Building Two definition

Building Two means that certain single story building located on the Real Property consisting of approximately 29,600 square feet.
Building Two and "Building Three"). As neither the specific design or size of any or all of the Three Buildings has been approved by the City, any description of the location, size or design of the Building or of the Three Buildings is necessarily only an approximation, and the Parties agree to amend this Lease if necessary or appropriate to reflect the final description of the location, size or design of the Three Buildings as ultimately approved by the Parties and the City. Tenant, as provided in the Construction Agreement, is obligated to exercise due diligence to seek to obtain the approval by the City for the development of an aggregate of at least 300,000 square feet for all three Buildings. Said letting and hiring is upon and subject to the terms, covenants and conditions hereinafter set forth and as set forth in the Construction Agreement, and Tenant covenants as a material part of the consideration for this Lease to perform and observe each and all of said terms, covenants and conditions. This Lease is made upon the conditions of such performance and observance. For convenience, attached hereto is an Index of Defined Terms which identifies the Paragraph or other location where various defined terms are defined in this Lease, with all such defined terms being initially capitalized.
Building Two means the commercial office building of not less than two hundred eighteen thousand three hundred forty-nine (218,349) square feet and associated improvements to be constructed on Parcel 2 of the Property pursuant to the Building Two Plans and Specifications and the Site Improvement Plans and Specifications.

Examples of Building Two in a sentence

  • Lessee shall work with Lessor's architect to develop working drawings outlining, among other things, Lessee's wall layout, detailed electrical, plumbing and air conditioning requirements and finishes ("Working Drawings") and Lessee shall approve final Working Drawings for the Buildings on or before July 1, 2000 for Building Three and the Amenity Building, July 21, 2000 for Building Four, August 5, 2000 for Building Two and September 8, 2000 for Building One.

  • One year after the date a certificate of occupancy is issued for Building Two, appropriate paving, landscaping, lighting, and other improvements required to ensure safe, comfortable, and contiguous pedestrian accommodations on Bridge Street between Broadway and the Fox River, in compliance with current industry standards.

  • During the Term, Seller shall pay all costs associated with Seller’s occupancy of the Leased Premises as well as all ongoing standard operating costs associated with Building Four, and, if Seller elects to occupy Building One, Building Two, or Building Five, the costs applicable to such building or buildings.

  • Lessor shall use commercially reasonable efforts to cause Certificates of Occupancy to be issued for Building Three no later than January 25, 2001, ("First Scheduled Delivery Date"); then February 15, 2001 for Building Four; March 8, 2001 for Building Two; and March 29, 2001 for Building One and March 29, 2001 for the Amenity Building.

  • Based upon Premises of 40,786 rentable square feet in Building Two, which contains approximately 88,509 rentable square feet.

  • The Galleria Building Two, Penthouse ▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇, ▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇-▇▇▇▇ Attention: ▇▇▇▇▇▇▇ ▇▇▇▇ Copy to: ▇▇▇▇▇ & ▇▇▇▇▇, A Professional Corporation ▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇, ▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇▇, ▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇ Attention: ▇▇▇▇▇▇▇ ▇.

  • This fire access shall be installed prior to a certificate of occupancy is issued for Building One and remain in place until a permanent fire access lane is constructed with Building Two.

  • Office Building Area · Building One = 87,152 RSF · Building Two = 87,152 RSF · Total = 174,304 RSF · Note: All areas are approximate and for convenience purposes only.

  • Landlord agrees to provide Tenant with a continuous right of first refusal which is subordinate to any existing tenant then in place and under lease (including any renewal right stated in existing tenant's lease, this subordination meaning only that the existing tenant shall have superior rights with respect to its own space) on space located on the 2nd and 3rd floors of Building Two at First Union Plaza.

  • If the cost of any structural Alterations, series of related structural Alterations, Equipment or accessions thereto is in excess of $1,000,000 or, with respect to Alterations to the "clean room" test area in Building Three and "process laboratory" in Building Two, $2,500,000, the prior written approval of Lender shall be required, such approval not to be unreasonably withheld, delayed or conditioned.


More Definitions of Building Two

Building Two means the building which contains approximately 168,127 square feet of Rentable Area located at ▇▇▇▇▇ ▇▇▇▇▇ ▇▇▇▇▇▇▇, contains the Premises and is known as Building Two as shown on the Site Plan.
Building Two and "Building Three" and containing approximately 60,000 square feet, 47,000 square feet and 106,000 square feet, respectively, and all other buildings, structures and other improvements now or hereafter constructed on the Land (collectively, the "Improvements"); and (c) the fixtures, machinery, equipment and other property described in Exhibit "B" hereto (collectively, the "Equipment").

Related to Building Two

  • apartment building means a residential use building, or the residential use portion of a mixed-use building, other than a townhouse or stacked townhouse containing four or more dwelling units each of which shall have access to above grade common halls, stairs, elevators, and yards;

  • Building means any structure used or intended for supporting or sheltering any use or occupancy.