PURPOSE
Operating Procedures • June 16th, 2022

The purpose of this section is to provide generators with a general understanding of applicable PG&E and the California Independent System Operator (CAISO) operating procedures. PG&E and the generator must be in agreement on specific operating parameters before the generator is allowed to interconnect with the grid.

PURPOSE
Operating Procedures • May 27th, 2015

The purpose of this section is to provide generators with a general understanding of applicable PG&E and the California Independent System Operator (CAISO) operating procedures. PG&E and the generator must be in agreement on specific operating parameters before the generator is allowed to interconnect with the grid.