Vulnerability and Risk Assessment Methodology Sample Clauses

Vulnerability and Risk Assessment Methodology 

Related to Vulnerability and Risk Assessment Methodology

  • Risk Assessment An assessment of any risks inherent in the work requirements and actions to mitigate these risks.

  • Periodic Risk Assessment Provider further acknowledges and agrees to conduct periodic risk assessments and remediate any identified security and privacy vulnerabilities in a timely manner.

  • Loop Testing/Trouble Reporting 2.1.6.1 Telepak Networks will be responsible for testing and isolating troubles on the Loops. Telepak Networks must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled Loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Customer Wholesale Interconnection Network Services (CWINS) Center. Upon request from BellSouth at the time of the trouble report, Telepak Networks will be required to provide the results of the Telepak Networks test which indicate a problem on the BellSouth provided Loop. 2.1.6.2 Once Telepak Networks has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its End Users. 2.1.6.3 If Telepak Networks reports a trouble on a non-designed or designed Loop and no trouble actually exists, BellSouth will charge Telepak Networks for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the Loop’s working status. 2.1.6.4 In the event BellSouth must dispatch to the end-user’s location more than once due to incorrect or incomplete information provided by Telepak Networks (e.g., incomplete address, incorrect contact name/number, etc.), BellSouth will ▇▇▇▇ ▇▇▇▇▇▇▇ Networks for each additional dispatch required to repair the circuit due to the incorrect/incomplete information provided. BellSouth will assess the applicable Trouble Determination rates from BellSouth’s FCC or state tariffs.

  • Risk Assessments a. Risk Assessment - DST shall, at least annually, perform risk assessments that are designed to identify material threats (both internal and external) against Fund Data, the likelihood of those threats Schedule 10.2 p.2 occurring and the impact of those threats upon DST organization to evaluate and analyze the appropriate level of information security safeguards (“Risk Assessments”). b. Risk Mitigation - DST shall use commercially reasonable efforts to manage, control and remediate threats identified in the Risk Assessments that it believes are likely to result in material unauthorized access, copying, use, processing, disclosure, alteration, transfer, loss or destruction of Fund Data, consistent with the Objective, and commensurate with the sensitivity of the Fund Data and the complexity and scope of the activities of DST pursuant to the Agreement. c. Security Controls Testing - DST shall, on approximately an annual basis, engage an independent external party to conduct a review (including information security) of DST’s systems that are related to the provision of services. DST shall have a process to review and evaluate high risk findings resulting from this testing.

  • Conformity Assessment Procedures 1. Each Party shall give positive consideration to accepting the results of conformity assessment procedures of other Parties, even where those procedures differ from its own, provided it is satisfied that those procedures offer an assurance of conformity with applicable technical regulations or standards equivalent to its own procedures. 2. Each Party shall seek to enhance the acceptance of the results of conformity assessment procedures conducted in the territories of other Parties with a view to increasing efficiency, avoiding duplication and ensuring cost effectiveness of the conformity assessments. In this regard, each Party may choose, depending on the situation of the Party and the specific sectors involved, a broad range of approaches. These may include but are not limited to: (a) recognition by a Party of the results of conformity assessments performed in the territory of another Party; (b) recognition of co-operative arrangements between accreditation bodies in the territories of the Parties; (c) mutual recognition of conformity assessment procedures conducted by bodies located in the territory of each Party; (d) accreditation of conformity assessment bodies in the territory of another Party; (e) use of existing regional and international multilateral recognition agreements and arrangements; (f) designating conformity assessment bodies located in the territory of another Party to perform conformity assessment; and (g) suppliers’ declaration of conformity. 3. Each Party shall exchange information with other Parties on its experience in the development and application of the approaches in Paragraph 2(a) to (g) and other appropriate approaches with a view to facilitating the acceptance of the results of conformity assessment procedures. 4. A Party shall, upon request of another Party, explain its reasons for not accepting the results of any conformity assessment procedure performed in the territory of that other Party.