The Government of India, as per Clause 5.2(u) of the Indian Electricity Grid Code (IEGC), encourages a status of “must-run” to solar power projects.
The Government of India, as per Clause 5.2(u) of the Indian Electricity Grid Code (IEGC), encourages a status of “must- run” to solar power projects.
The Government of India, as per Clause 5.2(u) of the Indian Electricity Grid Code (IEGC), provides for status of “must-run” to solar power projects.
The Government of India, as per Clause 5.2(u) of the Indian Electricity Grid Code (IEGC), encourages a status of “must-run” to wind power projects.
The Government of India, as per Clause 5.2(u) of the Indian Electricity Grid Code (IEGC), encourages a status of “must-run” to wind and solar power projects.
The terms used in this Agreement, unless as defined below or repugnant to the context, shall have the same meaning as assigned to them by the Electricity ▇▇▇, ▇▇▇▇, Indian Electricity Grid Code 2010 and the Rules or Regulations framed there under, including those issued / framed by the Appropriate Commission (as defined hereunder), as amended or re-enacted from time to time.
Governments encourages status of 'must- run' to wind and solar power projects, which is reflected both in Indian Electricity Grid Code (IEGC) as well as State Grid Codes /Regulations.
The Government of India, as per Clause 5.2(u) of the Indian Electricity Grid Code (IEGC), provides for status of “must-run” to wind and solar power projects.
The concerned Transco/Discom and the Seller shall observe the State/Indian Electricity Grid Code or its amendment if any, and operate their systems to the best of their capacity and resources.
Clause 15.1 of the Telangana State Electricity Grid Code relates to connection conditions for connectivity with Intra State Transmission system and states the terms and conditions of the connection agreement between the user and the STU.