Contract for Commissioned Manufacturing of Collimators and Tungalloy Parts
Contract
      for Commissioned Manufacturing of Collimators and Tungalloy Parts
    No.
      of
      Contract:
    | Shenzhen
                Hyper Technology Incorporation | |||
| Add.: | ▇▇.
                ▇▇▇ ▇▇▇▇▇ ▇, ▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇ Park, | Postcode | 518038 | 
| Hongmian
                Road | |||
| Futian
                Free Trade Zone, Shenzhen | |||
| Tel: | Fax: | ▇▇▇▇-▇▇▇▇▇▇▇▇ | |
| Party
                B | Xian
                Fengrui New Materials Co., Ltd. | ||
| Tanlong
                Building, ▇▇. ▇▇ ▇▇▇▇▇ ▇▇▇▇, ▇▇▇▇ ▇▇▇▇ | Postcode | 710048 | |
| Tel: | ▇▇-▇▇▇▇▇▇▇▇ | Fax: | ▇▇▇-▇▇▇▇▇▇▇▇ | 
After
      friendly negotiation, Party A and Party B agreed to execute this Contract,
      under
      with Party A will commission Party B to manufacture the collimators and
      tungalloy parts used in SGS-I according to the drawings provided by Party
      A.
    1.  Contract
      object and amount:
    Party
      B
      would manufacture the following products according to the drawings provided
      by
      Party A:
    | No. | Name | Drawing | Quantity/set | Total(15sets) | 
| 1 | No.
                15 collimator | SGS.5.3 | 18 | 270 | 
| 2 | No.
                25 collimator | SGS.5.4 | 18 | 270 | 
| 3 | Shielding
                stopper | SGS.5.5 | 18 | 270 | 
| 4 | No.
                40 collimator | SGS.5.7 | 18 | 270 | 
| 5 | No.
                55 collimator | SGS.5.8 | 18 | 270 | 
| 6 | Shielding
                bar | SGS.1.2.1-2 | 18 | 270 | 
| 7 | Tungsten
                shielding | SGS.l.1.1-2 | 2 | 30 | 
| 8 | Tungsten
                counter-weight | SGS.1.1.3-3 | 1 | 15 | 
| 9 | Locating
                sleeve | SGS.1.2.1-5A | 1 | 15 | 
| 10 | Collimator
                carrier tungalloy
                insert block | SGS.1.2.1-6 | 2 | 30 | 
| 11 | Pre-collimator | SGS.1.3.1-1 | 18 | 270 | 
| 12 | Tungsten
                cover | SGS.1.3.1-3 | 18 | 270 | 
| 13 | Tungsten
                end closure | SGS.1.3.1-4 | 18 | 270 | 
The
      currency amount for a single set is RMB 185,000. The contract total amount
      is
      RMB2,775,000, including the transportation cost and tax.
    1
        2.    Date
      and
      place of delivery
    1)  Party
      A
      shall notify Party B the manufacturing plan for the necessary products one
      month
      in advance, and would pay in advance 80% of the total amount as planned. Party
      B
      shall provide qualified products to Party A within one month.
    2)  After
      both parties take a joint acceptance the check of the products at the location
      of Party B according to the drawings and technical requirements provided by
      Party A, it is Party B's responsibilities of to transport the products to the
      place designated by Party A. The transportation cost shall be paid by Party
      A.
    3.    Payment
    The
      remaining payment shall be paid within one week after the products have been
      qualified at acceptance inspection and picked up., Party B shall issue a formal
      value-added tax invoice with Party A as beneficiary within one week after it
      receives the payment.
    4.    Technical
      materials
    Party
      B
      shall keep confidential the drawings and technical documents provided by Party
      A, and shall not be allowed to disclose the same to any third party by any
      way.
      in addition, after competition of manufacturing all the products, Party B shall
      return all the drawings and technical documents to Party A.
    5.    Quality
      requirements and inspection acceptance of products
    1)  Party
      B
      must prepare the materials required in the drawings for the manufacturing the
      products, and make sure that the product can meet the quality requirements
      in
      the drawings, and provide relevant product quality certificate after products
      are qualified at check. At the time of delivery, both parties shall take a
      joint
      acceptance inspection according to the drawings and technical requirements
      provided by Party A.
    2
        2)  Party
      B
      offers a warranty period of 12 months for the products manufactured. The
      warranty period
      starts from the date the products are qualified at the acceptance inspection
      by
      Party A. If there are any quality problems occurs with regarding to the
      processing or defect of the materials within the warranty period, Party B shall
      repair or change on time, the cost shall be undertaken by Party B.
    6.    Package
      and transportation
    1)  Party
      B
      shall be responsible for the proper packing of the products as well as the
      cost
      of packing.
      The packing should be well enough so that the products wouldn't be damaged
      during the
      transportation, and Party B shall be charged for any loss due to improper
      packing during transportation.
    2)  Party
      B
      shall be responsible for the transportation. Party B shall transport the
      products safely to the designated place, and the transportation cost shall
      be
      borne by Party B.
    7.    Liability
      for breach of contract
    1)  If
      Party
      B delays in delivery, for each 10 days' delay, Party B should pay 2%
      of
      total
      delayed amount as penalty. For delay up to 2 month, Party A has the right to
      terminate the contract, and request Party B to return all the paid payment
      and
      pay penalty. Any delay due to manufacturing quality shall be deemed as delay
      for
      delivery by Party B.
    2)  If
      Party
      A delays in payment, for the delayed amount, Party A should pay Party B fines
      according to the related regulations of the People's Bank of China.
    3)  I
      the
      delay is because of the design problems of Party A, it shall be the of Party
      A's
      responsibility and the date of delivery can be delayed accordingly.
    3
        8.    Arbitration
    Any
      disputes arising from the implementation of the contract shall be resolved
      through friendly negotiation between the parties. If negotiation fails to
      resolve the disputes, either party is entitled to file a suit to the People's
      Court of the place where the contract has been executed..
    9.    Appendix
      of contract
    There
      is
      one appendix of the contract, which is a very important part of the contract
      and
      holds the same legal force as the contract itself.
    Appendix
      1: Product design drawings.
    10.    Contract
      wording
    This
      contract has four (4) original copies, which shall be effective after being
      sealed by both Parties and being executed by the legal representatives or
      authorized agents of both Parities. Each Party shall keep two (2) copies of
      this
      contract.
    | Party
                A: Shenzhen Hyper Technology  Incorporation Representative:
                /s/ ▇▇▇▇▇ ▇▇▇▇ Date:
                August 15, 2005 | Party
                B: ▇▇▇▇ ▇▇▇▇▇▇▇ New Materials Co.,  Ltd. Representative:
                /s/ HE JIANPING Date:
                August 15, 2005 | 
4