Testing Procedures The following test procedure shall apply to all urine tests administered to bargaining unit employees: a. Urine specimens shall be collected at the approved laboratory as stated below in section (e), or at an accredited medical facility when necessary after an accident. b. The employee shall not be observed when the urine specimen is given. c. All specimen containers, vials or bags used to transport the samples shall be sealed with evidence tape and labeled in the presence of the employee. d. The testing shall be done by another approved laboratory. e. The employer shall choose the testing/collection facility to be utilized for toxicology testing on a yearly basis. f. The following standards shall be used to determine what levels of detected substances shall be considered positive. Note: - These are current levels subject to change by Federally Mandated Regulations. Current Federal Regulations shall be controlling in case of change or conflict: DRUG SCREENING TEST CONFIRMATION Amphetamines 500 ng/ml Amphetamine 250 ng/ml GC-MS Marijuana Metabolites 50 ng/▇▇ ▇▇▇▇▇-THC 15 ng/ml GC-MS Cocaine Metabolites 150 ng/ml Metabolites 100 ng/ml GC-MS Opiates Morphine 2,000 ng/ml 2,000 ng/ml GC-MS PCP 25 ng/ml PCP 25 ng/ml GC-MS MDMA 500 ng/ml 250 ng/ml Alcohol .08 Breath .04 Breath – Employees with CDL .02 - .039 Breath - Employees with CDL will be removed from service for 24 hrs. g. Tests which are below the levels set forth above shall be determined as negative. If test results are negative, all non-required documentation regarding supervisors' observations and testing will be destroyed. h. At the time the urine specimen is collected two samples will be taken. One sample will be sent to the laboratory to be tested at the employer's expense. If the first sample tests positive then upon written request by the employee within twenty-four
Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.
Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”). (ii) The Contractor shall, within 30 (thirty) days of the Appointed Date, submit to the Authority’s Engineer its Quality Assurance Plan which shall include the following: (a) organisation, duties and responsibilities, procedures, inspections and documentation; (b) quality control mechanism including sampling and testing of Materials, test frequencies, standards, acceptance criteria, testing facilities, reporting, recording and interpretation of test results, approvals, check list for site activities, and proforma for testing and calibration in accordance with the Specifications for Road and Bridge Works issued by MORTH, relevant IRC specifications and Good Industry Practice; and (c) internal quality audit system. The Authority’s Engineer shall convey its approval to the Contractor within a period of 21 (twenty-one) days of receipt of the QAP stating the modifications, if any, required, and the Contractor shall incorporate those in the QAP to the extent required for conforming with the provisions of this Clause 11.2. (iii) The Contractor shall procure all documents, apparatus and instruments, fuel, consumables, water, electricity, labour, Materials, samples, and qualified personnel as are necessary for examining and testing the Project Assets and workmanship in accordance with the Quality Assurance Plan. (iv) The cost of testing of Construction, Materials and workmanship under this Article 11 shall be borne by the Contractor.
Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.
Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.