Weight and Balance Manual Clause Samples

The Weight and Balance Manual clause establishes the requirement for maintaining and referencing a manual that details the aircraft's weight and balance data. This manual typically includes information on the distribution of weight, permissible loading limits, and procedures for calculating the aircraft's center of gravity. By mandating the use of an up-to-date Weight and Balance Manual, the clause ensures safe aircraft operation and regulatory compliance, preventing overloading or improper loading that could compromise flight safety.
Weight and Balance Manual. This manual specific to each Aircraft enables the operator to determine the centre of gravity in relation with the loading of the Aircraft. This manual will be in general accordance with ATA 100 Specification.

Related to Weight and Balance Manual

  • Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.

  • Salary Schedule The salaries of Employees covered by this Agreement are set forth in the salary schedule in Appendix B which is attached to and incorporated into this Agreement.

  • Flexible Work Schedule A flexible work schedule is any schedule that is not a regular, alternate, 9/80, or 4/10 work schedule and where the employee is not scheduled to work more than 40 hours in the "workweek" as defined in Subsections F. and H., below.

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

  • Commercial Operation Date Testing and Modifications Prior to the Commercial Operation Date, the Connecting Transmission Owner shall test the Connecting Transmission Owner’s Attachment Facilities (including required control technologies and protection systems) and System Upgrade Facilities and System Deliverability Upgrades and Developer shall test the Large Generating Facility and the Developer’s Attachment Facilities to ensure their safe and reliable operation. Similar testing may be required after initial operation. Developer and Connecting Transmission Owner shall each make any modifications to its facilities that are found to be necessary as a result of such testing. Developer shall bear the cost of all such testing and modifications. Developer shall generate test energy at the Large Generating Facility only if it has arranged for the injection of such test energy in accordance with NYISO procedures.