WATER SYSTEM IMPROVEMENTS. 4.1 Developer shall complete all of the following described work in accordance with the approved plans: 4.1.1. Add dedicated utility easements to the plat notes (e.g., water and sewer lines); 4.1.2. Work with the City Engineer to size the water line to be installed along ▇▇▇▇▇▇▇▇ Street prior to approval of Construction Drawings. (as defined in Section 9.1 below). Developer shall complete water system improvements, including water line size upgrades along ▇▇▇▇▇▇▇▇ Street, installation of fire hydrants, and water connections. Developer shall be responsible for 100% of the cost of this work, as well as the re-connection of all existing services to the new line. 4.1.3. Locate and install fire hydrants on the Property to locations which are reasonably acceptable to the City and approved by the Fire Chief. Developer shall be responsible for 100% of the cost of such relocation and installation.
Appears in 1 contract
Sources: Development Agreement
WATER SYSTEM IMPROVEMENTS. 4.1 Developer shall complete all of the following described work in accordance with the approved plans:
4.1.1. Add dedicated utility easements to the plat notes (e.g., water and sewer lines);
4.1.2. Work with the City Engineer to size the water line to be installed along ▇▇▇▇▇▇▇▇ Street prior to approval of Construction Drawings. Drawings (as defined in Section 9.1 below). Developer shall complete water system improvements, including water line size upgrades along ▇▇▇▇▇▇▇▇ Street, installation of fire hydrants, and water connections. Developer shall be responsible for 100% of the cost of this work, as well as the re-connection of all existing services to the new line.
4.1.3. Locate and install fire hydrants on the Property to locations which are reasonably acceptable to the City and approved by the Fire Chief. Developer shall be responsible for 100% of the cost of such relocation and installation.