SCHEDULE 1Participating Generator Agreement • September 1st, 2021
Contract Type FiledSeptember 1st, 2021Resource Name(Generating Unit) CAISO Resource ID Type Of Unit Primary Fuel Type Net capacity to the CAISO Controlled Grid (Gross Output minus auxiliary load and transmission losses, if applicable)(MW) Limitations (That affect technical characteristics and performance of the unit - include those not captured in the GRDT)