The Preliminary. Engineering Design Report and Engineer’s documentation and opinion of costs, along with the following documents and files, shall be delivered to the Owner within 30 days or as otherwise stated in the task order authorization. ▪ Five(5) copies of the report for review. ▪ Once the report has been finalized, submit two(2) copies of the revised report plus one(1) electronic file copy in PDF format, and one(1) electronic file copy of the updated Master and Task Order project schedules in Microsoft Project format. ▪ Two(2) copies of the drawings(11x17 minimum). ▪ Once the drawing review is complete, submit one copy of the revised drawings plus one(1) electronic file copy of each drawing in AutoCADD format(release 2000 or later) and in PDF format. ▪ All files will be titled so as to distinguish between conceptual, preliminary, and final design stages.
Appears in 1 contract
Sources: Multiphase Project Contract for Engineering Services
The Preliminary. Engineering Design Report and Engineer’s documentation and opinion of costs, along with the following documents and files, shall be delivered to the Owner within 30 days or as otherwise stated in the task order authorizationwritten authorization from Owner to Engineer to proceed with Preliminary Engineering. ▪ Five(5) copies of the report for review. ▪ Once the report has been finalized, submit two(2) copies of the revised report plus one(1) electronic file copy in PDF format, and one(1) electronic file copy of the updated Master and Task Order project schedules schedule in Microsoft Project format. ▪ Two(2) copies of the drawings(11x17 minimum). ▪ Once the drawing review is complete, submit one copy of the revised drawings plus one(1) electronic file copy of each drawing in AutoCADD format(release 2000 or later) and in PDF format. ▪ All files will be titled so as to distinguish between conceptual, preliminary, and final design stages.
Appears in 1 contract
Sources: Contract for Engineering Services