Volumetric Measurement Sample Clauses

Volumetric Measurement. 1. Volumetric measurement shall be accomplished utilizing a flow computer, turbine meter, and temperature and pressure transmitters. A “fixed” specific gravity at 60 oF and vapor pressure at 100 oF may be entered into the flow computer in the case of “purity” products, if agreed by both parties. Temperature and pressure shall be referenced to the proper API, ASTM and GPA Tables to calculate and totalize net barrels. An optional densitometer and flow-proportional composite sampler may be installed. If a densitometer is installed, the flow computer shall convert the density signal at flowing conditions in gm/cc to specific gravity at 60 oF and use GPA TP-15 to determine EVP (Equilibrium Vapor Pressure).

Related to Volumetric Measurement

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point ▇▇▇▇▇▇. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Measurement Should the State terminate this contract as herein provided, no fees other than fees due and payable at the time of termination shall thereafter be paid to the Engineer. In determining the value of the work performed by the Engineer prior to termination, the State shall be the sole judge. Compensation for work at termination will be based on a percentage of the work completed at that time. Should the State terminate this contract under paragraph (4) or (5) above, the Engineer shall not incur costs during the thirty-day notice period in excess of the amount incurred during the preceding thirty days.

  • Performance Measurement The Uniform Guidance requires completion of OMB-approved standard information collection forms (the PPR). The form focuses on outcomes, as related to the Federal Award Performance Goals that awarding Federal agencies are required to detail in the Awards.