Common use of Value Engineering Clause in Contracts

Value Engineering. Prepare a value-engineering report for District review and approval that: 10.1.2.1. 5.1 Details areas of cost saving (e.g. construction processes/procedures, specified materials and equipment, and equipment or other aspects of the design documents that can be modified to reduce costs and/or the time for achieving final completion of the Project and/or to extend life-cycle and/or to reduce maintenance/operations costs, without diminution in the quality of materials/equipment/workmanship, scope or intended purposes of the Project);

Appears in 38 contracts

Sources: Facilities Lease, Facilities Lease, Facilities Lease

Value Engineering. Prepare a value-engineering report for District review and approval that: 10.1.2.1. 10.1.2.1 5.1 Details areas of cost saving (e.g. construction processes/procedures, specified materials and equipment, and equipment or other aspects of the design documents that can be modified to reduce costs and/or the time for achieving final completion of the Project and/or to extend life-cycle and/or to reduce maintenance/operations costs, without diminution in the quality of materials/equipment/workmanship, scope or intended purposes of the Project);

Appears in 2 contracts

Sources: Facilities Lease, Facilities Lease

Value Engineering. Prepare a value-engineering report for District review and approval that:: D R A F T 10.1.2.1. 10.1.2.1 5.1 Details areas of cost saving (e.g. construction processes/procedures, specified materials and equipment, and equipment or other aspects of the design documents that can be modified to reduce costs and/or the time for achieving final completion of the Project and/or to extend life-cycle and/or to reduce maintenance/operations costs, without diminution in the quality of materials/equipment/workmanship, scope or intended purposes of the Project);

Appears in 2 contracts

Sources: Facilities Lease, Facilities Lease

Value Engineering. Prepare a value-engineering report for District review and approval that: 10.1.2.1. 5.1 10.1.2.1.5.1 Details areas of cost saving (e.g. e.g., construction processes/procedures, specified materials and equipment, and equipment or other aspects of the design documents that can be modified to reduce costs and/or the time costs 10.1.2.1.5.2 Provides detailed estimate for achieving final completion of the Project and/or to extend lifeproposed value-cycle and/or to reduce maintenance/operations costs, without diminution in the quality of materials/equipment/workmanship, scope engineering items; 10.1.2.1.5.3 Defines methodology or intended purposes of the Project);approaches that maximize value; and 10.1.2.1.5.4 Identifies design choices that can be more economically delivered.

Appears in 1 contract

Sources: Facilities Lease