PART A : SCHEDULE OF RATES FOR BUILDERS WORKSAnnual Rate Contract • March 14th, 2023
Contract Type FiledMarch 14th, 2023ItemNo Description Of Work Unit Rate 1 EARTH WORK : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 Sqm on plan) lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge 1 All kinds of soil (from 0.00 mt to 1.50 mts. ) cu.m 180.00 2 All kinds of soil. (from 1.50 mts to 3.00 mts. ) cu.m 251.00 3 Supplying and filling in plinth with sand under floors, including watering, ramming,consolidating and dressing complete. cu.m 1895.00 4 Dismantling of Brick Work of any thickness cu.m 1489.00 5 Dismantling of Plain cement concrete of any thickness cu.m 1087.00 6 Dismantling of RCC of any thickness and staking reinforcement cu.m 2567.00 Centering and shuttering including strutting, propping etc. and removal of form for : 7a Foundations, footings, bases of columns, etc. for mass concrete sq.m 270.00 7b Lintels, beams, plinth beams, girders, bressumers and cantilevers sq