Total for Subcontract Costs. 6.3.1 6.3.1. If a MACC is mutually accepted following negotiations, the Total for Subcontract Costs will be included in this GC/CM Contract as part of the MACC Amendment and will contain a complete and detailed cost breakdown for Total for Subcontract Costs. If electrical or mechanical subcontractors are selected under RCW 39.10.385, that portion of the Total for Subcontract Costs allocable to any such subcontractor will determined as the sum equal to the maximum allowable subcontract cost (MASC) following negotiations as required by RCW 39.10.385 and the MASC (once established) will be administered in accordance with RCW 39.10.385. 6.3.2 6.3.2. In no event will the Port be required to pay GC/CM from the Total for Subcontract Costs for any costs incurred due to the following conditions: 6.3.2.1 Fines, penalties or other costs for re-inspection related to enforcement or compliance actions by any regulatory agency, including but not limited to the Washington State Department of Ecology. Assessment of fines is in addition to any liquidated damages or other damages related to performance of this GC/CM Contract, regardless of time of occurrence. 6.3.2.2 Costs due to breach or negligence of GC/CM, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property, including trade damage (although that damage may be paid from the MACC Risk Contingency Account as authorized by Section 6.4.2).
Appears in 1 contract
Sources: Gc/Cm Contract
Total for Subcontract Costs. 6.3.1 6.3.1. If a MACC is mutually accepted following negotiations, the Total for Subcontract Costs will be included in this GC/CM Contract as part of the MACC Amendment and will contain a complete and detailed cost breakdown for Total for Subcontract Costs. If electrical or mechanical subcontractors are selected under RCW 39.10.385, that portion of the Total for Subcontract Costs allocable to any such subcontractor will determined as the sum equal to the maximum allowable subcontract cost (MASC) following negotiations as required by RCW 39.10.385 and the MASC (once established) will be administered in accordance with RCW 39.10.385.
6.3.2 6.3.2. In no event will the Port be required to pay GC/CM from the Total for Subcontract Costs for any costs incurred due to the following conditions:
6.3.2.1 Fines, penalties or other costs for re-inspection related to enforcement or compliance actions by any regulatory agency, including but not limited to the Washington State Department of Ecology. Assessment of fines is in addition to any liquidated damages or other damages related to performance of this GC/CM Contract, regardless of time of occurrence.
6.3.2.2 Costs due to breach or negligence of GC/CM, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property, including trade damage (although that damage may be paid from the MACC Risk Contingency Account as authorized by Section 6.4.2).