Cloud storage DSHS Confidential Information requires protections equal to or greater than those specified elsewhere within this exhibit. Cloud storage of Data is problematic as neither DSHS nor the Contractor has control of the environment in which the Data is stored. For this reason: (1) DSHS Data will not be stored in any consumer grade Cloud solution, unless all of the following conditions are met: (a) Contractor has written procedures in place governing use of the Cloud storage and Contractor attests in writing that all such procedures will be uniformly followed. (b) The Data will be Encrypted while within the Contractor network. (c) The Data will remain Encrypted during transmission to the Cloud. (d) The Data will remain Encrypted at all times while residing within the Cloud storage solution. (e) The Contractor will possess a decryption key for the Data, and the decryption key will be possessed only by the Contractor and/or DSHS. (f) The Data will not be downloaded to non-authorized systems, meaning systems that are not on either the DSHS or Contractor networks. (g) The Data will not be decrypted until downloaded onto a computer within the control of an Authorized User and within either the DSHS or Contractor’s network. (2) Data will not be stored on an Enterprise Cloud storage solution unless either: (a) The Cloud storage provider is treated as any other Sub-Contractor, and agrees in writing to all of the requirements within this exhibit; or, (b) The Cloud storage solution used is FedRAMP certified. (3) If the Data includes protected health information covered by the Health Insurance Portability and Accountability Act (HIPAA), the Cloud provider must sign a Business Associate Agreement prior to Data being stored in their Cloud solution.
TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees. 2. Where an employee is absent from work because of illness or accident and has advised the company in accordance with Clause 33 – Personal Leave of the award, the company shall ensure that the employee’s tools are securely stored during his/her absence.
Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.
meminta nasihat daripada Pihak ▇▇▇▇▇▇ dalam semua perkara berkenaan dengan jualan lelongan, termasuk Syarat-syarat Jualan (iii) membuat carian Hakmilik ▇▇▇▇▇ ▇▇▇▇▇▇ rasmi di Pejabat Tanah ▇▇▇/atau ▇▇▇▇-▇▇▇▇ Pihak-pihak Berkuasa yang berkenaan ▇▇▇ (iv) membuat pertanyaan dengan Pihak Berkuasa yang berkenaan samada jualan ini terbuka kepada semua bangsa atau kaum Bumiputra Warganegara Malaysia sahaja atau melayu sahaja ▇▇▇ juga mengenai persetujuan untuk jualan ini sebelum jualan lelong.Penawar yang berjaya ("Pembeli") dikehendaki dengan segera memohon ▇▇▇ mendapatkan kebenaran pindahmilik (jika ada) daripada Pihak Pemaju ▇▇▇/atau Pihak Tuanpunya ▇▇▇/atau Pihak Berkuasa Negeri atau badan-badan berkenaan (v) memeriksa ▇▇▇ memastikan samada jualan ini dikenakan cukai. HAKMILIK : Hakmilik strata bagi hartanah ini masih belum dikeluarkan HAKMILIK INDUK / NO. LOT : Pajakan Negeri 35263, Lot No.29096 MUKIM/DAERAH/NEGERI : Setapak / Kuala Lumpur / Wilayah Persekutuan Kuala Lumpur PEGANGAN : Pajakan selama 82-tahun berakhir pada 08/08/2085 KELUASAN LANTAI : 81.104 meter persegi ( 873 kaki persegi ) PEMAJU/PENJUAL : Mega Planner Jaya Sdn Bhd (326287-W)(Dalam Likuidasi) TUANPUNYA : Datuk Bandar Kuala Lumpur PEMBELI : ▇▇▇▇▇▇▇▇ Bin ▇▇▇▇▇ @ ▇▇▇▇ BEBANAN : Diserahhak kepada RHB Bank Berhad [196501000373 (6171-M)] Hartanah tersebut terletak di tingkat 9 pada bangunan apartment 14-tingkat terletak di Melati Impian Apartment, Setapak Fasa 1, Kuala Lumpur. Hartanah tersebut adalah sebuah unit apartment 3 ▇▇▇▇▇ dikenali sebaga ▇▇▇▇▇ Pemaju No. 9, Tingkat No.9, Pembangunan dikenali sebagai Melati Impian Apartment Setapak Fasa 1, Kuala Lumpur ▇▇▇ mempunyai alamat surat-▇▇▇▇▇▇▇▇ ▇▇ ▇▇▇▇ ▇▇. ▇-▇, ▇▇▇▇▇▇ Impian Apartment, ▇▇▇▇▇ ▇/▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇. Harta ini dijual “keadaan seperti mana sediada” dengan harga rizab sebanyak RM 300,000.00 (RINGGIT MALAYSIA: TIGA RATUS RIBU SAHAJA) ▇▇▇ tertakluk kepada syarat-syarat Jualan ▇▇▇ melalui penyerahan hakkan dari Pemegang Serahak, tertakluk kepada kelulusan di perolehi oleh pihak Pembeli daripada pihak berkuasa, jika ada, termasuk semua terma, syarat ▇▇▇ perjanjian yang dikenakan ▇▇▇ mungkin dikenakan oleh Pihak Berkuasa yang berkenaan. Pembeli bertanggungjawab sepenuhnya untuk memperolehi ▇▇▇ mematuhi syarat-syarat berkenaan daripada Pihak Berkuasa yang berkenaan, jika ada ▇▇▇ semua ▇▇▇ ▇▇▇ perbelanjaan ditanggung ▇▇▇ dibayar oleh ▇▇▇▇▇ ▇▇▇▇▇▇▇.Pembeli atas talian (online) juga tertakluk kepada terma-terma ▇▇▇ syarat-syarat terkandung dalam ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Pembeli yang berminat adalah dikehendaki mendeposit kepada Pelelong 10% daripada harga rizab dalam bentuk Bank Draf atau Cashier’s Order di atas nama RHB Bank Berhad sebelum lelongan awam ▇▇▇ ▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇ hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh lelongan kepada RHB Bank Berhad melalui Bank Draf / ▇▇▇▇▇▇. Butir-butir pembayaran melalui ▇▇▇▇▇▇, ▇▇▇▇ berhubung dengan Tetuan Zahrin Emrad & Sujaihah. Untuk maklumat lanjut, ▇▇▇▇ berhubung dengan TETUAN ZAHRIN EMRAD & SUJIAHAH, yang beralamat di Suite 10.3, 10th Floor, ▇▇▇ ▇▇▇▇ Building, ▇▇.▇▇, ▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇. Tel: ▇▇-▇▇▇▇ ▇▇▇▇ / Fax: ▇▇-▇▇▇▇ ▇▇▇▇. [ Ruj: ZES/ZHR/RHB-FC/16250-17/0614-pae ], peguamcara bagi pihak pemegang ▇▇▇▇▇ ▇▇▇ atau pelelong yang tersebut dibawah.
Alcoholic Beverages Costs of alcoholic beverages are unallowable.