Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters). 2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance. 2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Telecom. 2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire. 2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom or BellSouth provides ninety
Appears in 2 contracts
Sources: Interconnection Agreement, Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomAzul Tel.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Azul Tel to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Azul Tel or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 2 contracts
Sources: Interconnection Agreement, Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomTelepak Networks.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Telepak Networks to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Telepak Networks or BellSouth provides ninety
Appears in 2 contracts
Sources: Clec Agreement, Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomVelocity.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Velocity to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Velocity or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomINET.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom INET to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom INET or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomStarlink.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Starlink to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Starlink or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomOnePoint.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom OnePoint to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom OnePoint or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomBudget Phone.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Budget Phone to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Budget Phone or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomInternational Telnet.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom International Telnet to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom International Telnet or BellSouth provides ninety
Appears in 1 contract
Sources: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomNOW.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom NOW to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom NOW or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomSail Networks.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Sail Networks to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Sail Networks or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomVictory.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Victory to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Victory or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomEZ Phone.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom EZ Phone to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom EZ Phone or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap parameters for non- loaded loop facilities and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities working circuits has been requested by Southern TelecomTCG.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom TCG to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s significantly degrade other services on the BellSouth network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom TCG or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomABC Telcom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom ABC Telcom to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom ABC Telcom or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomLight.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Light to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Light or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomAirCover.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom AirCover to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom AirCover or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Telecom▇▇▇▇.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom ▇▇▇▇ to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom ▇▇▇▇ or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Sail Telecom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Sail Telecom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Sail Telecom or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomTel West.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Tel West to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Tel West or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomComm South.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Comm South to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Comm South or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap parameters for non- loaded loop facilities and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities working circuits has been requested by Southern Telecom.AT&T.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom AT&T to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s significantly degrade other services on the BellSouth network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom AT&T or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomPLI.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom PLI to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom PLI or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap parameters for non- loaded loop facilities and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities working circuits has been requested by Southern TelecomAT&T AND TC SYSTEMS.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom AT&T AND TC SYSTEMS to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s significantly degrade other services on the BellSouth network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom AT&T AND TC SYSTEMS or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomJCM.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom JCM to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom JCM or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomBSE.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom BSE to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom BSE or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomFPB.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom FPB to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom FPB or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomNewcomm.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Newcomm to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Newcomm or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomFreedom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Freedom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Freedom or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomNTBS.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom NTBS to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom NTBS or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomEZ Phone.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom EZ Phone to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom EZ Phone or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomStarlink.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Starlink to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Starlink or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomONS.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom ONS to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom ONS or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomWorldxChange.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom WorldxChange to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom WorldxChange or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomICG.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom ICG to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom ICG or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomThink 12.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Think 12 to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Think 12 or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Telecom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomConextel.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Conextel to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Conextel or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomCharter.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Charter to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Charter or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomMicro-Comm.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Micro-Comm to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Micro-Comm or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomQuality Telephone.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Quality Telephone to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Quality Telephone or BellSouth provides ninety
Appears in 1 contract
Sources: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomCovista.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Covista to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Covista or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Coral Telecom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Coral Telecom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Coral Telecom or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomCOMTECH21.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom COMTECH21 to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom COMTECH21 or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomNexus.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Nexus to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Nexus or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomUtility USA.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Utility USA to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Utility USA or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomAmeriMex.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom AmeriMex to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom AmeriMex or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomNationsLink.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom NationsLink to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom NationsLink or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Solution Telecom.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Solution Telecom to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Solution Telecom or BellSouth provides ninety
Appears in 1 contract
Sources: Clec Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet 18kft or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet 6kft of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern Telecom▇▇▇▇▇▇▇▇.▇▇▇.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom ▇▇▇▇▇▇▇▇.▇▇▇ to provide a wide-wide range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) NID at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this AgreementAmendment, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this AgreementAmendment. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement Amendment may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom ▇▇▇▇▇▇▇▇.▇▇▇ or BellSouth provides ninetyninety (90) calendar days notice that such UCL-L must be terminated.
Appears in 1 contract
Sources: Interconnection Agreement
Unbundled Copper Loop – Designed (UCL-D). 2.4.2.1 The UCL-D will be provisioned as a dry copper twisted pair (2- or 4-wire) Loop that is unencumbered by any intervening equipment (e.g., filters, load coils, range extenders, digital loop carrier, or repeaters).
2.4.2.2 A UCL-D will be 18,000 feet or less in length and is provisioned according to Resistance Design parameters, may have up to 6,000 feet of bridged tap and will have up to 1300 Ohms of resistance.
2.4.2.3 The UCL-D is a designed circuit, is provisioned with a test point, and comes standard with a DLR. OC is a chargeable option for a UCL-D; however, OC is always required on UCLs where a reuse of existing facilities has been requested by Southern TelecomRing Connection.
2.4.2.4 These Loops are not intended to support any particular services and may be utilized by Southern Telecom Ring Connection to provide a wide-range of telecommunications services as long as those services do not adversely affect BellSouth’s network. This facility will include a Network Interface Device (NID) at the customer’s location for the purpose of connecting the Loop to the customer’s inside wire.
2.4.2.5 Upon the Effective Date of this Agreement, Unbundled Copper Loop – Long (UCL-L) elements will no longer be offered by BellSouth and no new orders for UCL-L will be accepted. Any existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement will be grandfathered at the rates set forth in the Parties’ interconnection agreement that was in effect immediately prior to the Effective Date of this Agreement. Existing UCL-Ls that were provisioned prior to the Effective Date of this Agreement may remain connected, maintained and repaired according to BellSouth’s TR73600 and may remain connected until such time as they are disconnected by Southern Telecom Ring Connection or BellSouth provides ninety
Appears in 1 contract
Sources: Clec Agreement