Unformed Surfaces Sample Clauses

The "Unformed Surfaces" clause defines the responsibilities and standards related to areas of a construction project that are not given a final finish or are left in a raw state. Typically, this clause specifies which surfaces—such as the undersides of slabs, hidden structural elements, or utility spaces—are not required to meet the same aesthetic or finishing standards as visible, occupied areas. It may also outline any minimum requirements for these surfaces, such as being free of major defects or hazards. The core function of this clause is to clarify expectations and avoid disputes over the level of finish required for non-visible or secondary surfaces, ensuring that resources are focused on areas where appearance and finish are critical.
Unformed Surfaces. Begin curing immediately after finishing concrete. Cure unformed surfaces, including floors and slabs, concrete floor toppings, and other surfaces.
Unformed Surfaces. After proper and adequate vibration and tamping, unformed top surfaces of slabs, floors, walls, and curbs shall be brought to a uniform surface with suitable tools. Whenever the air temperature exceeds 85 degrees F or the wind speed exceeds 25 mph at the time of placement, the concrete shall be treated as follows. Immediately after the concrete has been screeded, it shall be treated with a liquid evaporation retardant. The retardant shall be used again after each WORK operation as necessary to prevent drying shrinkage cracks. The classes of finish for unformed concrete surfaces are designated and defined as follows: 1. Finish U1 - Sufficient leveling and screeding to produce an even, uniform surface with surface irregularities not to exceed 3/8-inch. No further special finish is required. 2. Finish U2 - After sufficient stiffening of the screeded concrete, surfaces shall be float finished with wood or metal floats or with a finishing machine using float blades. Excessive floating of surfaces while the concrete is plastic and dusting of dry cement and sand on the concrete surface to absorb excess moisture will not be permitted. Floating shall be the minimum necessary to produce a surface that is free from screed marks and is uniform in texture. Surface irregularities shall not exceed 1/4-inch. Joints and edges shall be tooled where indicated or as determined by the ENGINEER.

Related to Unformed Surfaces

  • Animals The Hirer shall ensure that no animals (including birds) except guide dogs are brought into the premises, other than for a special event agreed to by the Village Hall. No animals whatsoever are to enter the kitchen at any time.

  • Groundwater Any water, except capillary moisture, beneath the land surface or beneath the bed of any stream, lake, reservoir or other body of surface water within the boundaries of this state, whatever may be the geologic formation or structure in which such water stands, flows, percolates, or otherwise moves.

  • Tea Breaks (a) Every employee will be entitled to a paid 10 minute tea break in each four hours worked at a time to be agreed between the employee and employer. (b) Subject to agreement between the employer and employee, such breaks may alternatively be taken as one 20 minute tea break. (c) ▇▇▇ breaks will count as time worked.

  • Mold The Contractor shall take steps to prevent mold from developing on the Site, or being released into the air and shall promptly decontaminate any areas of mold that develop.

  • Investigatory Leave The Appointing Authority/designee may place an employee who is the subject of a disciplinary investigation on an investigatory leave with pay provided a reasonable basis exists to warrant such leave.