Common use of Traffic Signal Warrant Study & Post Development Signal Clause in Contracts

Traffic Signal Warrant Study & Post Development Signal. Optimization Study. Not later than six (6) months after 85% occupancy of Phase I of the Proposed Development is first attained RFA shall notify the Township and cause its traffic engineer to conduct a traffic signal warrant study (“Phase I Warrant Study”) to determine if a traffic signal is warranted at the intersection of ▇▇▇▇▇▇▇’▇ Ferry Road and Monument Avenue. If the Phase I Warrant Study does not reveal that a traffic signal is warranted RFA shall not later than six (6) months after 50% occupancy of Phase II of the Proposed Development is first attained notify the Township and cause its traffic engineer to conduct another traffic signal warrant study (“Phase II Warrant Study”) to determine if a traffic signal is warranted at the intersection of ▇▇▇▇▇▇▇’▇ Ferry Road and Monument Avenue. Not later than six (6) months after 90% occupancy of both Phase I and Phase II of the Proposed Development is first attained RFA shall notify the Township and cause its traffic engineer to conduct a post-development traffic study to verify that the signal timings at the other studied, signalized intersections are optimized. If neither the Phase I Warrant Study nor the Phase II Warrant Study indicate that a traffic signal is warranted at the intersection of Righters Ferry Road and Monument Avenue then the post- development traffic study shall also include a traffic signal warrant study (the “Final Warrant Study”) to determine if a traffic signal is warranted.

Appears in 1 contract

Sources: Settlement Agreement

Traffic Signal Warrant Study & Post Development Signal. Optimization Study. Not later than six (6) months after 85% occupancy of Phase I of the Proposed Development is first attained RFA shall notify the Township and cause its traffic engineer to conduct a traffic signal warrant study (“Phase I Warrant Study”) Study”)3 to determine if a traffic signal is warranted at the intersection of ▇▇▇▇▇▇▇’▇ Ferry Road and Monument AvenueRoad. If the Phase I Warrant Study does not reveal that a traffic signal is warranted RFA shall not later than six (6) months after 50% occupancy of Phase II of the Proposed Development is first attained notify the Township and cause its traffic engineer to conduct another traffic signal warrant study (“Phase II Warrant Study”) to determine if a traffic signal is warranted at the intersection of ▇▇▇▇▇▇▇’▇ Ferry Road and Monument AvenueRoad. Not later than six (6) months after 90% occupancy of both Phase I and Phase II of the Proposed Development is first attained RFA shall notify the Township and cause its traffic engineer to (i) cause its traffic engineer to conduct another traffic signal warrant study (“Final Warrant Study”) to determine if a traffic signal is warranted at the intersection of ▇▇▇▇▇▇▇’▇ Ferry Road and Monument Road and (ii) conduct a post-development traffic study to verify that the signal timings at the other studied, signalized intersections are optimized. If neither the Phase I Warrant Study nor the Phase II Warrant Study indicate that a traffic signal is warranted at the intersection of Righters Ferry Road and Monument Avenue then the post- development traffic study shall also include a traffic signal warrant study (the “Final Warrant Study”) to determine if a traffic signal is warranted.

Appears in 1 contract

Sources: Settlement Agreement