Vehicle Load Management Sample Clauses

POPULAR SAMPLE Copied 2 times
Vehicle Load Management. Angola has the institutional and legal framework to be able to comply with the VLM Strategy and MOU. The detail may have to be revised in accordance with the Tripartite documentation. The Tripartite VLM baseline requirements with regard to Angola are evaluated in the following paragraphs.
Vehicle Load Management. Nine stationary weighbridges operate at strategically important sites throughout the country, excluding the recently opened weighbridge at Sendafa. Most of the existing weighbridges are single deck scales and the axles or axle groups of the heavy vehicles are weighed one by one. The weighbridges operate full time, 24 hours a day and seven days a week and are located in such a way that they cover most of the main routes. Enforcement is further strengthened by employing the use of mobile weighbridges for random axle load control activities. Two mobile teams are dedicated to this task, operating in different areas of the country and covering those routes missed by the stationary weighbridges.1 The ERA recently commissioned a study to determine the status of weighbridges in the country and to propose a way forward. Nine additional locations for new weigh stations were proposed.

Related to Vehicle Load Management

  • Workload Management 11.1 The parties to this Agreement acknowledge that Employees and management have a responsibility to maintain a balanced workload and recognise the adverse effects that excessive workloads may have on Employee/s and the quality of resident/client care. 11.2 To ensure that Employee concerns involving excessive workloads are effectively dealt with by Management the following procedures should be applied: (a) Step 1: In the first instance, Employee/s should discuss the issue with their immediate supervisor and, where appropriate, explore solutions. (b) Step 2: If a solution cannot be identified and implemented, the matter should be referred to an appropriate senior manager for further discussion. (c) Step 3: If a solution still cannot be identified and implemented, the matter should be referred to the Facility Manager for further discussion. (d) Step 4: The outcome of the discussions at each level and any proposed solutions should be recorded in writing and fed back to the effected Employees. 11.3 Workload management must be an agenda item at staff meetings on at least a quarterly basis. Items in relation to workloads must be recorded in the minutes of the staff meeting, as well as actions to be taken to resolve the workloads issue/s. Resolution of workload issues should be based on the following criteria including but not limited to: (a) Clinical assessment of residents’ needs; (b) The demand of the environment such as facility layout; (c) Statutory obligation, (including, but not limited to, work health and safety legislation); (d) The requirements of nurse regulatory legislation; (e) Reasonable workloads (such as roster arrangements); (f) Accreditation standards; and (g) Budgetary considerations. 11.4 If the issue is still unresolved, the Employee/s may advance the matter through clause 9 Dispute Resolution Procedure. Arbitration of workload management issues may only occur by agreement of the Employer and the Employee representative, which may include the union/s.

  • Security Management The Contractor shall comply with the requirements of the DOD 5200.1-M and the DD Form 254. Security of the Contractor’s electronic media shall be in accordance with the above documents. Effective Program Security shall require the Contractor to address Information Security and Operations Security enabled by the Security Classification Guides. The Contractor’s facility must be able to handle and store material up to the Classification Level as referenced in Attachment J-01, DD Form 254.

  • Patch Management All workstations, laptops and other systems that process and/or store County PHI or PI must have critical security patches applied, with system reboot if necessary. There must be a documented patch management process which determines installation timeframe based on risk assessment and vendor recommendations. At a maximum, all applicable patches must be installed within 30 days of vendor release.

  • Access Management The Engineer shall coordinate and evaluate access management within the project limits in accordance with the latest State Access Management Manual or as directed by the State.

  • Property Management (a) Borrower shall (i) cause Manager to manage the Properties in accordance with the Management Agreement, (ii) diligently perform and observe all of the terms, covenants and conditions of the Management Agreement on the part of Borrower to be performed and observed, (iii) promptly notify Lender of any default under the Management Agreement of which it is aware, (iv) promptly deliver to Lender a copy of each financial statement, business plan, capital expenditures plan, report and estimate received by it under the Management Agreement, and (v) promptly enforce the performance and observance of all of the covenants required to be performed and observed by Manager under the Management Agreement in a commercially reasonable manner. If Borrower shall default in the performance or observance of any material term, covenant or condition of the Management Agreement on the part of Borrower to be performed or observed, then, without limiting Lender’s other rights or remedies under this Agreement or the other Loan Documents, and without waiving or releasing Borrower from any of its Obligations hereunder or under the Management Agreement, Lender shall have the right, but shall be under no obligation, to pay any sums and to perform any act as may be appropriate to cause all the material terms, covenants and conditions of the Management Agreement on the part of Borrower to be performed or observed. In no event shall the fee payable to Manager for any Interest Period exceed the Management Fee Cap for such Interest Period and in no event shall Borrower pay or become obligated to pay to Manager, any transition or termination costs or expenses, termination fees, or their equivalent in connection with the Transfer of a Property or the termination of the Management Agreement. (b) If any one or more of the following events occurs: (i) the occurrence of an Event of Default, (ii) Manager shall be in material default under the Management Agreement beyond any applicable notice and cure period (including as a result of any gross negligence, fraud, willful misconduct or misappropriation of funds), or (iii) Manager shall become insolvent or a debtor in any bankruptcy or insolvency proceeding, then Lender shall have the right to require Borrower to replace the Manager and enter into a Replacement Management Agreement with (x) a Qualified Manager selected by Borrower that is not an Affiliate of Borrower or (y) another property manager chosen by Borrower and approved by Lender; provided, that such approval shall be conditioned upon Borrower delivering a Rating Agency Confirmation as to such property manager. If Borrower fails to select a new Qualified Manager or a replacement Manager that satisfies the conditions described in the foregoing clause (y) and enter into a Replacement Management Agreement with such Person within sixty (60) days of Lender’s demand to replace the Manager, then Lender may choose the replacement property manager provided that such replacement property manager is a Qualified Manager or satisfies the conditions set forth in the foregoing clause (y).