St. Johns Public SchoolsBid Documents • April 2nd, 2025
Contract Type FiledApril 2nd, 2025on the discharge side of the main system pumps with a single boiler located on the suction side of the main system pumps. The new boiler will tie to a reworked header on the suction side of the system pumps with two other existing condensing boilers.