Common use of Transportation Improvements Clause in Contracts

Transportation Improvements. a. The Developer will redesign Park Center Court, which is shown as Road A on the Master Plan (“Road A”) in Phase 1A. Road A will extend from Manassas Drive to the New City Hall, the VRE Garage, and the Phase 1A Two-over-Two residential development in accordance with the Master Plan. b. The Developer will construct a distinctive vehicular and pedestrian intersection at Manassas Drive and Park Center Court in the area depicted on the Master Plan. c. The Developer will modify the existing traffic signal to improve pedestrian safety and vehicular turns at that intersection in the area depicted on the Master Plan. d. The Developer will construct Road B in Phase 1A once the City has acquired title to Lot 1A. Road B will extend from Manassas Drive to the VRE Garage and from the VRE Garage to Park Center Court in accordance with the Master Plan. e. The Developer will construct or cause to be constructed the road shown on the Master Plan as Road D-1 in conjunction with the construction of the residential development of Phase 1A. Road D-1 will connect with Road A and will be privately-owned and maintained.

Appears in 1 contract

Sources: Comprehensive Development Agreement

Transportation Improvements. a. The Developer will redesign Park Center Court, which is shown as Road A on the Master Plan (“Road A”) in Phase 1A. Road ▇▇▇▇▇ ▇▇. ▇▇▇▇ A will extend from Manassas Drive to the New City Hall, the VRE Garage▇▇▇ ▇▇▇▇▇▇, and the Phase 1A Two▇▇▇ ▇▇▇ ▇▇▇▇▇ ▇▇ ▇▇▇-over▇▇▇▇-Two ▇▇▇ residential development in accordance with the Master Plan. b. The Developer will construct a distinctive vehicular and pedestrian intersection at Manassas Drive and Park Center Court in the area depicted on accordance with the Master Plan. c. The Developer will modify the existing traffic signal to improve pedestrian safety and vehicular turns at that intersection in the area depicted on accordance with the Master Plan. d. The Developer will construct Road B in Phase 1A once the City has acquired title to Lot 1A. Road B ▇▇▇ ▇▇. ▇▇▇▇ ▇ will extend from Manassas Drive to the VRE Garage and from the VRE Garage to Park Center Court in accordance with the Master Plan. e. The Developer will construct or cause to be constructed the road shown on the Master Plan as Road D-1 in conjunction with the construction of the residential development of Phase 1A. Road D-1 ▇▇▇▇▇ ▇▇. ▇▇▇▇ ▇-▇ will connect with Road A and will be privately-owned and maintained.

Appears in 1 contract

Sources: Comprehensive Development Agreement