Uncertainties in Sediment Transport Assessment Sample Clauses

Uncertainties in Sediment Transport Assessment. Uncertainties in the assessment of the impacts from suspended sediment plumes will be considered when drawing conclusions from the assessment. In carrying out the assessment, the worst case assumptions have been made in order to provide a conservative assessment of environmental impacts. These assumptions are as follows: ◼ The assessment is based on the peak sediment release rate for grab /TSHD dredging, backfilling and capping. Based on the past operation pattern at existing facilities, operation at peak rate is very unlikely and if happened, will only occur for short periods of time. Thus the proposed scenario is very conservative; ◼ The proposed modelling scenarios cover the worst case in term of plant use (i.e. simulate ▇▇▇▇▇▇ barge disposal instead of TSHD); ◼ The modelled locations for dredging / backfilling / capping are selected such that the sediment sources are at its shortest distance from the nearest sensitive receivers. This ensures the worst case water quality impact be modelled and assessed in this modelling study despite of the uncertainties in; ◼ The calculation of sediment loss rates is based on conservative estimates for the types of plant and methods of working; and ◼ Past records of EM&A at existing CMPs to the East of Sha ▇▇▇▇ indicate exceedance of water quality objectives rarely occurs, indicating the operation of such CMPs would not result in significant water quality impact. The following uncertainties have not been included in the construction / operation phase marine construction modelling assessment: ◼ Ad hoc navigation of marine traffic; ◼ Propeller scour of seabed sediments from vessels; ◼ Near shore scouring of bottom sediment; and ◼ Access of marine barges back and from the site.

Related to Uncertainties in Sediment Transport Assessment

  • Environmental Assessment and Mitigation Development of a transportation project must comply with applicable environmental laws. The party named in article 1, Responsible Parties, under AGREEMENT is responsible for the following: A. The identification and assessment of any environmental problems associated with the development of a local project governed by this Agreement. B. The cost of any environmental problem’s mitigation and remediation. C. Providing any public meetings or public hearings required for the environmental assessment process. Public hearings will not be held prior to the approval of Project schematic. D. The preparation of the NEPA documents required for the environmental clearance of this Project. If the Local Government is responsible for the environmental assessment and mitigation, before the advertisement for bids, the Local Government shall provide to the State written documentation from the appropriate regulatory agency or agencies that all environmental clearances have been obtained.

  • Adverse Weather Shall be only weather that satisfies all of the following conditions: (1) unusually severe precipitation, sleet, snow, hail, or extreme temperature or air conditions in excess of the norm for the location and time of year it occurred based on the closest weather station data averaged over the past five years, (2) that is unanticipated and would cause unsafe work conditions and/or is unsuitable for scheduled work that should not be performed during inclement weather (i.e., exterior finishes), and (3) at the Project.

  • Environmental Conditions A Phase I environmental site assessment (or update of a previous Phase I and or Phase II environmental site assessment) and, with respect to certain Mortgage Loans, a Phase II environmental site assessment (collectively, an “ESA”) meeting ASTM requirements conducted by a reputable environmental consultant in connection with such Mortgage Loan within 12 months prior to its origination date (or an update of a previous ESA was prepared), and such ESA (i) did not identify the existence of recognized environmental conditions (as such term is defined in ASTM E1527-13 or its successor, hereinafter “Environmental Condition”) at the related Mortgaged Property or the need for further investigation, or (ii) if the existence of an Environmental Condition or need for further investigation was indicated in any such ESA, then at least one of the following statements is true: (A) an amount reasonably estimated by a reputable environmental consultant to be sufficient to cover the estimated cost to cure any material noncompliance with applicable Environmental Laws or the Environmental Condition has been escrowed by the related Mortgagor and is held or controlled by the related Mortgagee; (B) if the only Environmental Condition relates to the presence of asbestos-containing materials, radon in indoor air, lead based paint or lead in drinking water, the only recommended action in the ESA is the institution of such a plan, an operations or maintenance plan has been required to be instituted by the related Mortgagor that can reasonably be expected to mitigate the identified risk; (C) the Environmental Condition identified in the related environmental report was remediated or abated in all material respects prior to the date hereof, and, if and as appropriate, a no further action or closure letter was obtained from the applicable governmental regulatory authority (or the environmental issue affecting the related Mortgaged Property was otherwise listed by such governmental authority as “closed” or a reputable environmental consultant has concluded that no further action is required); (D) an environmental policy or a lender’s pollution legal liability insurance policy that covers liability for the identified circumstance or condition was obtained from an insurer rated no less than “A-” (or the equivalent) by ▇▇▇▇▇’▇ Investors Service, Inc., S&P Global Ratings, acting through Standard & Poor’s Financial Services LLC, Fitch Ratings, Inc. and/or A.M. Best Company; (E) a party not related to the Mortgagor was identified as the responsible party for such condition or circumstance and such responsible party has financial resources reasonably estimated to be adequate to address the situation; or (F) a party related to the Mortgagor having financial resources reasonably estimated to be adequate to address the situation is required to take action. To the Mortgage Loan Seller’s knowledge, except as set forth in the ESA, there is no Environmental Condition (as such term is defined in ASTM E1527-13 or its successor) at the related Mortgaged Property.

  • Environmental Studies Promptly conduct and complete, at Borrower’s expense, all such investigations, studies, samplings and testings as may be requested by Lender or any governmental authority relative to any substance, or any waste or by-product of any substance defined as toxic or a hazardous substance under applicable federal, state, or local law, rule, regulation, order or directive, at or affecting any property or any facility owned, leased or used by Borrower.

  • Adverse Weather Conditions Except in emergency conditions, the Employer shall not require an employee to work outside under extreme weather conditions.