Constructability Reviews definition

Constructability Reviews. The Design Program Manager will annually track constructability review activities on projects.
Constructability Reviews. The CM will evaluate whether (a) the Drawings and Specifications are configured to enable efficient construction, (b) design elements are standardized, (c) construction efficiency is properly considered in the Drawings and Specifications, (d) module/preassembly design are prepared to facilitate fabrication, transport and installation, (e) the design promotes accessibility of personnel, material and equipment and facilitates construction under adverse weather conditions, (f) sequences of Work required by or inferable from the Drawings and Specifications are practicable, and
Constructability Reviews or “CR(s)” as used herein shall mean a systematic review of the Design Documents to ensure that the Design Documents delineate clear and feasible construction techniques, including, without limitation, making certain that the requirements of the construction work are clear, the Design Documents are coordinated, and that they assist the contractor in subcontractor bidding, construction and project administration to result in reduced impacts to the Project.

Examples of Constructability Reviews in a sentence

  • Constructability Reviews: After reviewing all design documents for completeness and coordination, the Contractor shall make recommendations and provide information and cost comparisons regarding construction materials, methods, systems, and phasing, to ensure efficient construction.

  • Lessee shall provide detailed written Constructability Reviews identifying, by drawing sheet, detail and specification section, and page, the issues to be discussed and resolved.

  • As part of the Constructability Reviews, Lessee shall identify areas where value analysis principles could be applied, and identify long-lead items.

  • Constructability Reviews: Lessee shall review all design documents for accuracy, completeness, clarity, consistency, coordination, and overall constructability.

  • Constructability Reviews shall be conducted on 50% and 90% Working Drawing Documents.

  • During this phase Contractor shall, in coordination with the AOC the Architect or Engineer and other third parties (as necessary and authorized by the AOC), provide the following: Constructability Reviews: After reviewing all design documents for completeness and coordination, the Contractor shall make recommendations and provide information and cost comparisons regarding construction materials, methods, systems, phasing, to ensure efficient construction.

  • The Constructability Reviews shall follow accepted industry practices and be in accordance with the requirements of the attached Exhibit G.

  • The CM’s Constructability Reviews do not supersede the responsibility of the Architect to provide correct and coordinated Design Documents for the Assigned Project.

  • If indicated in the Task Order for an Assigned Project, upon completion of the CM’s Value Engineering and Constructability Reviews for the Assigned Project, the CM shall prepare the Final Estimate of Construction Costs which shall reflect modifications to the Design Documents resulting from District accepted Value Engineering Recommendations and District accepted Constructability Review Comments for the Assigned Project.

  • Consideration of mandatory design exceptions will be included in existing quality review processes within the district, including regular PDT meetings, Constructability Reviews, Risk Management Plans, Safety Reviews and Management Reviews.


More Definitions of Constructability Reviews

Constructability Reviews. The ▇▇▇▇ shall evaluate whether (a) the drawings and specifications are configured to enable efficient construction, (b) design elements are standardized, (c) construction efficiency is properly considered in the drawings and specifications, (d) module/preassembly design are prepared to facilitate fabrication, transport and installation, (e) the design promotes accessibility of personnel, material and equipment and facilitates construction under adverse weather conditions, (f) sequences of work required by or inferable from the drawings and specifications are practicable, and (g) the design addresses efficiency issues such as access and entrance to the site, laydown and storage of materials, staging of site facilities, construction parking, and other similar issues.
Constructability Reviews. The Project Consultant shall review and comment on all constructability reviews submitted by the Construction Manager.
Constructability Reviews. CMR shall perform, without limitation, a review of all plans for fire and life safety, structural, mechanical, electrical, plumbing, telecommunications, data and security. In addition to this review, the CMR shall make recommendations regarding any items the CMR finds during that review including, without limitation and only by way of example, the location of fire and life safety devices, The CMR shall reconcile and coordinate those recommendations and other issues with the Project Team. After reviewing all design documents for completeness and constructability, the CMR shall make recommendations and provide information and cost comparisons regarding construction materials, methods, systems, and phasing, to ensure efficient construction to the Project Team. Constructability reviews shall be conducted on 50% and 90% Working Drawings documents. These reviews shall be conducted with the Project Team and shall reconcile all recommendations.

Related to Constructability Reviews

  • Architectural Review Committee or “ARC” shall mean the architectural review committee established by the Organization to review plans submitted to the Organization for architectural review.

  • Treatability study means a study in which a hazardous waste is subjected to a treatment process to determine: (1) Whether the waste is amenable to the treatment process, (2) what pretreatment (if any) is required, (3) the optimal process conditions needed to achieve the desired treatment, (4) the efficiency of a treatment process for a specific waste or wastes, or (5) the characteristics and volumes of residuals from a particular treatment process. Also included in this definition for the purpose of the § 261.4 (e) and (f) exemptions are liner compatibility, corrosion, and other material compatibility studies and toxicological and health effects studies. A “treatability study” is not a means to commercially treat or dispose of hazardous waste.

  • Stability (7) means the standard deviation (1 sigma) of the variation of a particular parameter from its calibrated value measured under stable temperature conditions. This can be expressed as a function of time.

  • Review Criteria has the meaning assigned to that term in Section 12.02(b)(i).

  • Improvement completion assurance means a surety bond, letter of credit,