Trenching or digging Sample Clauses

Trenching or digging. No person except a licensed digger or a contractor engaged in laying water mains shall do any trenching or digging within a street right-of-way, to lay or repair service lines or make private main extensions. These provisions shall not apply in emergencies. Trenching done by the city on private property shall be paid by the property owner.

Related to Trenching or digging

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • Grading The coarse aggregate as delivered to the mixer, shall be well graded as per IS specifications. Maximum size of aggregate used for the work shall be 20mm or 40mm or as specified in items in the bill of quantities and it shall confirm to IS: 383-1970, clause 4.2 (Table-2) However, the exact gradation required to produce a dense concrete of specified strength and desired workability shall be decided as per laboratory test by the Engineer. Coarse aggregate for use in concrete shall be well graded and shall conform to IS: 383-1970 requirements (as per Table-II) given below: 63mm 100 - - - 40mm ▇▇-▇▇▇ ▇▇▇ - - 20mm ▇▇-▇▇ ▇▇-▇▇▇ 100 - 16mm - - ▇▇-▇▇▇ ▇▇▇ 12.5 - - - 90-100 10.00 ▇▇-▇▇ ▇▇-▇▇ ▇▇-▇▇ ▇▇-▇▇ 4.75mm 0-5 0-10 0-10 0-10

  • Crane Erection & Jumping (a) Cranes and man/material hoists may be erected, altered, climbed and dismantled during times when ordinary production works are in progress subject to the work being done in full compliance with a relevant operational safety zone (OSZ) plan which has been developed specifically for that operation with consideration to overall site safety. (b) The crane crew for each tower crane (Crane Crew) must consist of the following: (i) crane driver; and (ii) three (3) dogmen. (c) In addition to the appropriate tickets held by the crane driver and the dogmen, the following high risk licences must be held amongst the Crane Crew: (i) rigging; and (ii) material handling. (d) Where a Project consists of a single Crane Crew, the Employer should endeavour to ensure another member of the Crane Crew holds a crane driver licence.

  • Unbundled Network Element Combinations 5.1. Unbundled Network Element Combinations shall include: 1) Enhanced Extended Links (EELs); 2) UNE Loops/Special Access Combinations; 3) Loop/Port Combinations; and 4)

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.