Cost Limit definition

Cost Limit shall have the meaning specified in Section 8.2(b).
Cost Limit means at any time the maximum aggregate amount the Funder is willing to risk for the purposes of the Scheme.
Cost Limit means the maximum payment which will be made by the Sponsor under this Agreement as set out in Schedule 1;

Examples of Cost Limit in a sentence

  • Notwithstanding anything above to the contrary, the City may require the Consultant to revise and modify Construction Documents and assist in the re-bidding of the Work at no additional cost or fee to the City if all responsive and responsible bids received exceed ten (10%) percent of the Maximum Cost Limit.

  • Prior to authorizing the Consultant to proceed with preparation of Construction Document Development, the City shall establish and communicate to the Consultant, a maximum sum for the cost of construction of the Project ("Maximum Cost Limit").

  • Costs of all General Conditions Work, subject to the General Conditions Work Cost Limit; provided, however, the cost of General Conditions Work pertaining to any Subcontract shall not be Cost of the Work if such costs are paid pursuant to that Subcontract.

  • Prior to authorizing the CONSULTANT to proceed with preparation of the Design for Construction, the CITY may establish and communicate to the CONSULTANT a maximum sum for the Cost of Construction of the Project (the "Maximum Cost Limit").

  • Costs arising from or related to the General Conditions Work in excess of the General Conditions Work Cost Limit.

  • The General Conditions Work Cost Limit for the Deliverable Portion of Work is Dollars ($ ).

  • For this reason, DSRIP payments shall not be considered patient care revenue for purposes of offsetting allowable uncompensated care costs under the Safety Net Care Pool Uncompensated Care Cost Limit Protocol under demonstration authority.

  • DSRIP and PHTII revenues will not be considered to be patient care revenues for this purpose along with other revenues as described in Massachusetts’ Cost Limit Protocol approved by CMS in December 2013.

  • In the event the final estimate of the Cost of Construction as provided in this Paragraph exceeds the Maximum Cost Limit, or in the event the lowest bona fide bid from a qualified contractor exceeds the Maximum Cost Limit, the CITY may require the CONSULTANT, without additional cost to the CITY, to consult with the CITY and to revise and modify the Design for Construction and the Contract Documents as required to achieve compliance with the Maximum Cost Limit.

  • Owner shall pay Construction Manager, subject to the Preconstruction Services Cost Limit, for Construction Manager’s preconstruction services in accordance with the terms of Exhibit E.

Related to Cost Limit

  • Maximum allowable cost list means a list of drugs for

  • Cost-reimbursement contract means a contract under which a contractor is

  • Cost Reimbursement means a contract which provides for a fee other than a fee based on a percentage of cost and under which a contractor is reimbursed for costs which are allowable and allocable in accordance with the contract terms.

  • Deactivation Avoidable Cost Credit means the credit paid to Generation Owners pursuant to Tariff, Part V, section 114.

  • Administrative Cost Rate As of any date of determination, a rate equal to the sum of the Servicing Fee Rate, the Operating Advisor Fee Rate, the Asset Representations Reviewer Ongoing Fee Rate, the CREFC® Intellectual Property Royalty License Fee Rate and the Trustee/Certificate Administrator Fee Rate.