terminate 36 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 36 18.1 Indemnity 21 12.2 36 18.2 No Consequential Damages. 23 12.3 Damages 37 18.3 Insurance 23 37 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 40 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 40 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 40 ARTICLE 1622. CONFIDENTIALITY 26 16.1 40 22.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 40 22.2 Term 41 22.3 Confidential Information Acquisition. 29 18.2 41 22.4 Scope 41 22.5 Release of Confidential Information Submission by Affected Transmission Owner. 29 18.3 Updated 41 22.6 Rights 42 22.7 No Warranties 42 22.8 Standard of Care 42 22.9 Order of Disclosure 42 22.10 Termination of Agreement 42 22.11 Remedies 43 22.12 Disclosure to FERC, its Staff, or a State 43 22.13 Required Notices Upon Requests or Demands for Confidential Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 3043
Appears in 3 contracts
Sources: Transmission Project Interconnection Agreement, Transmission Project Interconnection Agreement, Interconnection Agreement
TESTING AND INSPECTION. 16
4.1 Pre-Commercial Operation In-Service Date Testing and Modifications. Modifications 16
4.2 Right to Observe Testing. Testing 17 4.3 Right to Inspect. Inspect 17 ARTICLE 5. COMMUNICATIONS 17 5.1 Developer Obligations. Affected System Operator Obligations 17 5.2 Remote Terminal ▇▇▇▇ ▇▇ Unit 17 5.3 No Annexation. Annexation 18 ARTICLE 6. PERFORMANCE OBLIGATION 18 6.1 EPC Services. Services 18 6.2 Provision and Application of Security 18 6.3 Forfeiture of Security 18 6.4 Affected System Upgrade Facility Costs 19 6.5 Line Outage Costs 18 19 ARTICLE 7. INVOICE 18 19 7.1 General. 18 General 19 7.2 Refund of Remaining Security 19 20 7.3 Payment. 19 Payment 20 7.4 Disputes. 19 ARTICLE 8. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 Disputes 20 8.1 Regulatory Requirements. 19 Requirements 20 8.2 Governing Law. Law 20 ARTICLE 9. NOTICES 20 21
9.1 General. 20 General 21 9.2 ▇▇▇▇▇▇▇▇ and Payments. 20 Payments 21 9.3 Alternative Forms of Notice 20 21 ARTICLE 10. FORCE MAJEURE 20 10.1 Force Majeure 20 21 ARTICLE 11. DEFAULT 21 22 11.1 Default 21 General 22 11.2 Right to Terminate 22 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 22 12.1 Indemnity 21 22 12.2 No Consequential Damages. Damages 23 12.3 Insurance 23 24 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 26 ARTICLE 14. SEVERABILITY 25 14.1 Severability 25 27 ARTICLE 15. COMPARABILITY 25 15.1 Comparability 25 27 ARTICLE 16. CONFIDENTIALITY 26 27 16.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 27 16.2 Term 27 16.3 Confidential Information 27 16.4 Scope 27 16.5 Release of Confidential Information 28 16.6 Rights 28 16.7 No Warranties 28 16.8 Standard of Care 28 16.9 Order of Disclosure 29 17.1 Developer and Affected Transmission Owner Notice 16.10 Termination of Agreement 29 ARTICLE 18. INFORMATION REQUIREMENT 16.11 Remedies 29 18.1 16.12 Disclosure to FERC, its Staff, or a State 29 16.13 Required Notices Upon Requests or Demands for Confidential Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 30
Appears in 2 contracts
Sources: Engineering, Procurement, and Construction Agreement, Service Agreement
TESTING AND INSPECTION. 1621
4.1 6.1 Pre-Commercial Operation In Service Date Testing and Modifications. 16Modifications 21
4.2 6.2 Post-In-Service Date Testing and Modifications 22
6.3 Right to Observe Testing. 17 4.3 Testing 22 6.4 Right to InspectInspect 22 ARTICLE 7. 17 ARTICLE 5. COMMUNICATIONS 17 5.1 METERING 22 7.1 General 22 7.2 Check Meters 23 7.3 Standards 23 7.4 Testing of Metering Equipment 23 7.5 Metering Data 23 8.1 Transmission Developer Obligations. 17 5.2 Obligations 23 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 Unit 24 8.3 No AnnexationAnnexation 24 ARTICLE 9. 18 OPERATIONS 24 9.1 General 24 9.2 NYISO and Connecting Transmission Owner Obligations 25 9.3 Transmission Developer Obligations 25 9.4 Reserved 25 9.5 Outages and Interruptions 25 9.6 Switching and Tagging Rules 28 9.7 Disturbance Analysis Data Exchange 28 ARTICLE 610. MAINTENANCE 28 10.1 Connecting Transmission Owner Obligations 28 10.2 Transmission Developer Obligations 28 10.3 Coordination 29 10.4 Secondary Systems 29 10.5 Operating and Maintenance Expenses 29 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 29 11.1 Transmission Project 29 11.2 Network Upgrade Facilities 29 11.3 Special Provisions for Affected Systems 30 11.4 Provision and Application of Security 18 6.3 30 11.5 Forfeiture of Security 30 11.6 Network Upgrade Facility Costs 31 11.7 Line Outage Costs 18 31 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 32 12.1 General 32 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment32 12.3 Payment 32 12.4 Disputes 32 ARTICLE 13. 19 7.4 DisputesEMERGENCIES 33 13.1 Obligations 33 13.2 Notice 33 13.3 Immediate Action 33 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 19 33 13.5 Limited Liability 34 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 34 14.1 Regulatory Requirements. 19 8.2 Requirements 34 14.2 Governing Law. 20 Law 34 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 34 15.1 General 34 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 35 15.3 Alternative Forms of Notice 20 35 15.4 Operations and Maintenance Notice 35 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 35 17.1 General 35 17.2 Right to Terminate 36 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 36 18.1 Indemnity 21 12.2 36 18.2 No Consequential Damages. 23 12.3 Damages 37 18.3 Insurance 23 37 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 40 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 40 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 40 ARTICLE 1622. CONFIDENTIALITY 26 16.1 40 22.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 40 22.2 Term 41 22.3 Confidential Information Acquisition. 29 18.2 41 22.4 Scope 41 22.5 Release of Confidential Information Submission by Affected Transmission Owner. 29 18.3 Updated 41 22.6 Rights 42 22.7 No Warranties 42 22.8 Standard of Care 42 22.9 Order of Disclosure 42 22.10 Termination of Agreement 42 22.11 Remedies 43 22.12 Disclosure to FERC, its Staff, or a State 43 22.13 Required Notices Upon Requests or Demands for Confidential Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 3043
Appears in 2 contracts
Sources: Interconnection Agreement, Interconnection Agreement
TESTING AND INSPECTION. 1623
4.1 6.1 Pre-Commercial Operation In-Service Date Testing and Modifications. 16Modifications 23
4.2 6.2 Post-In-Service Date Testing and Modifications 23
6.3 Right to Observe Testing. 17 4.3 Testing 24 6.4 Right to InspectInspect 24 ARTICLE 7. 17 ARTICLE 5METERING 24 7.1 General 24 7.2 Check Meters 24 7.3 Standards 25 7.4 Testing of Metering Equipment 25 7.5 Metering Data 25 8.1 Transmission Developer Obligations 25 SERVICE AGREEMENT NO. COMMUNICATIONS 17 5.1 Developer Obligations. 17 5.2 2599 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 8.3 No AnnexationAnnexation 26 ARTICLE 9. 18 OPERATIONS 26 9.1 General 26 9.2 NYISO and Connecting Transmission Owner Obligations 26 9.3 Transmission Developer Obligations 27
9.4 Outages and Interruptions 27
9.5 Switching and Tagging Rules 30 9.6 Disturbance Analysis Data Exchange 30 ARTICLE 610. MAINTENANCE 30 10.1 Connecting Transmission Owner Obligations 30 10.2 Transmission Developer Obligations 30 10.3 Coordination 30 10.4 Secondary Systems 31 10.5 Operating and Maintenance Expenses 31 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 31 11.1 Transmission Project 31 11.2 Network Upgrade Facilities 31 11.3 Special Provisions for Affected Systems 31 11.4 Provision and Application of Security 18 6.3 32 11.5 Forfeiture of Security 32 11.6 Network Upgrade Facility Costs 33 11.7 Line Outage Costs 18 33 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 33 12.1 General 33 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment34 12.3 Payment 34 12.4 Disputes 34 ARTICLE 13. 19 7.4 DisputesEMERGENCIES 34 13.1 Obligations 34 13.2 Notice 35 13.3 Immediate Action 35 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 19 35 13.5 Limited Liability 35 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 35 14.1 Regulatory Requirements. 19 8.2 Requirements 35 14.2 Governing Law. 20 Law 36 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 36 15.1 General 36 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 36 15.3 Alternative Forms of Notice 20 36 15.4 Operations and Maintenance Notice 36 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 36 ARTICLE 1117. DEFAULT 21 11.1 Default 21 37 17.1 General 37 SERVICE AGREEMENT NO. 2599 17.2 Right to Terminate 37 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 37 18.1 Indemnity 21 12.2 37 18.2 No Consequential Damages. 23 12.3 Damages 39 18.3 Insurance 23 39 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 41 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 42 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 42 ARTICLE 1622. CONFIDENTIALITY 26 16.1 42 22.1 Confidentiality 26 42 22.2 Term 42 22.3 Confidential Information 43 22.4 Scope 43 22.5 Release of Confidential Information 43 22.6 Rights 43 22.7 No Warranties 44 22.8 Standard of Care 44 22.9 Order of Disclosure 44 22.10 Termination of Agreement 44 22.11 Remedies 44 22.12 Disclosure to FERC, its Staff, or a State 45 22.13 Required Notices Upon Requests or Demands for Confidential Information . 45 ARTICLE 1723. TRANSMISSION DEVELOPER AND CONNECTING TRANSMISSION OWNER NOTICES OF ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 45 ARTICLE 1824. INFORMATION REQUIREMENT 29 18.1 46 24.1 Information Acquisition. 29 18.2 Acquisition 46 24.2 Information Submission by Affected Transmission Owner. 29 18.3 Concerning the Network Upgrade Facilities 46 24.3 Updated Information Submission Concerning the Transmission Project 46 24.4 Information Supplementation 47 ARTICLE 25. INFORMATION ACCESS AND AUDIT RIGHTS 47 25.1 Information Access 47 25.2 Reporting of Non-Force Majeure Events 47 25.3 Audit Rights 48 25.4 Audit Rights Periods 48 25.5 Audit Results 48 ARTICLE 26. SUBCONTRACTORS 49 26.1 General 49 26.2 Responsibility of Principal 49 26.3 No Limitation by NYISO Insurance 49 ARTICLE 27. DISPUTES 49 27.1 Submission 49 27.2 External Arbitration Procedures 49 27.3 Arbitration Decisions 50 27.4 Costs 50 27.5 Termination 50 SERVICE AGREEMENT NO. 2599 28.1 General 50 ARTICLE 29. MISCELLANEOUS 51 29.1 Binding Effect 51 29.2 Conflicts 51 29.3 Rules of Interpretation 51 29.4 Compliance 52 29.5 Joint and Developer 30 18.4 Information SupplementationSeveral Obligations 52 29.6 Entire Agreement 52 29.7 No Third Party Beneficiaries 52 29.8 Waiver 53 29.9 Headings 53 29.10 Multiple Counterparts 53 29.11 Amendment 53 29.12 Modification by the Parties 53 29.13 Reservation of Rights 53 29.14 No Partnership 54 29.15 Other Transmission Rights 54 Appendices SERVICE AGREEMENT NO. 302599 THIS TRANSMISSION PROJECT INTERCONNECTION AGREEMENT ("Agreement") is made and entered into this 19th day of February, 2021, by and among New York Transco, LLC, a limited liability company organized and existing under the laws of the State of New York ("Transmission Developer" with a Transmission Project), the New York Independent System Operator, Inc., a not-for-profit corporation organized and existing under the laws of the State of New York ("NYISO"), and Niagara Mohawk Power Corporation d/b/a National Grid a corporation organized and existing under the laws of the State of New York ("Connecting Transmission Owner"). Transmission Developer, the NYISO, or Connecting Transmission Owner each may be referred to as a "Party" or collectively referred to as the "Parties."
Appears in 2 contracts
Sources: Transmission Project Interconnection Agreement, Transmission Project Interconnection Agreement
TESTING AND INSPECTION. 1629
4.1 6.1 Pre-Commercial Operation Date Testing and Modifications. 16Modifications 29
4.2 6.2 Post-Commercial Operation Date Testing and Modifications 29
6.3 Right to Observe Testing. 17 4.3 Testing 30 6.4 Right to InspectInspect 30 ARTICLE 7. 17 METERING 30 7.1 General 30 7.2 Check Meters 31 7.3 Standards 31 i SERVICE AGREEMENT NO. 1894 7.4 Testing of Metering Equipment 31 7.5 Metering Data 31 ARTICLE 58. COMMUNICATIONS 17 5.1 32 8.1 Developer Obligations. 17 5.2 Obligations 32 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 Unit 32 8.3 No AnnexationAnnexation 32 ARTICLE 9. 18 OPERATIONS 33 9.1 General 33 9.2 NYISO and Connecting Transmission Owner Obligations 33 9.3 Developer Obligations 33 9.4 Start-Up and Synchronization 33
9.5 Real and Reactive Power Control and Primary Frequency Response 33 9.6 Outages and Interruptions 35 9.7 Switching and Tagging Rules 38 9.8 Use of Attachment Facilities by Third Parties 39 9.9 Disturbance Analysis Data Exchange 39 9.10 Phasor Measurement Units 39 ARTICLE 610. MAINTENANCE 40 10.1 Connecting Transmission Owner Obligations 40 10.2 Developer Obligations 40 10.3 Coordination 40 10.4 Secondary Systems 40 10.5 Operating and Maintenance Expenses 41 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 41 11.1 Developer’s Attachment Facilities 41 11.2 Connecting Transmission Owner’s Attachment Facilities 41 11.3 System Upgrade Facilities and System Deliverability Upgrades 41 11.4 Special Provisions for Affected Systems 41 11.5 Provision and Application of Security 18 6.3 42 11.6 Developer Compensation for Emergency Services 42 11.7 Line Outage Costs 18 42 ARTICLE 712. INVOICE 18 7.1 General42 12.1 General 42 12.2 Final Invoice 43 12.3 Payment 43 12.4 Disputes 43 ARTICLE 13. 18 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. 19 EMERGENCIES 44 13.1 Obligations 44 13.2 Notice 44 13.3 Immediate Action 44 13.4 NYISO and Connecting Transmission Owner Authority 44 13.5 Developer Authority 45 13.6 Limited Liability 45 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 46 14.1 Regulatory RequirementsRequirements 46 14.2 Governing Law 46 ii SERVICE AGREEMENT NO. 19 8.2 Governing Law. 20 ARTICLE 9. NOTICES 20 9.1 General. 20 9.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Alternative Forms of Notice 20 ARTICLE 10. FORCE MAJEURE 20 10.1 Force Majeure 20 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 No Consequential Damages. 23 12.3 Insurance 23 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 ARTICLE 14. SEVERABILITY 25 14.1 Severability 25 ARTICLE 15. COMPARABILITY 25 15.1 Comparability 25 ARTICLE 16. CONFIDENTIALITY 26 16.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 301894
Appears in 2 contracts
Sources: Standard Large Generator Interconnection Agreement, Standard Large Generator Interconnection Agreement
TESTING AND INSPECTION. 1623
4.1 6.1 Pre-Commercial Operation In-Service Date Testing and Modifications. 16Modifications 23
4.2 6.2 Post-In-Service Date Testing and Modifications 23
6.3 Right to Observe Testing. 17 4.3 Testing 24 6.4 Right to InspectInspect 24 ARTICLE 7. 17 METERING 24 7.1 General 24 7.2 Check Meters 24 7.3 Standards 25 7.4 Testing of Metering Equipment 25 7.5 Metering Data 25 ARTICLE 58. COMMUNICATIONS 17 5.1 25 8.1 Transmission Developer ObligationsObligations 25 i SERVICE AGREEMENT NO. 17 5.2 2599 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 8.3 No AnnexationAnnexation 26 ARTICLE 9. 18 OPERATIONS 26 9.1 General 26 9.2 NYISO and Connecting Transmission Owner Obligations 26 9.3 Transmission Developer Obligations 27
9.4 Outages and Interruptions 27
9.5 Switching and Tagging Rules 30 9.6 Disturbance Analysis Data Exchange 30 ARTICLE 610. MAINTENANCE 30 10.1 Connecting Transmission Owner Obligations 30 10.2 Transmission Developer Obligations 30 10.3 Coordination 30 10.4 Secondary Systems 31 10.5 Operating and Maintenance Expenses 31 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 31 11.1 Transmission Project 31 11.2 Network Upgrade Facilities 31 11.3 Special Provisions for Affected Systems 31 11.4 Provision and Application of Security 18 6.3 32 11.5 Forfeiture of Security 32 11.6 Network Upgrade Facility Costs 33 11.7 Line Outage Costs 18 33 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 33 12.1 General 33 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment34 12.3 Payment 34 12.4 Disputes 34 ARTICLE 13. 19 7.4 DisputesEMERGENCIES 34 13.1 Obligations 34 13.2 Notice 35 13.3 Immediate Action 35 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 19 35 13.5 Limited Liability 35 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 35 14.1 Regulatory Requirements. 19 8.2 Requirements 35 14.2 Governing Law. 20 Law 36 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 36 15.1 General 36 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 36 15.3 Alternative Forms of Notice 20 36 15.4 Operations and Maintenance Notice 36 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 36 ARTICLE 1117. DEFAULT 21 11.1 Default 21 37 17.1 General 37 ii SERVICE AGREEMENT NO. 2599 17.2 Right to Terminate 37 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 37 18.1 Indemnity 21 12.2 37 18.2 No Consequential Damages. 23 12.3 Damages 39 18.3 Insurance 23 39 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 41 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 42 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 42 ARTICLE 1622. CONFIDENTIALITY 26 16.1 42 22.1 Confidentiality 26 ARTICLE 1742 22.2 Term 42 22.3 Confidential Information 43 22.4 Scope 43 22.5 Release of Confidential Information 43 22.6 Rights 43 22.7 No Warranties 44 22.8 Standard of Care 44 22.9 Order of Disclosure 44 22.10 Termination of Agreement 44 22.11 Remedies 44 22.12 Disclosure to FERC, its Staff, or a State 45 22.13 Required Notices Upon Requests or Demands for Confidential Information . ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 3045
Appears in 2 contracts
Sources: Service Agreement, Interconnection Agreement
TESTING AND INSPECTION. 16
4.1 Pre-Commercial Operation In-Service Date Testing and Modifications. Modifications 16
4.2 Right to Observe Testing. Testing 17 4.3 Right to Inspect. Inspect 17 ARTICLE 5. COMMUNICATIONS 17 5.1 Developer Obligations. Affected System Operator Obligations 17 5.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 No Annexation. Annexation 18 ARTICLE 6. PERFORMANCE OBLIGATION 18 6.1 EPC Services. Services 18 6.2 Provision and Application of Security 18 6.3 Forfeiture of Security 18 6.4 Affected System Upgrade Facility Costs 19 6.5 Line Outage Costs 18 19 ARTICLE 7. INVOICE 18 19 7.1 General. 18 General 19 7.2 Refund of Remaining Security 19 20 7.3 Payment. 19 Payment 20 7.4 Disputes. 19 Disputes 20 ARTICLE 8. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 20 SERVICE AGREEMENT NO. 2635 8.1 Regulatory Requirements. 19 Requirements 20 8.2 Governing Law. Law 20 ARTICLE 9. NOTICES 20 21
9.1 General. 20 General 21 9.2 ▇▇▇▇▇▇▇▇ and Payments. 20 Payments 21 9.3 Alternative Forms of Notice 20 21 ARTICLE 10. FORCE MAJEURE 20 10.1 Force Majeure 20 21 ARTICLE 11. DEFAULT 21 22 11.1 Default 21 General 22 11.2 Right to Terminate 22 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 22 12.1 Indemnity 21 22 12.2 No Consequential Damages. Damages 23 12.3 Insurance 23 24 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 26 ARTICLE 14. SEVERABILITY 25 14.1 Severability 25 27 ARTICLE 15. COMPARABILITY 25 15.1 Comparability 25 27 ARTICLE 16. CONFIDENTIALITY 26 27 16.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 27 16.2 Term 27 16.3 Confidential Information 27 16.4 Scope 27 16.5 Release of Confidential Information 28 16.6 Rights 28 16.7 No Warranties 28 16.8 Standard of Care 28 16.9 Order of Disclosure 29 17.1 Developer and Affected Transmission Owner Notice 16.10 Termination of Agreement 29 ARTICLE 18. INFORMATION REQUIREMENT 16.11 Remedies 29 18.1 16.12 Disclosure to FERC, its Staff, or a State 29 16.13 Required Notices Upon Requests or Demands for Confidential Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. ..30
Appears in 2 contracts
Sources: Engineering, Procurement, and Construction Agreement, Engineering, Procurement, and Construction Agreement
TESTING AND INSPECTION. 1621
4.1 6.1 Pre-Commercial Operation In Service Date Testing and Modifications. 16Modifications 21
4.2 6.2 Post-In-Service Date Testing and Modifications 22
6.3 Right to Observe Testing. 17 4.3 Testing 22 6.4 Right to InspectInspect 22 ARTICLE 7. 17 METERING 22 7.1 General 22 7.2 Check Meters 23 7.3 Standards 23 7.4 Testing of Metering Equipment 23 7.5 Metering Data 23 ARTICLE 58. COMMUNICATIONS 17 5.1 23 8.1 Transmission Developer ObligationsObligations 23 i SERVICE AGREEMENT NO. 17 5.2 2603 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 8.3 No AnnexationAnnexation 24 ARTICLE 9. 18 OPERATIONS 24 9.1 General 24 9.2 NYISO and Connecting Transmission Owner Obligations 25 9.3 Transmission Developer Obligations 25 9.4 Reserved 25 9.5 Outages and Interruptions 25 9.6 Switching and Tagging Rules 28 9.7 Disturbance Analysis Data Exchange 28 ARTICLE 610. MAINTENANCE 28 10.1 Connecting Transmission Owner Obligations 28 10.2 Transmission Developer Obligations 28 10.3 Coordination 29 10.4 Secondary Systems 29 10.5 Operating and Maintenance Expenses 29 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 29 11.1 Transmission Project 29 11.2 Network Upgrade Facilities 29 11.3 Special Provisions for Affected Systems 30 11.4 Provision and Application of Security 18 6.3 30 11.5 Forfeiture of Security 30 11.6 Network Upgrade Facility Costs 31 11.7 Line Outage Costs 18 31 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 32 12.1 General 32 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment32 12.3 Payment 32 12.4 Disputes 32 ARTICLE 13. 19 7.4 DisputesEMERGENCIES 33 13.1 Obligations 33 13.2 Notice 33 13.3 Immediate Action 33 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 19 33 13.5 Limited Liability 34 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 34 14.1 Regulatory Requirements. 19 8.2 Requirements 34 14.2 Governing Law. 20 Law 34 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 34 15.1 General 34 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 35 15.3 Alternative Forms of Notice 20 35 15.4 Operations and Maintenance Notice 35 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 35 ARTICLE 1117. DEFAULT 21 11.1 Default 21 35 ii SERVICE AGREEMENT NO. 2603 17.1 General 35 17.2 Right to Terminate 36 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 36 18.1 Indemnity 21 12.2 36 18.2 No Consequential Damages. 23 12.3 Damages 37 18.3 Insurance 23 37 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 40 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 40 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 40 ARTICLE 1622. CONFIDENTIALITY 26 16.1 40 22.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 40 22.2 Term 41 22.3 Confidential Information Acquisition. 29 18.2 41 22.4 Scope 41 22.5 Release of Confidential Information Submission by Affected Transmission Owner. 29 18.3 Updated 41 22.6 Rights 42 22.7 No Warranties 42 22.8 Standard of Care 42 22.9 Order of Disclosure 42 22.10 Termination of Agreement 42 22.11 Remedies 43 22.12 Disclosure to FERC, its Staff, or a State 43 22.13 Required Notices Upon Requests or Demands for Confidential Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 30..43
Appears in 2 contracts
Sources: Interconnection Agreement, Interconnection Agreement
TESTING AND INSPECTION. 1629
4.1 6.1 Pre-Commercial Operation Date Testing and Modifications. 16Modifications 29
4.2 6.2 Post-Commercial Operation Date Testing and Modifications 29
6.3 Right to Observe Testing. 17 4.3 Testing 29 6.4 Right to InspectInspect 29 ARTICLE 7. 17 METERING 30 7.1 General 30 7.2 Check Meters 30 i 7.3 Standards 30 7.4 Testing of Metering Equipment 31 7.5 Metering Data 31 ARTICLE 58. COMMUNICATIONS 17 5.1 31 8.1 Developer Obligations. 17 5.2 Obligations 31 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 8.3 No AnnexationAnnexation 32 ARTICLE 9. 18 OPERATIONS 32 9.1 General 32 9.2 NYISO and Connecting Transmission Owner Obligations 32 9.3 Developer Obligations 32 9.4 Start-Up and Synchronization 33 9.5 Real and Reactive Power Control 33 9.6 Outages and Interruptions 34 9.7 Switching and Tagging Rules 37 9.8 Use of Attachment Facilities by Third Parties 38 9.9 Disturbance Analysis Data Exchange 38 ARTICLE 610. MAINTENANCE 38 10.1 Connecting Transmission Owner Obligations 38 10.2 Developer Obligations 38 10.3 Coordination 39 10.4 Secondary Systems 39 10.5 Operating and Maintenance Expenses 39 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 39 11.1 Developer Attachment Facilities 39 11.2 Connecting Transmission Owner’s Attachment Facilities 39
11.3 System Upgrade Facilities and System Deliverability Upgrades 40
11.4 Special Provisions for Affected Systems 40 11.5 Provision and Application of Security 18 6.3 40 11.6 Developer Compensation for Emergency Services 41 11.7 Line Outage Costs 18 41 ARTICLE 712. INVOICE 18 7.1 General41 12.1 General 41 12.2 Final Invoice 41 12.3 Payment 41 12.4 Disputes 42 ARTICLE 13. 18 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. 19 EMERGENCIES 42 13.1 Obligations 42 13.2 Notice 42 13.3 Immediate Action 42 13.4 NYISO and Connecting Transmission Owner Authority 43 13.5 Developer Authority 44 13.6 Limited Liability 44 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 44 14.1 Regulatory Requirements. 19 8.2 Requirements 44 14.2 Governing Law. 20 Law 44 ii ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 45 15.1 General 45 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 45 15.3 Alternative Forms of Notice 20 45 15.4 Operations and Maintenance Notice 45 ARTICLE 1016. FORCE MAJEURE 20 10.1 45 16.1 Force Majeure 20 45 ARTICLE 1117. DEFAULT 21 11.1 46 17.1 Default 21 46 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 46 18.1 Indemnity 21 12.2 46 18.2 No Consequential Damages. 23 12.3 Damages 48 18.3 Insurance 23 48 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 49 19.1 Assignment 50 ARTICLE 1420. SEVERABILITY 25 14.1 50 20.1 Severability 25 50 ARTICLE 1521. COMPARABILITY 25 15.1 50 21.1 Comparability 25 50 ARTICLE 1622. CONFIDENTIALITY 26 16.1 51 22.1 Confidentiality 26 51 ARTICLE 1723. ENVIRONMENTAL RELEASES 29 17.1 54 23.1 Developer and Affected Connecting Transmission Owner Notice 29 54 ARTICLE 1824. INFORMATION REQUIREMENT 29 18.1 54 24.1 Information Acquisition. 29 18.2 Acquisition 54 24.2 Information Submission by Affected Connecting Transmission Owner. 29 18.3 Owner 54 24.3 Updated Information Submission by NYISO Developer 55 24.4 Information Supplementation 55 ARTICLE 25. INFORMATION ACCESS AND AUDIT RIGHTS 56 25.1 Information Access 56 25.2 Reporting of Non-Force Majeure Events 56 25.3 Audit Rights 56 25.4 Audit Rights Periods 57 25.5 Audit Results 57 ARTICLE 26. SUBCONTRACTORS 57 26.1 General 57 26.2 Responsibility of Principal 57 26.3 No Limitation by Insurance 58 ARTICLE 27. DISPUTES 58 27.1 Submission 58 27.2 External Arbitration Procedures 58 27.3 Arbitration Decisions 59 27.4 Costs 59 27.5 Termination 59 ARTICLE 28. REPRESENTATIONS, WARRANTIES AND COVENANTS 59 28.1 General 59 iii ARTICLE 29. MISCELLANEOUS 60 29.1 Binding Effect 60 29.2 Conflicts 60 29.3 Rules of Interpretation 60 29.4 Compliance 61 29.5 Joint and Developer 30 18.4 Information Supplementation. 30Several Obligations 61 29.6 Entire Agreement 61 29.7 No Third Party Beneficiaries 61 29.8 Waiver 62 29.9 Headings 62 29.10 Multiple Counterparts 62 29.11 Amendment 62 29.12 Modification by the Parties 62 29.13 Reservation of Rights 62 29.14 No Partnership 63 29.15 Other Transmission Rights 63 Appendices
Appears in 1 contract
Sources: Service Agreement
TESTING AND INSPECTION. 1623
4.1 6.1 Pre-Commercial Operation In-Service Date Testing and Modifications. 16Modifications 23
4.2 6.2 Post-In-Service Date Testing and Modifications 23
6.3 Right to Observe Testing. 17 4.3 Testing 24 6.4 Right to InspectInspect 24 ARTICLE 7. 17 METERING 24 7.1 General 24 7.2 Check Meters 24 7.3 Standards 25 7.4 Testing of Metering Equipment 25 7.5 Metering Data 25 ARTICLE 58. COMMUNICATIONS 17 5.1 25 8.1 Transmission Developer ObligationsObligations 25 i SERVICE AGREEMENT NO. 17 5.2 2605 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 Unit 26 8.3 No AnnexationAnnexation 26 ARTICLE 9. 18 OPERATIONS 26 9.1 General 26 9.2 NYISO and Connecting Transmission Owner Obligations 26 9.3 Transmission Developer Obligations 27
9.4 Outages and Interruptions 27
9.5 Switching and Tagging Rules 30 9.6 Disturbance Analysis Data Exchange 30 ARTICLE 610. MAINTENANCE 30 10.1 Connecting Transmission Owner Obligations 30 10.2 Transmission Developer Obligations 30 10.3 Coordination 30 10.4 Secondary Systems 31 10.5 Operating and Maintenance Expenses 31 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 31 11.1 Transmission Project 31 11.2 Network Upgrade Facilities 31 11.3 Special Provisions for Affected Systems 31 11.4 Provision and Application of Security 18 6.3 32 11.5 Forfeiture of Security 32 11.6 Network Upgrade Facility Costs 33 11.7 Line Outage Costs 18 33 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 33 12.1 General 33 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment34 12.3 Payment 34 12.4 Disputes 34 ARTICLE 13. 19 7.4 DisputesEMERGENCIES 34 13.1 Obligations 34 13.2 Notice 35 13.3 Immediate Action 35 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 19 35 13.5 Limited Liability 35 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 35 14.1 Regulatory Requirements. 19 8.2 Requirements 35 14.2 Governing Law. 20 Law 36 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 36 15.1 General 36 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 36 15.3 Alternative Forms of Notice 20 36 15.4 Operations and Maintenance Notice 36 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 36 ARTICLE 1117. DEFAULT 21 11.1 Default 21 37 17.1 General 37 ii SERVICE AGREEMENT NO. 2605
17.2 Right to Terminate 37 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 37 18.1 Indemnity 21 12.2 37 18.2 No Consequential Damages. 23 12.3 Damages 39 18.3 Insurance 23 39 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 41 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 42 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 42 ARTICLE 1622. CONFIDENTIALITY 26 16.1 42 22.1 Confidentiality 26 ARTICLE 1742 22.2 Term 42 22.3 Confidential Information 43 22.4 Scope 43 22.5 Release of Confidential Information 43 22.6 Rights 43 22.7 No Warranties 44 22.8 Standard of Care 44 22.9 Order of Disclosure 44 22.10 Termination of Agreement 44 22.11 Remedies 44 22.12 Disclosure to FERC, its Staff, or a State 45 22.13 Required Notices Upon Requests or Demands for Confidential Information . ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 3045
Appears in 1 contract
Sources: Interconnection Agreement
TESTING AND INSPECTION. 1621
4.1 6.1 Pre-Commercial Operation In Service Date Testing and Modifications. 16Modifications 21
4.2 6.2 Post-In-Service Date Testing and Modifications 22
6.3 Right to Observe Testing. 17 4.3 Testing 22 6.4 Right to InspectInspect 22 ARTICLE 7. 17 ARTICLE 5. COMMUNICATIONS 17 5.1 METERING 22 7.1 General 22 7.2 Check Meters 23 7.3 Standards 23 7.4 Testing of Metering Equipment 23 7.5 Metering Data 23 8.1 Transmission Developer Obligations. 17 5.2 Obligations 23 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 Unit 24 8.3 No AnnexationAnnexation 24 ARTICLE 9. 18 OPERATIONS 24 9.1 General 24 9.2 NYISO and Connecting Transmission Owner Obligations 25 9.3 Transmission Developer Obligations 25 9.4 Reserved 25 9.5 Outages and Interruptions 25 9.6 Switching and Tagging Rules 28 9.7 Disturbance Analysis Data Exchange 28 ARTICLE 610. MAINTENANCE 28 10.1 Connecting Transmission Owner Obligations 28 10.2 Transmission Developer Obligations 28 10.3 Coordination 29 10.4 Secondary Systems 29 10.5 Operating and Maintenance Expenses 29 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 29 11.1 Transmission Project 29 11.2 Network Upgrade Facilities 29 11.3 Special Provisions for Affected Systems 30 11.4 Provision and Application of Security 18 6.3 30 11.5 Forfeiture of Security 30 11.6 Network Upgrade Facility Costs 31 11.7 Line Outage Costs 18 31 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 32 12.1 General 32 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment32 12.3 Payment 32 12.4 Disputes 32 ARTICLE 13. 19 7.4 DisputesEMERGENCIES 33 13.1 Obligations 33 13.2 Notice 33 13.3 Immediate Action 33 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 19 33 13.5 Limited Liability 34 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 34 14.1 Regulatory Requirements. 19 8.2 Requirements 34 14.2 Governing Law. 20 Law 34 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 ▇▇▇▇▇▇▇▇ 34 15.1 General 34 15.2 Billings and Payments. 20 9.3 Payments 35 15.3 Alternative Forms of Notice 20 35 15.4 Operations and Maintenance Notice 35 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 35 17.1 General 35 17.2 Right to Terminate 36 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 36 18.1 Indemnity 21 12.2 36 18.2 No Consequential Damages. 23 12.3 Damages 37 18.3 Insurance 23 37 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 40 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 40 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 40 ARTICLE 1622. CONFIDENTIALITY 26 16.1 40 22.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 40 22.2 Term 41 22.3 Confidential Information Acquisition. 29 18.2 41 22.4 Scope 41 22.5 Release of Confidential Information Submission by Affected Transmission Owner. 29 18.3 Updated 41 22.6 Rights 42 22.7 No Warranties 42 22.8 Standard of Care 42 22.9 Order of Disclosure 42 22.10 Termination of Agreement 42 22.11 Remedies 43 22.12 Disclosure to FERC, its Staff, or a State 43 22.13 Required Notices Upon Requests or Demands for Confidential Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 3043
Appears in 1 contract
Sources: Interconnection Agreement
TESTING AND INSPECTION. 1629
4.1 6.1 Pre-Commercial Operation Date Testing and Modifications. 16Modifications 29
4.2 6.2 Post-Commercial Operation Date Testing and Modifications 29
6.3 Right to Observe Testing. 17 4.3 Testing 30 6.4 Right to InspectInspect 30 ARTICLE 7. 17 METERING 30 7.1 General 30 7.2 Check Meters 31 7.3 Standards 31 i SERVICE AGREEMENT NO. 2811 7.4 Testing of Metering Equipment 31 7.5 Metering Data 31 ARTICLE 58. COMMUNICATIONS 17 5.1 32 8.1 Developer Obligations. 17 5.2 Obligations 32 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 Unit 32 8.3 No AnnexationAnnexation 32 ARTICLE 9. 18 OPERATIONS 32 9.1 General 32 9.2 NYISO and Connecting Transmission Owner Obligations 33 9.3 Developer Obligations 33 9.4 Start-Up and Synchronization 33
9.5 Real and Reactive Power Control and Primary Frequency Response 33 9.6 Outages and Interruptions 37 9.7 Switching and Tagging Rules 41 9.8 Use of Attachment Facilities by Third Parties 41 9.9 Disturbance Analysis Data Exchange 41 9.10 Reserved 42 ARTICLE 610. MAINTENANCE 42 10.1 Connecting Transmission Owner Obligations 42 10.2 Developer Obligations 42 10.3 Coordination 42 10.4 Secondary Systems 42 10.5 Operating and Maintenance Expenses 42 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 43 11.1 Developer’s Attachment Facilities 43 11.2 Connecting Transmission Owner’s Attachment Facilities 43
11.3 System Upgrade Facilities and System Deliverability Upgrades 43
11.4 Special Provisions for Affected Systems 43 11.5 Provision and Application of Security 18 6.3 43 11.6 Developer Compensation for Emergency Services 44 11.7 Line Outage Costs 18 44 ARTICLE 712. INVOICE 18 7.1 General44 12.1 General 44 12.2 Final Invoice 44 12.3 Payment 45 12.4 Disputes 45 ARTICLE 13. 18 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. 19 EMERGENCIES 45 13.1 Obligations 45 13.2 Notice 45 13.3 Immediate Action 46 13.4 NYISO and Connecting Transmission Owner Authority 46 13.5 Developer Authority 47 13.6 Limited Liability 47 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 47 14.1 Regulatory RequirementsRequirements 47 14.2 Governing Law 47 ii SERVICE AGREEMENT NO. 19 8.2 Governing Law. 20 ARTICLE 9. NOTICES 20 9.1 General. 20 9.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Alternative Forms of Notice 20 ARTICLE 10. FORCE MAJEURE 20 10.1 Force Majeure 20 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 No Consequential Damages. 23 12.3 Insurance 23 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 ARTICLE 14. SEVERABILITY 25 14.1 Severability 25 ARTICLE 15. COMPARABILITY 25 15.1 Comparability 25 ARTICLE 16. CONFIDENTIALITY 26 16.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 302811
Appears in 1 contract
TESTING AND INSPECTION. 1629
4.1 6.1 Pre-Commercial Operation Date Testing and Modifications. 16Modifications 29
4.2 6.2 Post-Commercial Operation Date Testing and Modifications 29
6.3 Right to Observe Testing. 17 4.3 Testing 30 6.4 Right to InspectInspect 30 ARTICLE 7. 17 METERING 30 7.1 General 30 7.2 Check Meters 31 7.3 Standards 31 i SERVICE AGREEMENT NO. 2629 7.4 Testing of Metering Equipment 31 7.5 Metering Data 31 ARTICLE 58. COMMUNICATIONS 17 5.1 32 8.1 Developer Obligations. 17 5.2 Obligations 32 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 Unit 32 8.3 No AnnexationAnnexation 32 ARTICLE 9. 18 OPERATIONS 32 9.1 General 32 9.2 NYISO and Connecting Transmission Owner Obligations 33 9.3 Developer Obligations 33 9.4 Start-Up and Synchronization 33
9.5 Real and Reactive Power Control and Primary Frequency Response 33 9.6 Outages and Interruptions 37 9.7 Switching and Tagging Rules 41 9.8 Use of Attachment Facilities by Third Parties 41 9.9 Disturbance Analysis Data Exchange 41 9.10 Reserved 42 ARTICLE 610. MAINTENANCE 42 10.1 Connecting Transmission Owner Obligations 42 10.2 Developer Obligations 42 10.3 Coordination 42 10.4 Secondary Systems 42 10.5 Operating and Maintenance Expenses 42 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 43 11.1 Developer’s Attachment Facilities 43 11.2 Connecting Transmission Owner’s Attachment Facilities 43
11.3 System Upgrade Facilities and System Deliverability Upgrades 43
11.4 Special Provisions for Affected Systems 43 11.5 Provision and Application of Security 18 6.3 43 11.6 Developer Compensation for Emergency Services 44 11.7 Line Outage Costs 18 44 ARTICLE 712. INVOICE 18 7.1 General44 12.1 General 44 12.2 Final Invoice 44 12.3 Payment 45 12.4 Disputes 45 ARTICLE 13. 18 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. 19 EMERGENCIES 45 13.1 Obligations 45 13.2 Notice 45 13.3 Immediate Action 46 13.4 NYISO and Connecting Transmission Owner Authority 46 13.5 Developer Authority 47 13.6 Limited Liability 47 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 47 14.1 Regulatory RequirementsRequirements 47 14.2 Governing Law 47 ii SERVICE AGREEMENT NO. 19 8.2 Governing Law. 20 ARTICLE 9. NOTICES 20 9.1 General. 20 9.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Alternative Forms of Notice 20 ARTICLE 10. FORCE MAJEURE 20 10.1 Force Majeure 20 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 No Consequential Damages. 23 12.3 Insurance 23 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 ARTICLE 14. SEVERABILITY 25 14.1 Severability 25 ARTICLE 15. COMPARABILITY 25 15.1 Comparability 25 ARTICLE 16. CONFIDENTIALITY 26 16.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 302629
Appears in 1 contract
TESTING AND INSPECTION. 16
4.1 Pre-Commercial Operation Date Testing and Modifications. 16
4.2 Right to Observe Testing. 17 4.3 Right to Inspect. 17 ARTICLE 5. COMMUNICATIONS 17 5.1 Developer Obligations. 17 5.2 Remote Terminal ▇▇▇▇ ▇▇ Unit 17 5.3 No Annexation. 18 ARTICLE 6. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 Provision and Application of Security 18 6.3 Line Outage Costs 18 ARTICLE 7. INVOICE 18 7.1 General. 18 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. 19 ARTICLE 8. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 Regulatory Requirements. 19 8.2 Governing Law. 20 ARTICLE 9. NOTICES 20 9.1 General. 20 9.2 ▇▇▇▇▇▇▇▇ Billings and Payments. 20 9.3 Alternative Forms of Notice 20 ARTICLE 10. FORCE MAJEURE 20 10.1 Force Majeure 20 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 No Consequential Damages. 23 12.3 Insurance 23 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 ARTICLE 14. SEVERABILITY 25 14.1 Severability 25 ARTICLE 15. COMPARABILITY 25 15.1 Comparability 25 ARTICLE 16. CONFIDENTIALITY 26 16.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO ▇▇▇▇▇ and Developer 30 18.4 Information Supplementation. 30
Appears in 1 contract
Sources: Engineering, Procurement, and Construction Agreement
TESTING AND INSPECTION. 16
4.1 Pre-Commercial Operation Date Testing and Modifications. Modifications 16
4.2 Right to Observe Testing. 17 4.3 Right to Inspect. 17 ARTICLE 5. COMMUNICATIONS 17 5.1 Developer Obligations. Obligations 17 5.2 Remote Terminal ▇▇▇▇ ▇▇ Unit. 17 5.3 No Annexation. 18 ARTICLE 6. PERFORMANCE OBLIGATION 18 6.1 EPC Services. Services 18 6.2 Provision and Application of Security 18 6.3 Line Outage Costs 18 ARTICLE 7. INVOICE 18 7.1 General. General 18 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. Disputes 19 ARTICLE 8. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 Regulatory Requirements. Requirements 19 8.2 Governing Law. Law 20 ARTICLE 9. NOTICES 20 9.1 General. General 20 9.2 ▇▇▇▇▇▇▇▇ Billings and Payments. Payments 20 9.3 Alternative Forms of Notice 20 ARTICLE 10. FORCE MAJEURE 20 10.1 Force Majeure Majeure. 20 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 No Consequential Damages. Damages 23 12.3 Insurance Insurance. 23 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 ARTICLE 14. SEVERABILITY 25 14.1 Severability 25 ARTICLE 15. COMPARABILITY 25 26 15.1 Comparability 25 26 ARTICLE 16. CONFIDENTIALITY 26 16.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. Owner 29 18.3 Updated Information Submission by NYISO ▇▇▇▇▇ and Developer 30 18.4 Information Supplementation. 30
Appears in 1 contract
Sources: Engineering, Procurement, and Construction Agreement
TESTING AND INSPECTION. 1623
4.1 6.1 Pre-Commercial Operation In-Service Date Testing and Modifications. 16Modifications 23
4.2 6.2 Post-In-Service Date Testing and Modifications 23
6.3 Right to Observe Testing. 17 4.3 Testing 24 6.4 Right to InspectInspect 24 ARTICLE 7. 17 METERING 24 7.1 General 24 7.2 Check Meters 24 7.3 Standards 25 7.4 Testing of Metering Equipment 25 7.5 Metering Data 25 ARTICLE 58. COMMUNICATIONS 17 5.1 25 8.1 Transmission Developer ObligationsObligations 25 i SERVICE AGREEMENT NO. 17 5.2 2605 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 8.3 No AnnexationAnnexation 26 ARTICLE 9. 18 OPERATIONS 26 9.1 General 26 9.2 NYISO and Connecting Transmission Owner Obligations 26 9.3 Transmission Developer Obligations 27
9.4 Outages and Interruptions 27
9.5 Switching and Tagging Rules 30 9.6 Disturbance Analysis Data Exchange 30 ARTICLE 610. MAINTENANCE 30 10.1 Connecting Transmission Owner Obligations 30 10.2 Transmission Developer Obligations 30 10.3 Coordination 30 10.4 Secondary Systems 31 10.5 Operating and Maintenance Expenses 31 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 31 11.1 Transmission Project 31 11.2 Network Upgrade Facilities 31 11.3 Special Provisions for Affected Systems 31 11.4 Provision and Application of Security 18 6.3 32 11.5 Forfeiture of Security 32 11.6 Network Upgrade Facility Costs 33 11.7 Line Outage Costs 18 33 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 33 12.1 General 33 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment34 12.3 Payment 34 12.4 Disputes 34 ARTICLE 13. 19 7.4 DisputesEMERGENCIES 34 13.1 Obligations 34 13.2 Notice 35 13.3 Immediate Action 35 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 19 35 13.5 Limited Liability 35 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 35 14.1 Regulatory Requirements. 19 8.2 Requirements 35 14.2 Governing Law. 20 Law 36 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 36 15.1 General 36 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 36 15.3 Alternative Forms of Notice 20 36 15.4 Operations and Maintenance Notice 36 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 36 ARTICLE 1117. DEFAULT 21 11.1 Default 21 37 17.1 General 37 ii SERVICE AGREEMENT NO. 2605
17.2 Right to Terminate 37 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 37 18.1 Indemnity 21 12.2 37 18.2 No Consequential Damages. 23 12.3 Damages 39 18.3 Insurance 23 39 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 41 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 42 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 42 ARTICLE 1622. CONFIDENTIALITY 26 16.1 42 22.1 Confidentiality 26 ARTICLE 1742 22.2 Term 42 22.3 Confidential Information 43 22.4 Scope 43 22.5 Release of Confidential Information 43 22.6 Rights 43 22.7 No Warranties 44 22.8 Standard of Care 44 22.9 Order of Disclosure 44 22.10 Termination of Agreement 44 22.11 Remedies 44 22.12 Disclosure to FERC, its Staff, or a State 45 22.13 Required Notices Upon Requests or Demands for Confidential Information . ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 3045
Appears in 1 contract
Sources: Interconnection Agreement
TESTING AND INSPECTION. 1629
4.1 6.1 Pre-Commercial Operation Date Testing and Modifications. 16Modifications 29
4.2 6.2 Post-Commercial Operation Date Testing and Modifications 30
6.3 Right to Observe Testing. 17 4.3 Testing 30 6.4 Right to InspectInspect 30 ARTICLE 7. 17 METERING 30
7.1 General 30 i SERVICE AGREEMENT NO. 2214
7.2 Check Meters 31 7.3 Standards 31 7.4 Testing of Metering Equipment 31 7.5 Metering Data 32 ARTICLE 58. COMMUNICATIONS 17 5.1 32 8.1 Developer Obligations. 17 5.2 Obligations 32 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 Unit 32 8.3 No AnnexationAnnexation 32 ARTICLE 9. 18 OPERATIONS 33 9.1 General 33 9.2 NYISO and Connecting Transmission Owner Obligations 33 9.3 Developer Obligations 33 9.4 Start-Up and Synchronization 33 9.5 Real and Reactive Power Control 33 9.6 Outages and Interruptions 35 9.7 Switching and Tagging Rules 38 9.8 Use of Attachment Facilities by Third Parties 38 9.9 Disturbance Analysis Data Exchange 39 ARTICLE 610. MAINTENANCE 39 10.1 Connecting Transmission Owner Obligations 39 10.2 Developer Obligations 39 10.3 Coordination 39 10.4 Secondary Systems 39 10.5 Operating and Maintenance Expenses 40 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 40 11.1 Developer Attachment Facilities 40 11.2 Connecting Transmission Owner’s Attachment Facilities 40
11.3 System Upgrade Facilities and System Deliverability Upgrades 40
11.4 Special Provisions for Affected Systems 40 11.5 Provision and Application of Security 18 6.3 40 11.6 Developer Compensation for Emergency Services 41 11.7 Line Outage Costs 18 41 ARTICLE 712. INVOICE 18 7.1 General41 12.1 General 41 12.2 Final Invoice 42 12.3 Payment 42 12.4 Disputes 42 ARTICLE 13. 18 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. 19 EMERGENCIES 42 13.1 Obligations 42 13.2 Notice 43 13.3 Immediate Action 43 13.4 NYISO and Connecting Transmission Owner Authority 43 13.5 Developer Authority 44 13.6 Limited Liability 44 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 44 14.1 Regulatory RequirementsRequirements 44 ii SERVICE AGREEMENT NO. 19 8.2 2214
14.2 Governing Law. 20 Law 45 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 ▇▇▇▇▇▇▇▇ 45 15.1 General 45 15.2 Billings and Payments. 20 9.3 Payments 45 15.3 Alternative Forms of Notice 20 45 15.4 Operations and Maintenance Notice 45 ARTICLE 1016. FORCE MAJEURE 20 10.1 46 16.1 Force Majeure 20 46 ARTICLE 1117. DEFAULT 21 11.1 46 17.1 Default 21 46 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 47 18.1 Indemnity 21 12.2 47 18.2 No Consequential Damages. 23 12.3 Damages 48 18.3 Insurance 23 48 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 50 19.1 Assignment 50 ARTICLE 1420. SEVERABILITY 25 14.1 51 20.1 Severability 25 51 ARTICLE 1521. COMPARABILITY 25 15.1 51 21.1 Comparability 25 51 ARTICLE 1622. CONFIDENTIALITY 26 16.1 51 22.1 Confidentiality 26 51 ARTICLE 1723. ENVIRONMENTAL RELEASES 29 17.1 54 23.1 Developer and Affected Connecting Transmission Owner Notice 29 54 ARTICLE 1824. INFORMATION REQUIREMENT 29 18.1 55 24.1 Information Acquisition. 29 18.2 Acquisition 55 24.2 Information Submission by Affected Connecting Transmission Owner. 29 18.3 Owner 55 24.3 Updated Information Submission by NYISO Developer 55 24.4 Information Supplementation 56 ARTICLE 25. INFORMATION ACCESS AND AUDIT RIGHTS 56 25.1 Information Access 56 25.2 Reporting of Non-Force Majeure Events 57 25.3 Audit Rights 57 25.4 Audit Rights Periods 57 25.5 Audit Results 58 ARTICLE 26. SUBCONTRACTORS 58 26.1 General 58 26.2 Responsibility of Principal 58 26.3 No Limitation by Insurance 58 ARTICLE 27. DISPUTES 58 27.1 Submission 58 27.2 External Arbitration Procedures 59 27.3 Arbitration Decisions 59 27.4 Costs 59 27.5 Termination 59 ARTICLE 28. REPRESENTATIONS, WARRANTIES AND COVENANTS 59 SERVICE AGREEMENT NO. 2214 28.1 General 59 ARTICLE 29. MISCELLANEOUS 60 29.1 Binding Effect 60 29.2 Conflicts 60 29.3 Rules of Interpretation 61 29.4 Compliance 61 29.5 Joint and Developer 30 18.4 Information SupplementationSeveral Obligations 61 29.6 Entire Agreement 61 29.7 No Third Party Beneficiaries 62 29.8 Waiver 62 29.9 Headings 62 29.10 Multiple Counterparts 62 29.11 Amendment 62 29.12 Modification by the Parties 62 29.13 Reservation of Rights 63 29.14 No Partnership 63 29.15 Other Transmission Rights 63 Appendices SERVICE AGREEMENT NO. 302214 STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT THIS STANDARD LARGE GENERATOR INTERCONNECTION AGREEMENT (“Agreement”) is made and entered into this 28th day of May 2015, by and among CPV Valley, LLC, a limited liability company organized and existing under the laws of the State of Delaware (“Developer” with a Large Generating Facility), the New York Independent System Operator, Inc., a not-for-profit corporation organized and existing under the laws of the State of New York (“NYISO”), and the New York Power Authority, a corporate municipal instrumentality organized and existing under the laws of the State of New York (“Connecting Transmission Owner”). Developer, the NYISO, or Connecting Transmission Owner each may be referred to as a “Party” or collectively referred to as the “Parties.” RECITALS
Appears in 1 contract
Sources: Service Agreement
TESTING AND INSPECTION. 16
4.1 Pre-Commercial Operation Date Testing and Modifications. 16
4.2 Right to Observe Testing. 17 4.3 Right to Inspect. 17 ARTICLE 5. COMMUNICATIONS 17 5.1 Developer Obligations. 17 5.2 Remote Terminal ▇▇▇▇ ▇▇ Unit 17 5.3 No Annexation. 18 ARTICLE 6. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 Provision and Application of Security 18 6.3 Line Outage Costs 18 ARTICLE 7. INVOICE 18 7.1 General. 18 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. 19 ARTICLE 8. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 Regulatory Requirements. 19 8.2 Governing Law. 20 ARTICLE 9. NOTICES 20 9.1 General. 20 9.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Alternative Forms of Notice 20 ARTICLE 10. FORCE MAJEURE 20 10.1 Force Majeure 20 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 No Consequential Damages. 23 12.3 Insurance 23 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 ARTICLE 14. SEVERABILITY 25 14.1 Severability 25 ARTICLE 15. COMPARABILITY 25 15.1 Comparability 25 ARTICLE 16. CONFIDENTIALITY 26 16.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 30
Appears in 1 contract
Sources: Engineering, Procurement, and Construction Agreement
TESTING AND INSPECTION. 1623
4.1 6.1 Pre-Commercial Operation In-Service Date Testing and Modifications. 16Modifications 23
4.2 6.2 Post-In-Service Date Testing and Modifications 23
6.3 Right to Observe Testing. 17 4.3 Testing 24 6.4 Right to InspectInspect 24 ARTICLE 7. 17 ARTICLE 5. COMMUNICATIONS 17 5.1 METERING 24 7.1 General 24 7.2 Check Meters 24 7.3 Standards 25 7.4 Testing of Metering Equipment 25 7.5 Metering Data 25 8.1 Transmission Developer Obligations. 17 5.2 Obligations 25 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 Unit 26 8.3 No AnnexationAnnexation 26 ARTICLE 9. 18 OPERATIONS 26 9.1 General 26 9.2 NYISO and Connecting Transmission Owner Obligations 26 9.3 Transmission Developer Obligations 27
9.4 Outages and Interruptions 27
9.5 Switching and Tagging Rules 30 9.6 Disturbance Analysis Data Exchange 30 ARTICLE 610. MAINTENANCE 30 10.1 Connecting Transmission Owner Obligations 30 10.2 Transmission Developer Obligations 30 10.3 Coordination 30 10.4 Secondary Systems 31 10.5 Operating and Maintenance Expenses 31 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 31 11.1 Transmission Project 31 11.2 Network Upgrade Facilities 31 11.3 Special Provisions for Affected Systems 31 11.4 Provision and Application of Security 18 6.3 32 11.5 Forfeiture of Security 32 11.6 Network Upgrade Facility Costs 33 11.7 Line Outage Costs 18 33 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 33 12.1 General 33 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment34 12.3 Payment 34 12.4 Disputes 34 ARTICLE 13. 19 7.4 DisputesEMERGENCIES 35 13.1 Obligations 35 13.2 Notice 35 13.3 Immediate Action 35 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 19 35 13.5 Limited Liability 35 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 36 14.1 Regulatory Requirements. 19 8.2 Requirements 36 14.2 Governing Law. 20 Law 36 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 36 15.1 General 36 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 36 15.3 Alternative Forms of Notice 20 37 15.4 Operations and Maintenance Notice 37 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 37 17.1 General 37 17.2 Right to Terminate 37 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 38 18.1 Indemnity 21 12.2 38 18.2 No Consequential Damages. 23 12.3 Damages 39 18.3 Insurance 23 39 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 42 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 42 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 42 ARTICLE 1622. CONFIDENTIALITY 26 16.1 43 22.1 Confidentiality 26 43 22.2 Term 43 22.3 Confidential Information 43 22.4 Scope 43 22.5 Release of Confidential Information 44 22.6 Rights 44 22.7 No Warranties 44 22.8 Standard of Care 44 22.9 Order of Disclosure 44 22.10 Termination of Agreement 45 22.11 Remedies 45 22.12 Disclosure to FERC, its Staff, or a State 45 22.13 Required Notices Upon Requests or Demands for Confidential Information . 46 ARTICLE 1723. TRANSMISSION DEVELOPER AND CONNECTING TRANSMISSION OWNER NOTICES OF ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 3046
Appears in 1 contract
TESTING AND INSPECTION. 1623
4.1 6.1 Pre-Commercial Operation In-Service Date Testing and Modifications. 16Modifications 23
4.2 6.2 Post-In-Service Date Testing and Modifications 23
6.3 Right to Observe Testing. 17 4.3 Testing 24 6.4 Right to InspectInspect 24 ARTICLE 7. 17 ARTICLE 5. COMMUNICATIONS 17 5.1 METERING 24 7.1 General 24 7.2 Check Meters 24 7.3 Standards 25 7.4 Testing of Metering Equipment 25 7.5 Metering Data 25 8.1 Transmission Developer Obligations. 17 5.2 Obligations 25 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 8.3 No AnnexationAnnexation 26 ARTICLE 9. 18 OPERATIONS 26 9.1 General 26 9.2 NYISO and Connecting Transmission Owner Obligations 26 9.3 Transmission Developer Obligations 27
9.4 Outages and Interruptions 27
9.5 Switching and Tagging Rules 30 9.6 Disturbance Analysis Data Exchange 30 ARTICLE 610. MAINTENANCE 30 10.1 Connecting Transmission Owner Obligations 30 10.2 Transmission Developer Obligations 30 10.3 Coordination 30 10.4 Secondary Systems 31 10.5 Operating and Maintenance Expenses 31 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 31 11.1 Transmission Project 31 11.2 Network Upgrade Facilities 31 11.3 Special Provisions for Affected Systems 31 11.4 Provision and Application of Security 18 6.3 32 11.5 Forfeiture of Security 32 11.6 Network Upgrade Facility Costs 33 11.7 Line Outage Costs 18 33 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 33 12.1 General 33 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment34 12.3 Payment 34 12.4 Disputes 34 ARTICLE 13. 19 7.4 DisputesEMERGENCIES 34 13.1 Obligations 34 13.2 Notice 35 13.3 Immediate Action 35 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 19 35 13.5 Limited Liability 35 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 35 14.1 Regulatory Requirements. 19 8.2 Requirements 35 14.2 Governing Law. 20 Law 36 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 36 15.1 General 36 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 36 15.3 Alternative Forms of Notice 20 36 15.4 Operations and Maintenance Notice 36 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 No Consequential Damages. 23 12.3 Insurance 23 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 ARTICLE 14. SEVERABILITY 25 14.1 Severability 25 ARTICLE 15. COMPARABILITY 25 15.1 Comparability 25 ARTICLE 16. CONFIDENTIALITY 26 16.1 Confidentiality 26 36 ARTICLE 17. ENVIRONMENTAL RELEASES 29 DEFAULT 37 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 30General 37
Appears in 1 contract
TESTING AND INSPECTION. 16
4.1 Pre-Commercial Operation Date Testing and Modifications. 16
4.2 Right to Observe Testing. 17 4.3 Right to Inspect. 17 ARTICLE 5. COMMUNICATIONS 17 5.1 Developer Obligations. 17 5.2 Remote Terminal ▇▇▇▇ ▇▇ Unit. 17 5.3 No Annexation. 18 ARTICLE 6. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 Provision and Application of Security Security. 18 6.3 Line Outage Costs Costs. 18 ARTICLE 7. INVOICE 18 7.1 General. 18 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. 19 ARTICLE 8. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 Regulatory Requirements. 19 8.2 Governing Law. 20 ARTICLE 9. NOTICES 20 9.1 General. 20 9.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Alternative Forms of Notice Notice. 20 ARTICLE 10. FORCE MAJEURE 20 10.1 Force Majeure Majeure. 20 ARTICLE 11. DEFAULT 21 11.1 Default Default. 21 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity Indemnity. 21 12.2 No Consequential Damages. 23 12.3 Insurance Insurance. 23 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 ARTICLE 14. SEVERABILITY 25 14.1 Severability Severability. 25 ARTICLE 15. COMPARABILITY 25 26 15.1 Comparability 25 Comparability. 26 ARTICLE 16. CONFIDENTIALITY 26 16.1 Confidentiality Confidentiality. 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice Notice. 29 ARTICLE 18. INFORMATION REQUIREMENT 29 18.1 Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 30 18.3 Updated Information Submission by NYISO and Developer Developer. 30 18.4 Information Supplementation. 3030 ARTICLE 19. INFORMATION ACCESS AND AUDIT RIGHTS 31 19.1 Information Access. 31 19.2 Reporting of Non-Force Majeure Events. 31 19.3 Audit Rights. 31 19.4 Audit Rights Periods. 31 19.5 Audit Results. 32 ARTICLE 20. SUBCONTRACTORS 32 20.1 General. 32 20.2 Responsibility of Principal. 32 20.3 No Limitation by Insurance. 32 ARTICLE 21. DISPUTES 32 21.1 Submission. 32 21.2 External Arbitration Procedures. 33 21.3 Arbitration Decisions. 33 21.4 Costs. 33 21.5 Termination. 34 ARTICLE 22. REPRESENTATIONS, WARRANTIES AND COVENANTS 34 22.1 General. 34 ARTICLE 23. MISCELLANEOUS 35 23.1 Binding Effect. 35 23.2 Conflicts. 35 23.3 Rules of Interpretation. 35 23.4 Compliance. 35 23.5 Joint and Several Obligations. 36 23.6 Entire Agreement. 36 23.7 No Third Party Beneficiaries. 36 23.8 Waiver. 36 23.9 Headings. 36 23.10 Multiple Counterparts. 36 23.11 Amendment. 36 23.12 Modification by the Parties. 37 23.13 Reservation of Rights. 37 23.14 No Partnership. 37 23.15 Other Transmission Rights. 37 APPENDICES Appendix A - EPC Services Appendix B - Addresses for Delivery of Notices and ▇▇▇▇▇▇▇▇ THIS ENGINEERING, PROCUREMENT, AND CONSTRUCTION AGREEMENT (“Agreement”) is made and entered into this 9th day of June 2015, by and among CPV Valley, LLC, a limited liability company organized and existing under the laws of the State of Delaware (“Developer”), the New York Independent System Operator, Inc., a not-for-profit corporation organized and existing under the laws of the State of New York (“NYISO”), and New York State Electric & Gas Corporation, a corporation organized and existing under the laws of the State of New York (“Affected Transmission Owner”). Developer, the NYISO, or Affected Transmission Owner each may be referred to as a “Party” or collectively referred to as the “Parties.”
Appears in 1 contract
Sources: Engineering, Procurement, and Construction Agreement
TESTING AND INSPECTION. 1623
4.1 6.1 Pre-Commercial Operation In-Service Date Testing and Modifications. 16Modifications 23
4.2 6.2 Post-In-Service Date Testing and Modifications 23
6.3 Right to Observe Testing. 17 4.3 Testing 24 6.4 Right to InspectInspect 24 ARTICLE 7. 17 METERING 24 7.1 General 24 7.2 Check Meters 24 7.3 Standards 25 7.4 Testing of Metering Equipment 25 7.5 Metering Data. 25 ARTICLE 58. COMMUNICATIONS 17 5.1 25 8.1 Transmission Developer Obligations. 17 5.2 Obligations 25 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 8.3 No Annexation. 18 26 ARTICLE 69. OPERATIONS 26 9.1 General 26 9.2 NYISO and Connecting Transmission Owner Obligations 26 9.3 Transmission Developer Obligations 27
9.4 Outages and Interruptions 27
9.5 Switching and Tagging Rules 30 9.6 Disturbance Analysis Data Exchange 30 ARTICLE 10. MAINTENANCE 30 10.1 Connecting Transmission Owner Obligations 30 10.2 Transmission Developer Obligations 30 10.3 Coordination. 30 10.4 Secondary Systems 31 10.5 Operating and Maintenance Expenses 31 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 31 11.1 Transmission Project 31 11.2 Network Upgrade Facilities 31 11.3 Special Provisions for Affected Systems 31 11.4 Provision and Application of Security 18 6.3 32 11.5 Forfeiture of Security 32 11.6 Network Upgrade Facility Costs 33 11.7 Line Outage Costs 18 33 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 33 12.1 General 33 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment. 19 7.4 34 12.3 Payment 34 12.4 Disputes. 19 34 ARTICLE 813. EMERGENCIES 34 13.1 Obligations 34 13.2 Notice. 35 13.3 Immediate Action 35 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 35 13.5 Limited Liability 35 ARTICLE 14. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 35 14.1 Regulatory Requirements. 19 8.2 Requirements 35 14.2 Governing Law. 20 Law 36 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 36 15.1 General 36 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 36 15.3 Alternative Forms of Notice 20 Notice. 36 15.4 Operations and Maintenance Notice. 36 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 36 ARTICLE 1117. DEFAULT 21 11.1 Default 21 37 17.1 General 37 17.2 Right to Terminate 37 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 37 18.1 Indemnity. 37 18.2 No Consequential Damages. 23 12.3 Damages 39 18.3 Insurance 23 39 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 41 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 42 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 42 ARTICLE 1622. CONFIDENTIALITY 26 16.1 42 22.1 Confidentiality 26 42 22.2 Term. 42 22.3 Confidential Information 43 22.4 Scope. 43 22.5 Release of Confidential Information 43 22.6 Rights 43 22.7 No Warranties 44 22.8 Standard of Care. 44 22.9 Order of Disclosure 44 22.10 Termination of Agreement 44 22.11 Remedies 44 22.12 Disclosure to FERC, its Staff, or a State 45 22.13 Required Notices Upon Requests or Demands for Confidential Information 45 ARTICLE 1723. TRANSMISSION DEVELOPER AND CONNECTING TRANSMISSION OWNER NOTICES OF ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 45 ARTICLE 1824. INFORMATION REQUIREMENT 29 18.1 46 24.1 Information Acquisition. 29 18.2 Acquisition 46 24.2 Information Submission by Affected Transmission Owner. 29 18.3 Concerning the Network Upgrade Facilities 46 24.3 Updated Information Submission Concerning the Transmission Project 46 24.4 Information Supplementation 47 ARTICLE 25. INFORMATION ACCESS AND AUDIT RIGHTS 47 25.1 Information Access 47 25.2 Reporting of Non-Force Majeure Events 47 25.3 Audit Rights 48 25.4 Audit Rights Periods 48 25.5 Audit Results 48 ARTICLE 26. SUBCONTRACTORS 49 26.1 General 49 26.2 Responsibility of Principal 49 26.3 No Limitation by NYISO Insurance 49 ARTICLE 27. DISPUTES 49 27.1 Submission 49 27.2 External Arbitration Procedures 49 27.3 Arbitration Decisions 50 27.4 Costs. 50 27.5 Termination 50 ARTICLE 28. REPRESENTATIONS, WARRANTIES AND COVENANTS 50 28.1 General 50 ARTICLE 29. MISCELLANEOUS 51 29.1 Binding Effect 51 29.2 Conflicts 51 29.3 Rules of Interpretation 51 29.4 Compliance 52 29.5 Joint and Developer 30 18.4 Information SupplementationSeveral Obligations 52 29.6 Entire Agreement 52 29.7 No Third Party Beneficiaries 52 29.8 Waiver 53 29.9 Headings 53 29.10 Multiple Counterparts 53 29.11 Amendment 53 29.12 Modification by the Parties 53 29.13 Reservation of Rights 53 29.14 No Partnership 54 29.15 Other Transmission Rights 54 Appendices is made and entered into this 19th day of February, 2021, by and among New York Transco, LLC, a limited liability company organized and existing under the laws of the State of New York (“Transmission Developer” with a Transmission Project), the New York Independent System Operator, Inc., a not-for-profit corporation organized and existing under the laws of the State of New York (“NYISO”), and Niagara Mohawk Power Corporation d/b/a National Grid a corporation organized and existing under the laws of the State of New York (“Connecting Transmission Owner”). 30Transmission Developer, the NYISO, or Connecting Transmission Owner each may be referred to as a “Party” or collectively referred to as the “Parties.”
Appears in 1 contract
TESTING AND INSPECTION. 16
4.1 22 6.1 Pre-Commercial Operation Date Testing and Modifications. 1622
4.2 6.2 Post-Commercial Operation Date Testing and Modifications. 22
6.3 Right to Observe Testing. 17 4.3 23 6.4 Right to Inspect. 17 23 ARTICLE 57. METERING 23 7.1 General. 23 ARTICLE 8. COMMUNICATIONS 17 5.1 23 8.1 Reserved 23 8.2 Reserved 23 8.3 No Annexation 24 ARTICLE 9. OPERATIONS 24 9.1 General. 24 9.2 Connecting Transmission Owner Obligations. 24 9.3 Developer Obligations. 17 5.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 No Annexation24 9.4 Start-Up and Synchronization 24 9.5 Reserved 24 9.6 Outages and Interruptions 24 9.7 Switching and Tagging Rules. 18 28 9.8 Reserved 28 9.9 Disturbance Analysis Data Exchange 28 ARTICLE 610. MAINTENANCE 28 10.1 Connecting Transmission Owner Obligations. 28 10.2 Developer Obligations. 28 10.3 Coordination 28 10.4 Secondary Systems. 29 10.5 Operating and Maintenance Expenses 29 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services29 11.1 Reserved 29 11.2 Reserved 29 11.3 System Upgrade Facilities 29 11.4 Reserved 29 11.5 Provision of Security. 18 6.2 Provision and Application of Security 18 6.3 29 11.6 Developer Compensation for Emergency Services 30 11.7 Line Outage Costs 18 Costs. 30 ARTICLE 712. INVOICE 18 7.1 30 12.1 General. 18 7.2 Refund of Remaining Security 19 7.3 30 12.2 Final Invoice 30 12.3 Payment. 19 7.4 30 12.4 Disputes. 19 30 ARTICLE 813. EMERGENCIES 31 13.1 Obligations. 31 13.2 Notice 31 13.3 Immediate Action. 31 13.4 NYISO and Connecting Transmission Owner Authority. 31 13.5 Developer Authority. 32 13.6 Limited Liability. 32 ARTICLE 14. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 33 14.1 Regulatory Requirements. 19 8.2 33 14.2 Governing Law. 20 Law 33 ARTICLE 915. NOTICES 20 9.1 33 15.1 General. 20 9.2 33 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 34 15.3 Alternative Forms of Notice 20 34 15.4 Operations and Maintenance Notice 34 ARTICLE 1016. FORCE MAJEURE 20 10.1 34 16.1 Force Majeure 20 34 ARTICLE 1117. DEFAULT 21 11.1 Default 21 35 17.1 Default. 35 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 35 18.1 Indemnity. 35 18.2 No Consequential Damages. 23 12.3 37 18.3 Insurance 23 37 ARTICLE 1319. ASSIGNMENT 25 13.1 40 19.1 Assignment. 25 40 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 41 20.1 Severability. 41 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 41 21.1 Comparability. 41 ARTICLE 1622. CONFIDENTIALITY 26 16.1 Confidentiality 26 41 22.1 Confidentiality. 41 ARTICLE 1723. ENVIRONMENTAL RELEASES 29 17.1 45 23.1 Developer and Affected Connecting Transmission Owner Notice 29 45 ARTICLE 1824. INFORMATION REQUIREMENT 29 18.1 45 24.1 Information Acquisition. 29 18.2 45 24.2 Information Submission by Affected Connecting Transmission Owner. 29 18.3 Owner 45 24.3 Updated Information Submission by NYISO Developer 45 24.4 Information Supplementation 46 ARTICLE 25. INFORMATION ACCESS AND AUDIT RIGHTS 46 25.1 Information Access. 46 25.2 Reporting of Non-Force Majeure Events. 47 25.3 Audit Rights. 47 25.4 Audit Rights Periods. 47 25.5 Audit Results. 47 ARTICLE 26. SUBCONTRACTORS 48 26.1 General. 48 26.2 Responsibility of Principal. 48 26.3 No Limitation by Insurance 48 ARTICLE 27. DISPUTES 48 27.1 Submission 48 27.2 External Arbitration Procedures. 49 27.3 Arbitration Decisions. 49 27.4 Costs. 49 27.5 Termination 49 ARTICLE 28. REPRESENTATIONS, WARRANTIES AND COVENANTS 50 28.1 General. 50 ARTICLE 29. MISCELLANEOUS 50 29.1 Binding Effect. 50 29.2 Conflicts. 51 29.3 Rules of Interpretation 51 29.4 Compliance 51 29.5 Joint and Developer 30 18.4 Information SupplementationSeveral Obligations. 3051 29.6 Entire Agreement. 51 29.7 No Third Party Beneficiaries. 52 29.8 Waiver 52 29.9 Headings. 52 29.10 Multiple Counterparts. 52 29.11 Amendment. 52 29.12 Modification by the Parties. 52 29.13 Reservation of Rights. 52 29.14 No Partnership 53 29.15 Other Transmission Rights 53 Appendices 55
Appears in 1 contract
TESTING AND INSPECTION. 1621
4.1 6.1 Pre-Commercial Operation In Service Date Testing and Modifications. 16Modifications 21
4.2 6.2 Post-In-Service Date Testing and Modifications 22
6.3 Right to Observe Testing. 17 4.3 Testing 22 6.4 Right to InspectInspect 22 ARTICLE 7. 17 METERING 22 7.1 General 22 7.2 Check Meters 23 7.3 Standards 23 7.4 Testing of Metering Equipment 23 7.5 Metering Data. 23 ARTICLE 58. COMMUNICATIONS 17 5.1 23 8.1 Transmission Developer Obligations. 17 5.2 Obligations 23 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 Unit 24 8.3 No Annexation. 18 24 ARTICLE 69. OPERATIONS 24 9.1 General 24 9.2 NYISO and Connecting Transmission Owner Obligations 25 9.3 Transmission Developer Obligations 25 9.4 Reserved 25 9.5 Outages and Interruptions 25 9.6 Switching and Tagging Rules 28 9.7 Disturbance Analysis Data Exchange 28 ARTICLE 10. MAINTENANCE 28 10.1 Connecting Transmission Owner Obligations 28 10.2 Transmission Developer Obligations 28 10.3 Coordination. 29 10.4 Secondary Systems 29 10.5 Operating and Maintenance Expenses 29 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 29 11.1 Transmission Project 29 11.2 Network Upgrade Facilities 29 11.3 Special Provisions for Affected Systems 30 11.4 Provision and Application of Security 18 6.3 30 11.5 Forfeiture of Security 30 11.6 Network Upgrade Facility Costs 31 11.7 Line Outage Costs 18 31 ARTICLE 712. INVOICE 18 7.1 General. 18 7.2 32 12.1 General 32 12.2 Final Invoice and Refund of Remaining Security 19 7.3 Payment. 19 7.4 32 12.3 Payment 32 12.4 Disputes. 19 32 ARTICLE 813. EMERGENCIES 33 13.1 Obligations 33 13.2 Notice. 33 13.3 Immediate Action 33 13.4 NYISO, Transmission Developer, and Connecting Transmission Owner Authority. 33 13.5 Limited Liability 34 ARTICLE 14. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 34 14.1 Regulatory Requirements. 19 8.2 Requirements 34 14.2 Governing Law. 20 Law 34 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 34 15.1 General 34 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 35 15.3 Alternative Forms of Notice 20 Notice. 35 15.4 Operations and Maintenance Notice. 35 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 35 ARTICLE 1117. DEFAULT 21 11.1 Default 21 35 17.1 General 35 17.2 Right to Terminate 36 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 36 18.1 Indemnity. 36 18.2 No Consequential Damages. 23 12.3 Damages 37 18.3 Insurance 23 37 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 40 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 40 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 40 ARTICLE 1622. CONFIDENTIALITY 26 16.1 40 22.1 Confidentiality 26 ARTICLE 1740 22.2 Term. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 1841 22.3 Confidential Information 41 22.4 Scope. INFORMATION REQUIREMENT 29 18.1 41 22.5 Release of Confidential Information Acquisition41 22.6 Rights 42 22.7 No Warranties 42 22.8 Standard of Care. 29 18.2 42 22.9 Order of Disclosure 42 22.10 Termination of Agreement 42 22.11 Remedies 43 22.12 Disclosure to FERC, its Staff, or a State 43 22.13 Required Notices Upon Requests or Demands for Confidential Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 3043
Appears in 1 contract
TESTING AND INSPECTION. 16
4.1 Pre-Commercial Operation In-Service Date Testing and Modifications. Modifications 16
4.2 Right to Observe Testing. Testing 17 4.3 Right to Inspect. Inspect 17 ARTICLE 5. COMMUNICATIONS 17 5.1 Developer Obligations. Affected System Operator Obligations 17 5.2 Remote Terminal ▇▇▇▇ ▇▇ Unit 17 5.3 No Annexation. Annexation 18 ARTICLE 6. PERFORMANCE OBLIGATION 18 6.1 EPC Services. Services 18 6.2 Provision and Application of Security 18 6.3 Forfeiture of Security 18 6.4 Affected System Upgrade Facility Costs 19 6.5 Line Outage Costs 18 19 ARTICLE 7. INVOICE 18 19 7.1 General. 18 General 19 7.2 Refund of Remaining Security 19 20 7.3 Payment. 19 Payment 20 7.4 Disputes. 19 Disputes 20 ARTICLE 8. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 20 SERVICE AGREEMENT NO. 2635 8.1 Regulatory Requirements. 19 Requirements 20 8.2 Governing Law. Law 20 ARTICLE 9. NOTICES 20 21
9.1 General. 20 General 21 9.2 ▇▇▇▇▇▇▇▇ Billings and Payments. 20 Payments 21 9.3 Alternative Forms of Notice 20 21 ARTICLE 10. FORCE MAJEURE 20 10.1 Force Majeure 20 21 ARTICLE 11. DEFAULT 21 22 11.1 Default 21 General 22 11.2 Right to Terminate 22 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 22 12.1 Indemnity 21 22 12.2 No Consequential Damages. Damages 23 12.3 Insurance 23 24 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 26 ARTICLE 14. SEVERABILITY 25 14.1 Severability 25 27 ARTICLE 15. COMPARABILITY 25 15.1 Comparability 25 27 ARTICLE 16. CONFIDENTIALITY 26 27 16.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 27 16.2 Term 27 16.3 Confidential Information 27 16.4 Scope 27 16.5 Release of Confidential Information 28 16.6 Rights 28 16.7 No Warranties 28 16.8 Standard of Care 28 16.9 Order of Disclosure 29 17.1 Developer and Affected Transmission Owner Notice 16.10 Termination of Agreement 29 ARTICLE 18. INFORMATION REQUIREMENT 16.11 Remedies 29 18.1 16.12 Disclosure to FERC, its Staff, or a State 29 16.13 Required Notices Upon Requests or Demands for Confidential Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. ..30
Appears in 1 contract
Sources: Service Agreement
TESTING AND INSPECTION. 16
4.1 30 6.1 Pre-Commercial Operation Date Testing and Modifications. 16
4.2 30 6.2 Post-Commercial Operation Date Testing and Modifications. 30 6.3 Right to Observe Testing. 17 4.3 30 6.4 Right to InspectInspect 31 ARTICLE 7. 17 METERING 31 7.1 General. 31 7.2 Check Meters 31 7.3 Standards. 32 7.4 Testing of Metering Equipment. 32 7.5 Metering Data. 32 ARTICLE 58. COMMUNICATIONS 17 5.1 32 8.1 Developer Obligations. 17 5.2 Obligations 32 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 Unit. 33 8.3 No Annexation. 18 33 ARTICLE 69. OPERATIONS 33 9.1 General. 33 9.2 NYISO and Connecting Transmission Owner Obligations. 33 9.3 Developer Obligations 34 9.4 Start-Up and Synchronization. 34 9.5 Real and Reactive Power Control and Primary Frequency Response. 34 9.6 Outages and Interruptions. 38 9.7 Switching and Tagging Rules 41 9.8 Use of Attachment Facilities by Third Parties. 42 9.9 Disturbance Analysis Data Exchange. 42 9.10 Reserved 42 ARTICLE 10. MAINTENANCE 10.1 Connecting Transmission Owner Obligations 42 10.2 Developer Obligations 43 10.3 Coordination. 43 10.4 Secondary Systems. 43 10.5 Operating and Maintenance Expenses 43 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC 11.1 Developer’s Attachment Facilities 43 11.2 Connecting Transmission Owner’s Attachment Facilities 44 11.3 System Upgrade Facilities and System Deliverability Upgrades. 44 11.4 Special Provisions for Affected Systems. 44 11.5 Provision of Security. 44 11.6 Developer Compensation for Emergency Services. 18 6.2 Provision and Application of Security 18 6.3 45 11.7 Line Outage Costs 18 Costs. 45 ARTICLE 712. INVOICE 18 7.1 12.1 General. 18 7.2 Refund of Remaining Security 19 7.3 Payment45 12.2 Final Invoice. 19 7.4 Disputes45 12.3 Payment 46 12.4 Disputes 46 ARTICLE 13. 19 EMERGENCIES 13.1 Obligations 46 13.2 Notice. 46 13.3 Immediate Action. 47 13.4 NYISO and Connecting Transmission Owner Authority. 47 13.5 Developer Authority. 48 13.6 Limited Liability. 48 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 14.1 Regulatory Requirements. 19 8.2 48 14.2 Governing Law. 20 Law 48 ARTICLE 915. NOTICES 20 9.1 15.1 General. 20 9.2 49 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 49 15.3 Alternative Forms of Notice 20 Notice. 49 15.4 Operations and Maintenance Notice. 49 ARTICLE 1016. FORCE MAJEURE 20 10.1 Force Majeure 20 ARTICLE 1117. DEFAULT 21 11.1 Default 21 17.1 General. 50 17.2 Right to Terminate. 50 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 Indemnity 21 12.2 18.1 Indemnity. 50 18.2 No Consequential Damages. 23 12.3 Insurance 23 52 18.3 Insurance. 52 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 ARTICLE 1420. SEVERABILITY 25 14.1 Severability 25 ARTICLE 1521. COMPARABILITY 25 15.1 Comparability 25 ARTICLE 1622. CONFIDENTIALITY 26 16.1 Confidentiality 26 ARTICLE 1722.1 Confidentiality. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 1855 22.2 Term. INFORMATION REQUIREMENT 29 18.1 55 22.3 Confidential Information. 55 22.4 Scope. 56 22.5 Release of Confidential Information. 56 22.6 Rights. 56 22.7 No Warranties 56 22.8 Standard of Care. 57 22.9 Order of Disclosure. 57 22.10 Termination of Agreement. 57 22.11 Remedies. 57 22.12 Disclosure to FERC, its Staff, or a State. 58 22.13 Required Notices Upon Requests or Demands for Confidential Information Acquisition. 29 18.2 Information Submission by Affected Transmission Owner. 29 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 3058
Appears in 1 contract
Sources: Interconnection Agreement
TESTING AND INSPECTION. 16
4.1 Pre-Commercial Operation Date Testing and Modifications. Modifications 16
4.2 Right to Observe Testing. 17 4.3 Right to Inspect. 17 ARTICLE 5. COMMUNICATIONS 17 5.1 Developer Obligations. Obligations 17 5.2 Remote Terminal ▇▇▇▇ ▇▇ Unit. 17 5.3 No Annexation. 18 ARTICLE 6. PERFORMANCE OBLIGATION 18 6.1 EPC Services. Services 18 6.2 Provision and Application of Security 18 6.3 Line Outage Costs 18 ARTICLE 7. INVOICE 18 19 7.1 General. 18 General 19 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. Disputes 19 ARTICLE 8. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 20 8.1 Regulatory Requirements. 19 Requirements 20 8.2 Governing Law. Law 20 ARTICLE 9. NOTICES 20 20
9.1 General. General 20 9.2 ▇▇▇▇▇▇▇▇ and Payments. Payments 20 9.3 Alternative Forms of Notice 20 21 ARTICLE 10. FORCE MAJEURE 20 21 10.1 Force Majeure 20 Majeure. 21 ARTICLE 11. DEFAULT 21 11.1 Default 21 ARTICLE 12. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 22 12.1 Indemnity 21 22 12.2 No Consequential Damages. Damages 23 12.3 Insurance Insurance. 23 ARTICLE 13. ASSIGNMENT 25 13.1 Assignment. 25 ARTICLE 14. SEVERABILITY 25 26 14.1 Severability 25 26 ARTICLE 15. COMPARABILITY 25 26 15.1 Comparability 25 26 ARTICLE 16. CONFIDENTIALITY 26 16.1 Confidentiality 26 ARTICLE 17. ENVIRONMENTAL RELEASES 29 17.1 Developer and Affected Transmission Owner Notice 29 ARTICLE 18. INFORMATION REQUIREMENT 29 30 18.1 Information Acquisition. 29 30 18.2 Information Submission by Affected Transmission Owner. 29 Owner 30 18.3 Updated Information Submission by NYISO and Developer 30 18.4 Information Supplementation. 3031 ARTICLE 19. INFORMATION ACCESS AND AUDIT RIGHTS 31 19.1 Information Access 31 19.2 Reporting of Non-Force Majeure Events 31 19.3 Audit Rights 31 19.4 Audit Rights Periods 32 19.5 Audit Results 32 ARTICLE 20. SUBCONTRACTORS 32 20.1 General 32 20.2 Responsibility of Principal. 32 20.3 No Limitation by Insurance. 33 ARTICLE 21. DISPUTES 33 21.1 Submission. 33 21.2 External Arbitration Procedures 33 21.3 Arbitration Decisions 33 21.4 Costs. 34 21.5 Termination 34 ARTICLE 22. REPRESENTATIONS, WARRANTIES AND COVENANTS 34 22.1 General 34 ARTICLE 23. MISCELLANEOUS 35 23.1 Binding Effect 35 23.2 Conflicts 35 23.3 Rules of Interpretation. 35 23.4 Compliance. 36 23.5 Joint and Several Obligations 36 23.6 Entire Agreement. 36 23.7 No Third Party Beneficiaries 36 23.8 Waiver 36 23.9 Headings 36 23.10 Multiple Counterparts 37 23.11 Amendment 37 23.12 Modification by the Parties 37 23.13 Reservation of Rights 37 23.14 No Partnership. 37 23.15 Other Transmission Rights 37 Appendices (“Agreement”) is made and entered into this 3rd day of June 2015, by and among CPV Valley, LLC, a limited liability company organized and existing under the laws of the State of Delaware (“Developer”), the New York Independent System Operator, Inc., a not-for-profit corporation organized and existing under the laws of the State of New York (“NYISO”), and Central ▇▇▇▇▇▇ Gas & Electric Corporation, a corporation organized and existing under the laws of the State of New York (“Affected Transmission Owner”). Developer, the NYISO, or Affected Transmission Owner each may be referred to as a “Party” or collectively referred to as the “Parties.”
Appears in 1 contract
Sources: Engineering, Procurement, and Construction Agreement
TESTING AND INSPECTION. 1629
4.1 6.1 Pre-Commercial Operation Date Testing and Modifications. 16Modifications 29
4.2 6.2 Post-Commercial Operation Date Testing and Modifications 29
6.3 Right to Observe Testing. 17 4.3 Testing 29 6.4 Right to InspectInspect 29 ARTICLE 7. 17 METERING 30 7.1 General 30 7.2 Check Meters 30 7.3 Standards 30 7.4 Testing of Metering Equipment 30 7.5 Metering Data 31 ARTICLE 58. COMMUNICATIONS 17 5.1 31 8.1 Developer Obligations. 17 5.2 Obligations 31 8.2 Remote Terminal ▇▇▇▇ ▇▇ 5.3 8.3 No AnnexationAnnexation 32 ARTICLE 9. 18 OPERATIONS 32 9.1 General 32 9.2 NYISO and Connecting Transmission Owner Obligations 32 9.3 Developer Obligations 32 9.4 Start-Up and Synchronization 33 9.5 Real and Reactive Power Control 33 9.6 Outages and Interruptions 34 9.7 Switching and Tagging Rules 38 9.8 Use of Attachment Facilities by Third Parties 38 9.9 Disturbance Analysis Data Exchange 38 ARTICLE 610. MAINTENANCE 39 10.1 Connecting Transmission Owner Obligations 39 10.2 Developer Obligations 39 10.3 Coordination 39 10.4 Secondary Systems 39 10.5 Operating and Maintenance Expenses 39 ARTICLE 11. PERFORMANCE OBLIGATION 18 6.1 EPC Services. 18 6.2 40 11.1 Developer Attachment Facilities 40 11.2 Connecting Transmission Owner’s Attachment Facilities 40
11.3 System Upgrade Facilities and System Deliverability Upgrades 40
11.4 Special Provisions for Affected Systems 40 11.5 Provision and Application of Security 18 6.3 40 11.6 Developer Compensation for Emergency Services 41 11.7 Line Outage Costs 18 41 ARTICLE 712. INVOICE 18 7.1 General41 12.1 General 41 12.2 Final Invoice 41 12.3 Payment 42 12.4 Disputes 42 ARTICLE 13. 18 7.2 Refund of Remaining Security 19 7.3 Payment. 19 7.4 Disputes. 19 EMERGENCIES 42 13.1 Obligations 42 13.2 Notice 42 13.3 Immediate Action 43 13.4 NYISO and Connecting Transmission Owner Authority 43 13.5 Developer Authority 44 13.6 Limited Liability 44 ARTICLE 814. REGULATORY REQUIREMENTS AND GOVERNING LAW 19 8.1 44 14.1 Regulatory Requirements. 19 8.2 Requirements 44 14.2 Governing Law. 20 Law 45 ARTICLE 915. NOTICES 20 9.1 General. 20 9.2 45 15.1 General 45 15.2 ▇▇▇▇▇▇▇▇ and Payments. 20 9.3 Payments 45 15.3 Alternative Forms of Notice 20 45 15.4 Operations and Maintenance Notice 45 ARTICLE 1016. FORCE MAJEURE 20 10.1 45 16.1 Force Majeure 20 45 ARTICLE 1117. DEFAULT 21 11.1 46 17.1 Default 21 46 ARTICLE 1218. INDEMNITY, CONSEQUENTIAL DAMAGES AND INSURANCE 21 12.1 46 18.1 Indemnity 21 12.2 46 18.2 No Consequential Damages. 23 12.3 Damages 48 18.3 Insurance 23 48 ARTICLE 1319. ASSIGNMENT 25 13.1 Assignment. 25 50 19.1 Assignment 50 ARTICLE 1420. SEVERABILITY 25 14.1 50 20.1 Severability 25 50 ARTICLE 1521. COMPARABILITY 25 15.1 51 21.1 Comparability 25 51 ARTICLE 1622. CONFIDENTIALITY 26 16.1 51 22.1 Confidentiality 26 51 ARTICLE 1723. ENVIRONMENTAL RELEASES 29 17.1 54 23.1 Developer and Affected Connecting Transmission Owner Notice 29 54 ARTICLE 1824. INFORMATION REQUIREMENT 29 18.1 54 24.1 Information Acquisition. 29 18.2 Acquisition 54 24.2 [Information Submission by Affected Connecting Transmission Owner. 29 18.3 Owner 55 24.3 Updated Information Submission by NYISO Developer 55 24.4 Information Supplementation 55 ARTICLE 25. INFORMATION ACCESS AND AUDIT RIGHTS 56 25.1 Information Access 56 25.2 Reporting of Non-Force Majeure Events 56 25.3 Audit Rights 57 25.4 Audit Rights Periods 57 25.5 Audit Results 57 ARTICLE 26. SUBCONTRACTORS 57 26.1 General 57 26.2 Responsibility of Principal 58 26.3 No Limitation by Insurance 58 ARTICLE 27. DISPUTES 58 27.1 Submission 58 27.2 External Arbitration Procedures 58 27.3 Arbitration Decisions 59 27.4 Costs 59 27.5 Termination 59 ARTICLE 28. REPRESENTATIONS, WARRANTIES AND COVENANTS 59 28.1 General 59 ARTICLE 29. MISCELLANEOUS 60 29.1 Binding Effect 60 29.2 Conflicts 60 29.3 Rules of Interpretation 61 29.4 Compliance 61 29.5 Joint and Several Obligations 61 29.6 Entire Agreement 61 29.7 No Third Party Beneficiaries 62 29.8 Waiver 62 29.9 Headings 62 29.10 Multiple Counterparts 62 29.11 Amendment 62 29.12 Modification by the Parties 62 29.13 Reservation of Rights 63 29.14 No Partnership 63 29.15 Other Transmission Rights 63 Appendices LARGE GENERATOR INTERCONNECTION AGREEMENT THIS LARGE GENERATOR INTERCONNECTION AGREEMENT (“Agreement”) is made and entered into this 26th day of June 2017, by and between Selkirk Cogen Partners, LP, a limited partnership organized and existing under the laws of the State/Commonwealth of Delaware (“Developer” with a Large Generating Facility), and Niagara Mohawk Power Corporation d/b/a National Grid, a corporation organized and existing under the laws of the State of New York (“Connecting Transmission Owner”). Developer 30 18.4 Information Supplementation. 30or Connecting Transmission Owner each may be referred to as a “Party” or together referred to as the “Parties.” RECITALS
Appears in 1 contract
Sources: Lgia No. 2345