Voltage Control. The ISO and NEVP shall coordinate the use of voltage control equipment to maintain transmission voltages and reactive flows at mutually agreed upon levels to ensure system stability within the operating range of electrical equipment and in accordance with WSCC MORC. The ISO and NEVP shall operate the facilities at the Interconnection at reactive reserve margins that are adequate to maintain minimum acceptable voltage limits under facility Outage conditions. Agreed upon voltage schedule limits and reactive flows are specified in Service Schedule 7.
Appears in 2 contracts
Sources: Interconnected Control Area Operating Agreement, Interconnected Control Area Operating Agreement