Verification Operations Clause Samples

Verification Operations. Each supply shall be measured on delivery by the representative of the Head of Department and shall be accompanied by a delivery note showing the quantity being supplied under each item of the Schedule and the Head of Department’s representative shall receipt such note provided the quantities on the delivery note tally with the quantities supplied. Should the quantities shown on the delivery note as being supplied not conform to the quantities actually supplied, the contractor shall become liable to a fine equivalent to double the value, at the contract rate, of the quantity short-delivered. The Head of Department or his / her representative shall have the power to reject any goods and/or materials supplied by the contractor should they be not in accordance with the Specifications or with the sample produced by the contractor and approved by Government and the contractor shall remove the rejected goods at his /her expense within the shortest possible time. The contractor shall be bound to replace any rejected goods and/or materials with goods and/or materials of the approved quality within the time prescribed by the Head of the Department concerned.
Verification Operations. 30.1. The supplies shall not be accepted until the prescribed verifications and tests have been carried out at the expense of the contractor. The verifications and tests may be conducted before shipment, at the point of delivery and/or at the final destination of the goods. 30.2. DCI shall, during the progress of the delivery of the supplies and before the supplies are taken over, have the power to order or decide: a) the removal from the place of acceptance, within such time or times as may be specified in the order, of any supplies which, in the opinion of DCI, are not in accordance with the contract; b) their replacement with proper and suitable supplies; c) the removal and proper re-installation, notwithstanding any previous test thereof or of any installation which in respect of materials, workmanship or design for which the contractor is responsible, is not, in the opinion of DCI, in accordance with the contract; d) that any work done or goods supplied or materials used by the contractor is or are not in accordance with the contract, or that the supplies or any portion thereof do not fulfil the requirements of the contract. 30.3. The contractor shall, with all speed and at its own expense, make good the defects so specified. If the contractor does not comply with such order, DCI shall be entitled to employ other persons to carry out the orders and all expenses consequent thereon or incidental thereto shall be deducted by DCI from any monies due or which may become due to the contractor or from the performance bound. 30.4. Supplies which are not of the required quality shall be rejected. A special ▇▇▇▇ ▇▇▇ be applied to the rejected supplies. This shall not be such as to alter them or affect their commercial value. Rejected supplies shall be removed by the contractor from the place of acceptance, if DCI so requires, within a period which DCI shall specify, failing which they shall be removed as of right at the expense and risk of the contractor. Any works incorporating rejected materials shall be rejected. 30.5. The provisions of Article 30 shall not affect the right of DCI to claim under Article 21, nor shall it in any way release the contractor from any warranty or other obligations under the contract.

Related to Verification Operations

  • Verification Bank may, from time to time, verify directly with the respective Account Debtors the validity, amount and other matters relating to the Accounts, either in the name of Borrower or Bank or such other name as Bank may choose.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Gather and validate 3 months of pre-installation measurements (and calculations) based on the M&V protocol for pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report for each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months of post-installation measurements based on M&V protocol for post- installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • Discuss whether the energy, water, and greenhouse gas emission savings goals identified in Section II. C. were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final) • CPR Report #2

  • Verifications If Partner acquires Red Hat Products and/or Services directly from Red Hat, during the Term and for at least two (2) years thereafter, Partner will keep and maintain commercially reasonable written records regarding Partner’s use and distribution of the Red Hat Products and Services and business activities related to the Program(s) ("Records"). Red Hat may, at its own expense, verify the Records to determine Partner’s compliance with this Agreement. This verification may take the form of requests for information, documents or records (to which Partner will respond promptly), on-site visits (for which Partner shall grant Red Hat the requisite access), or both. The Parties will act reasonably and cooperate with each other in respect of such verifications. Any on-site visit will occur during regular business hours and will not interfere unreasonably with Partner’s business. For an on-site visit, Red Hat will give Partner at least thirty (30) day’s prior written notice.