Capacity Availability Factor definition

Capacity Availability Factor has the meaning set forth in Exhibit C.
Capacity Availability Factor has the meaning set forth in Exhibit C. “Capacity Availability Payment True-up” has the meaning set forth in Exhibit C.
Capacity Availability Factor means: (AEG + SME)  PE, where AEG = Available Energy - Gas for any period, stated in Megawatt-hours (MWh), means the amount of Contract Energy that is available from the Facility for dispatch on natural gas fuel, regardless of the extent to which SPP actually dispatches the Facility, during such period. For purposes of calculating AEG: • The Facility shall be derated for Forced Outages (regardless of whether caused by Force Majeure) and ambient conditions. By way of example for the month of June, [year], if (I) the Facility is fully mechanically available, (II) no maintenance is scheduled for the month, but (III) due to summer conditions, the average Contract Capacity actually available from the Facility for the month is MW, then CAF for such month shall be MWh [AEG]  MWh [PE] = %. • Contract Capacity that is unavailable for dispatch by Company on natural gas fuel nevertheless shall be considered to be available for the purposes of determining AEG when (and only when):

Examples of Capacity Availability Factor in a sentence

  • CAFm = Average Capacity Availability Factor for a month shall equal the sum of the hourly Capacity Availability Factors (“CAFh”) determined for each hour of such month, divided by the total number of hours in such month; and CAFh = (AD + DD) / AFCE Provided, however, CAFh cannot be more than one (1).

  • CAFm = Average Capacity Availability Factor for a month shall equal the sum of the hourly Capacity Availability Factors (“CAFh ”) determined for each hour of such month, divided by the total number of hours in such month; and CAFh = (AD + DD) / AFCE Provided, however, CAFh cannot be more than one (1).

Related to Capacity Availability Factor

  • Capacity factor means the ratio of the average load on a machine or equipment for the period of time considered to the capacity rating of the machine or equipment.

  • Capacity Utilization Factor or “CUF” shall have the same meaning as provided in CERC (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2009 as amended from time to time; However, for avoidance of any doubt, it is clarified that the CUF shall be calculated on the Contracted Capacity; In any Contract Year, if ‘X’ MWh of energy has been metered out at the Delivery Point for ‘Y’ MW Project capacity, CUF= (X MWh/(Y MW*8766)) X100%; Declared CUF for this Project shall be % (to be revised as applicable).

  • S&P Volatility Factor means 277% or such other potential dividend rate increase factor as S&P advises the Corporation in writing is applicable.

  • System Availability means, with respect to any particular calendar month, the ratio obtained by subtracting Unscheduled Downtime during such month from the Total Monthly Time, and thereafter dividing the difference so obtained by the Total Monthly Time. Represented algebraically, System Availability for any particular calendar month is determined as follows:

  • Average Daily Availability means the average daily Availability for the immediately preceding Fiscal Quarter.