WORK INCLUDED. A. The Contractor shall include all items and all work reasonably inferred by these specifications and the Contract, including any design-build bridging documents. If the Contractor is in doubt as to the intent of any portion of these specifications or the Contract, or necessary information is omitted, the Contractor shall notify the Owner in writing for clarifications or corrections to be provided by addendum. B. Work shall include all documentation, including all required design, construction as-built and close-out documents and compliance documentation. C. The work shall include the design of the electrical systems, materials, equipment, fabrication, installation and tests in conformity with applicable codes and professionally recognized standards. The electrical design shall be fully developed, including but not limited to the following: 1. Description and supportive calculations for all power and grounding systems. 2. Evaluation of existing switchgear and Utility transformers for interconnection compatibility as part of preliminary design. 3. Location and layout of all system equipment. 4. Site plans, elevations, schedules, equipment arrangement and detailed drawings 5. Single line diagrams including local utility system tie-ins. 6. All other drawings, calculations, details, and schedules required for the system design. D. Design documents, cut sheets, shop drawings, and technical specifications shall be submitted, reviewed, and accepted by the Owner per the guidelines specified in the Contract. E. Incidental work directly related to the construction of the System, including, but not limited to: excavating, directional boring, backfilling, roof flashing, fire stopping, waterproofing, pavement repair, striping, and testing. F. Design and construction coordination with all other disciplines and trades. G. Temporary power and lighting as required for construction and security during construction. H. All other utilities, labor, materials, apparatus, tools, equipment, transportation, and special or occasional services as required to fulfill the contracted scope. I. Any other electrical work as might reasonably be implied as required to fulfill the contracted scope, even though not specifically mentioned herein or shown on the drawings. J. All required construction documents, compliance documentation, as-built, and close-out documents.
Appears in 4 contracts
Sources: Design Build Agreement, Design Build Agreement, Design Build Agreement