Tract E Sample Clauses

Tract E. (Teton Rim Golf Village). This tract will be converted into 12 residential lots.3 1 Of the 360 units originally approved, 155 units have been sold. 2 The Prior Development Agreements and Master Plan Amendments authorized a total of 40 cluster cabins. Pursuant to the Administrative Amendments, the number of cluster cabins was reduced by 20 cabins, resulting in a total reduction of 32 cluster cabins and an increase of open space of about 17.39 acres. 3 The units associated with Tract E, Tract G, and ▇▇▇▇ ▇▇-▇▇ ▇▇▇▇▇ ▇ ▇▇▇▇▇ ▇▇ deferred until a final decision is made relative to the construction of a golf course. The lot and tracts shall revert to the uses shown on the original master plan if a golf course is constructed. If no golf course is constructed, these lots and tracts shall be used for residential development and incidental uses as described herein.
Tract E. (Teton Rim Golf Village). This tract will be converted into 12 residential lots.3
Tract E. That approximately 6 acre tract of land described on Exhibit 1.4, affixed hereto and by this reference made a part hereof (hereinafter referred to as the "Tract E Tract"). CDA and Trade Partners agree that the value of the Maumelle Tracts is agreed to be Eight Million Three Hundred Thousand Dollars ($8,300,000.00) (the "Agreed Land Value"). TradeArk shall assume at Closing debt of CDA associated with the Maumelle Tracts in the exact amount of Three Million Eight Hundred Thousand Dollars ($3,800,000.00) (the "Maumelle Assumed Debt"), which shall be identified by CDA at Closing. Some of the Maumelle Assumed Debt is secured by mortgages (the "Assumed Mortgages") on certain parcels of the Maumelle Tracts.
Tract E. (Teton Rim Golf Village). This tract will be converted into 12 residential lots.3 1 Of the 360 units originally approved, 155 units have been sold. 2 The Prior Development Agreements and Master Plan Amendments authorized a total of 40 cluster cabins. Pursuant to the Administrative Amendments, the number of cluster cabin lots was reduced by 20 cabin lots. The remaining 20 lots will be converted from cluster cabin lots to single family residential units resulting in a total reduction of 32 cluster cabin lots and an increase of open space of about 17.39 acres. 3 The units associated with Tract E, Tract G, and ▇▇▇▇ ▇▇-▇▇ ▇▇▇▇▇ ▇ ▇▇▇▇▇ ▇▇ deferred until a final decision is made relative to the construction of a golf course. If a golf course is constructed, the owner will apply for a plat amendment and comply with the applicable provisions established in the Teton County Subdivision Regulations to permit Tracts E and G and ▇▇▇▇ ▇▇-▇▇ ▇▇▇▇▇ ▇ to be used for purposes associated with the golf course as described herein. If no golf course is constructed, these lots and tracts shall be used for residential development and incidental uses as described herein.
Tract E. (RiverTeton Rim Golf Village). This tract will was be converted into 12 residential lots. These 12 residential lots will be moved to other locations in the development and Tract E will become two Golf Village lots. Tract E would have the following anticipated uses: Tennis  Swimming Pool/Spa/Health Club/ Facility/Hot Springs  Shops/Services/Office Space/Conference/Sales/Property Management
Tract E. Tract E shall be dedicated to Brevard County for the purpose of the construction and maintenance of a lift station.

Related to Tract E

  • acres Site-Specific Conditions

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • Lots 5.1. The 1 (one) standard lot size is the measurement unit specified for each CFD. The Company may offer standard lots, micro-lots and mini-lots, in its discretion, as defined from time to time in the Contract Specifications or the Company’s Website.

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes. 13.2 It shall be the responsibility of each Party to program and update its own switches and network systems pursuant to information provided on ASRs as well as the LERG in order to recognize and route traffic to the other Party’s assigned NXX codes. Except as expressly set forth in this Agreement, neither Party shall impose any fees or charges whatsoever on the other Party for such activities. 13.3 Unless otherwise required by Commission order, the Rate Center Areas will be the same for each Party. During the term of this Agreement, Onvoy shall adopt the Rate Center Area and Rate Center Points that the Commission has approved for Frontier within the LATA and Tandem serving area. Onvoy shall assign whole NPA-NXX codes to each Rate Center Area unless otherwise ordered by the FCC, the Commission or another governmental entity of appropriate jurisdiction, or the LEC industry adopts alternative methods of utilizing NXXs. 13.4 Onvoy will also designate a Routing Point for each assigned NXX code. Onvoy shall designate one location for each Rate Center Area in which the Onvoy has established NXX code(s) as the Routing Point for the NPA-NXXs associated with that Rate Center Area, and such Routing Point shall be within the same LATA as the Rate Center Area but not necessarily within the Rate Center Area itself. Unless specified otherwise, calls to subsequent NXXs of Onvoy will be routed in the same manner as calls to ▇▇▇▇▇’s initial NXXs. 13.5 Notwithstanding anything to the contrary contained herein, nothing in this Agreement is intended, and nothing in this Agreement shall be construed, to in any way constrain Onvoy’s choices regarding the size of the local calling area(s) that Onvoy may establish for its Customers, which local calling areas may be larger than, smaller than, or identical to Frontier’s local calling areas.

  • Meters 7.1.1 For installation of Meters, Meter testing, Meter calibration and Meter reading and all matters incidental thereto, the SPD and SECI shall follow and be bound by the Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006, the Grid Code, as amended and revised from time to time. 7.1.2 The SPD shall bear all costs pertaining to installation, testing, calibration, maintenance, renewal and repair of meters at SPD’s side of Delivery Point. 7.1.3 In addition to ensuring compliance of the applicable codes, the SPD shall install Main & Check meters at the Delivery Point, along with Stand-by meter(s) as per the applicable Central/State regulations. 7.1.4 In case of pooling of multiple Projects, power from multiple Projects can be pooled at a Pooling Substation prior to the Delivery point and the combined power can be fed at Delivery point through a common transmission line from the Pooling Substation. In such cases, ABT compliant sub-meters as per relevant regulation/approval are also to be set up at pooling substation for individual projects in addition to the meters at Delivery Point as described in clause 7.1.3.