Transporting and Placing Sample Clauses

Transporting and Placing. The methods and equipment used and the speed required for transporting concrete shall be such that concrete having the required composition and constancy will be delivered into the work, without objectionable segregation, loss of slump, and delay. Except as otherwise specified for ready-mixed concrete, the time elapsed between the first wetting of concrete ingredients and the completion of placing the concrete in the work shall in no instance exceed 30 minutes. Retempering of concrete will not be permitted. Any concrete which has become so stiff that proper placing cannot be assured shall be wasted. Concrete shall be deposited as far as practicable directly in its final position and shall not be placed in a manner permitting or causing segregation. The Contractor shall provide suitable openings in the formwork and/or drop chutes and baffles to confirm and control the falling of concrete, and to limit its free drop to a maximum of 1.50 meters. Except as intersected by joints, all formed concrete shall be placed in continuous approximately horizontal layers, the depths of which shall not exceed 60 cm, in such a manner that no layer of concrete will begin setting before the next layer is placed on top of it. In no case shall the delay between the placing of any two adjacent layers be such that the vibrating unit will not readily penetrate of its own weight the concrete placed before the delay. Concreting shall be carried out continuously between and up to joints, the position and arrangement of which shall be predetermined and no interruption of placing other than at these joints will be permitted. To this end, the Contractor shall take all necessary measures, such as preparing a sufficient stock of materials, stand-by equipment, shift-work, lighting for night-work, etc. 5.1. Where required the Contractor shall also provide keyways, dowels, and/or waterstops to ensure a perfect bond and/or watertightness at the joint. Where the concrete abuts against earth or any other material liable to become loose, the greatest possible care shall be taken to avoid falls or run of such or other materials upon the surface of the concrete, and if any such falls or runs occur the surface of the work soiled thereby shall be removed until a new and clean surface shall have been obtained, and all spaces left by such falls or runs beyond the prescribed dimensions of the work, or caused by the negligence or for the convenience of the Contractor, shall be built up with concrete at ...

Related to Transporting and Placing

  • SHIPPING AND AIR TRANSPORT 1. Profits of an enterprise of a Contracting State from the operation of ships or aircraft in international traffic shall be taxable only in that State. 2. The provisions of paragraph 1 shall also apply to profits from the participation in a pool, a joint business or an international operating agency.

  • PACKING AND SHIPPING a. Seller shall pack Goods to prevent damage and deterioration. Unless otherwise set forth in this Contract, Seller shall package Goods in accordance with the requirements of Boeing Document D37522-6 “Supplier Packaging.” Buyer may charge Seller for damage to or deterioration of any Goods resulting from improper packing or packaging. b. If this Contract specifies FOB destination (place of delivery), then in addition to any other shipping instructions, Seller shall forward Goods freight prepaid. Seller shall make the transportation arrangements, pay the shipping costs, and remain responsible for Goods until Goods are delivered and Buyer takes possession at the destination. c. If this Contract specifies FOB origin (place of shipment), then in addition to any other shipping instructions, Seller shall forward Goods collect. For Goods shipped within the United States, Seller shall make no declaration concerning the value of Goods shipped except on Goods where the tariff rating is dependent upon released or declared value. In such event, Seller shall release or declare such value at the maximum value within the lowest rating. Seller shall ship Goods in accordance with the Boeing Global Routing Guide found at ▇▇▇▇▇://▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇/logistics.html. Upon Buyer’s request, Seller shall identify packaging charges showing material and labor costs for container fabrication. d. Seller shall provide with each container shipped under this Contract an Advanced Shipping Notice (“ASN”). For each container shipped, Seller shall provide two (2) readable copies of the ASN barcode as follows: one (1) copy is to be securely affixed to the outside of each container and one (1) copy is to be loose inside each container. Non-conforming shipments are subject to rejection and repackaging at Seller’s expense. Instructions and guidelines related to the ASN process can be found on the Boeing Supplier Portal. Seller shall access by selecting the “Enterprise ASN Instructions” hyper-link under the header “Exostar Resources.” A copy of these instructions can also be found at ▇▇▇▇▇://▇▇▇.▇▇▇▇▇▇▇.▇▇▇/.

  • Packaging and Shipping All shipping containers shall be packed and packaged to: (i) ensure safe arrival to final destination; (ii) secure the lowest transportation costs;(iii) comply with requirements of common carriers; (iv) meet Buyer's written instructions; and (v) meet the requirements of all applicable laws, ordinances, rules and regulations.

  • SHIPPING AND SHIPPING COSTS All delivered Equipment and Products must be properly packaged. Damaged Equipment and Products may be rejected. If the damage is not readily apparent at the time of delivery, Supplier must permit the Equipment and Products to be returned within a reasonable time at no cost to Sourcewell or its Participating Entities. Participating Entities reserve the right to inspect the Equipment and Products at a reasonable time after delivery where circumstances or conditions prevent effective inspection of the Equipment and Products at the time of delivery. In the event of the delivery of nonconforming Equipment and Products, the Participating Entity will notify the Supplier as soon as possible and the Supplier will replace nonconforming Equipment and Products with conforming Equipment and Products that are acceptable to the Participating Entity. Supplier must arrange for and pay for the return shipment on Equipment and Products that arrive in a defective or inoperable condition. Sourcewell may declare the Supplier in breach of this Contract if the Supplier intentionally delivers substandard or inferior Equipment or Products.

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.