CAISO Grid definition
Examples of CAISO Grid in a sentence
On and after Initial Synchronization of the Facility to the CAISO Grid, Seller shall not authorize or designate any other party to act as the Facility’s Scheduling Coordinator, nor shall Seller perform for its own benefit the duties of Scheduling Coordinator, and Seller shall not revoke Buyer’s authorization to act as the Facility’s Scheduling Coordinator unless agreed to by Buyer.
Upon Initial Synchronization of the Facility to the CAISO Grid, Buyer shall be the Scheduling Coordinator or designate a qualified third party to provide Scheduling Coordinator services with the CAISO for the Facility for both the delivery and the receipt of Test Energy and the Product at the Delivery Point.
If there are determined to be deliverability Network Upgrade costs on the CAISO Grid as an affected system of the Native Balancing Authority as a result of this Project, Buyer can request that Seller elect to fund or elect not to fund all deliverability Network Upgrades.
The Delivery Point is at the point of interconnection with the CAISO Grid, [insert name or location].
Upon Initial Synchronization of the Facility to the CAISO Grid, Buyer shall be the Scheduling Coordinator or designate a qualified third party to provide Scheduling Coordinator services with the CAISO for the Facility for both the delivery and the receipt of the Facility Energy, and if applicable, the Test Energy, at the Delivery Point.
Seller shall fulfill all contractual, metering and applicable interconnection requirements, including those set forth in Participating Transmission Owner’s applicable tariffs, the CAISO Tariff and implementing CAISO standards and requirements, including, but not limited to, executing applicable interconnection agreements, Participating Generator Agreement, Meter Service Agreement and PTO Generator Special Facilities Agreements, if applicable, so as to be able to deliver Energy to the CAISO Grid.
The Energy Delivery Point shall be [the point of interconnection of the Project to the CAISO Grid at ________] (as described and set forth in the single-line diagram of grid interconnection attached hereto as Appendix 1.3.
Seller shall fulfill all contractual, metering and applicable interconnection requirements, including those set forth in the Participating Transmission Owner’s applicable tariffs, the CAISO Tariff and implementing CAISO standards and requirements, so as to be able to deliver Energy to the CAISO Grid.
Seller shall fulfill all contractual, metering and applicable interconnection requirements, including those set forth in Participating Transmission Owner’s applicable tariffs, the CAISO Tariff and implementing CAISO standards and requirements, including, but not limited to, executing applicable interconnection agreements, Participating Generator Agreement and Meter Service Agreement so as to be able to deliver Energy to the CAISO Grid.
The Energy Delivery Point shall be the PNode at the Project’s first point of interface with the CAISO Grid (as described and set forth in the single-line diagram of grid interconnection attached hereto as Appendix 1.3.