WATER DISTRIBUTION SYSTEM. 18.1 The Developer shall construct a complete water supply and distribution system, including valves, valve boxes, fire hydrants, service connections, curb stops and boxes, blow offs and ground hydrants as may be required, for the purpose of servicing the Plan of Subdivision. The water distribution system shall be constructed in accordance with the Plans approved by the Director of Public Works, the Region of Niagara Public Works Department and the construction and materials shall be in accordance with Town’s most recent specifications therefor. All work on water distribution system shall be performed in accordance with Ontario Regulation 170/03 made under the Safe Drinking Water Act, 2002, S.O. 2002, c.32, as amended and the Town’s DWWP and DWWL. The Developer shall install, charge, test and maintain fire hydrants as required by the approved Plans and specifications in accordance with this Agreement to the complete satisfaction of the Town of Pelham Fire Department and the Director of Public Works. 18.2 The Developer shall install, charge, test, and maintain fire hydrants as required by the approved Plans and specifications in accordance with this Agreement to the complete satisfaction of the Town of Pelham Fire Department and the Director of Public Works. 18.3 The water supply and distribution system shall be designed to accommodate residential and fire flows with the minimum size of 150 mm in diameter. 18.4 All water mains shall be flushed, chlorinated, pressure tested, and bacterial tested in accordance with Town standards and to the satisfaction of the Director of Public Works prior to approval of the Completion Certificate for Primary Services. 18.5 The operation of valves which cause the water mains within the Plan of Subdivision to be charged from existing municipal water mains SHALL ONLY be carried out by Town Staff. All work on water distribution system shall be performed in accordance with Ontario Regulation 170/03 made under the Safe Drinking Water Act, 2002, S.O. 2002, c.32, as amended and the Town’s DWWP and DWWL. The Town has an approved Quality Management System for the Pelham Distribution System and the Developer and its contractors shall be aware and informed of the Quality Management System. 18.6 The Developer shall, prior to the Director of Public Works approving the issuance of the Completion Certificate for Primary Services, supply the Director of Public Works with “as constructed drawings” showing the location and depth of the water connections constructed to service each of the Lots.
Appears in 6 contracts
Sources: Subdivision Agreement, Subdivision Agreement, Subdivision Agreement
WATER DISTRIBUTION SYSTEM. 18.1 The Developer shall construct a complete water supply and distribution system, including valves, valve boxes, fire hydrants, service connections, curb stops and boxes, blow offs blowoffs and ground hydrants as may be required, for the purpose of servicing the Plan of Subdivision. The water distribution system shall be constructed in accordance with the Plans approved by the Director of Public Works, the Region of Niagara Public Works Department and the construction and materials shall be in accordance with Town’s most recent specifications therefor. All work on water distribution system shall be performed in accordance with Ontario Regulation 170/03 made under the Safe Drinking Water Act, 2002, S.O. 2002, c.32, as amended and the Town’s DWWP and DWWL. The Developer shall install, charge, test and maintain fire hydrants as required by the approved Plans and specifications in accordance with this Agreement to the complete satisfaction of the Town of Pelham Fire Department and the Director of Public Works.
18.2 The Developer shall install, charge, test, and maintain fire hydrants as required by the approved Plans and specifications in accordance with this Agreement to the complete satisfaction of the Town of Pelham Fire Department and the Director of Public Works.
18.3 The water supply and distribution system shall be designed to accommodate residential and fire flows with the minimum size of 150 mm in diameter.
18.4 All water mains shall be flushed, chlorinated, pressure tested, and bacterial tested in accordance with Town standards and to the satisfaction of the Director of Public Works prior to approval of the Completion Certificate for Primary Services.
18.5 The operation of valves which cause the water mains within the Plan of Subdivision to be charged from existing municipal water mains SHALL ONLY be carried out by Town Staff. All work on water distribution system shall be performed Staff certified in accordance with Ontario Regulation 170/03 made under the Safe Drinking Water Act, 2002, S.O. 2002, c.32, as amended and the Town’s DWWP and DWWLamended. The Town has an approved Quality Management System for the Pelham Distribution System and the Developer and its contractors shall be aware and informed of the Quality Management System.
18.6 The Developer shall, prior to the Director of Public Works approving the issuance of the Completion Certificate for Primary Services, supply the Director of Public Works with “as constructed drawings” showing the location and depth of the water connections constructed to service each of the Lots.
Appears in 2 contracts
Sources: Subdivision Agreement, Subdivision Agreement
WATER DISTRIBUTION SYSTEM. 18.1 The Developer shall construct a complete water supply and distribution system, including valves, valve boxes, fire hydrants, service connections, curb stops and boxes, blow offs and ground hydrants as may be required, for the purpose of servicing the Plan of Subdivision. The water distribution system shall be constructed in accordance with the Plans approved by the Director of Public Works, the Region of Niagara Public Works Department and the construction and materials shall be in accordance with Town’s most recent specifications therefor. All work on water distribution system shall be performed in accordance with Ontario Regulation 170/03 made under the Safe Drinking Water Act, 2002, S.O. 2002, c.32, as amended and the Town’s DWWP and DWWL. The Developer shall install, charge, test and maintain fire hydrants as required by the approved Plans and specifications in accordance with this Agreement to the complete satisfaction of the Town of Pelham Fire Department and the Director of Public Works.
18.2 The Developer shall install, charge, test, and maintain fire hydrants as required by the approved Plans and specifications in accordance with this Agreement to the complete satisfaction of the Town of Pelham Fire Department and the Director of Public Works.
18.3 The water supply and distribution system shall be designed to accommodate residential and fire flows with the minimum size of 150 mm in diameter.
18.4 All water mains shall be flushed, chlorinated, pressure tested, and bacterial tested in accordance with Town standards and to the satisfaction of the Director of Public Works prior to approval of the Completion Certificate for Primary Services.
18.5 The operation of valves which cause the water mains within the Plan of Subdivision to be charged from existing municipal water mains SHALL ONLY be carried out by Town Staff. All work on water distribution system shall be performed in accordance with Ontario Regulation 170/03 made under the Safe Drinking Water Act, 2002, S.O. 2002, c.32, as amended and the Town’s DWWP and DWWL. The Town has an approved Quality Management System for the Pelham Distribution System and the Developer and its contractors shall be aware and informed of the Quality Management System.
18.6 The Developer shall, prior to the Director of Public Works approving the issuance of the Completion Certificate for Primary Services, supply the Director of Public Works with “as constructed drawings” showing the location and depth of the water connections constructed to service each of the Lots.
Appears in 1 contract
Sources: Subdivision Agreement