TTEthernet Startup and Synchronization Agreement Clause Samples

TTEthernet Startup and Synchronization Agreement. With this implementation of TTEthernet being constrained to only asymmetric benign faults, relatively simple startup and synchronization protocols can be used with high confidence. Startup consists of any one of a designated class of nodes sending out a unique coldstart frame. Given that switches can only be benignly faulty, this coldstart frame cannot be successfully forged in a way that can adversely affect the protocol. All good end systems that hear a coldstart frame acknowledge that frame and the time line that enforces the time-triggered traffic class begins. During execution of the TTEthernet timeline, periodic synchronization events are scheduled. In each synchronization event, Synchronization Masters transmit protocol control frames at the time that each of these end systems thinks it is correct to do so. The self-checking pair switches contain the Compression Master function that acts as a majority voter for the synchronization frames. Given that faulty switches are only asymmetrically benign, the only failure behavior they exhibit is a failure to deliver the synchronization frames to all end systems. That is, there are no possible failures affecting integrity, only availability. The required availability is provided by the use of multiple switches. Each end system is directly connected to a number of switches that is sufficient to meet the system’s availability requirements. The TTEthernet standard [1] establishes the algorithms and the quorum criteria required to meet the system fault tolerance requirements for the synchronization protocol.

Related to TTEthernet Startup and Synchronization Agreement

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at a P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Data Processing Agreement The Data Processing Agreement, including the Approved Data Transfer Mechanisms (as defined in the Data Processing Agreement) that apply to your use of the Services and transfer of Personal Data, is incorporated into this Agreement by this reference. Each party will comply with the terms of the Data Processing Agreement and will train its employees on DP Law.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If WCS chooses to subtend a Verizon access Tandem, WCS’s NPA/NXX must be assigned by WCS to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 WCS shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from WCS’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office WCS utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow WCS’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • FRAMEWORK AGREEMENT MANAGEMENT The Parties shall manage this Framework Agreement in accordance with Schedule 14 (Framework Management).