Engineering Documentation definition
Examples of Engineering Documentation in a sentence
Time to review new equipment design concept and hazard analysis will be invoiced as per Appendix C Fee Schedule, Engineering Documentation Review.
All architectural and landscape studies resulting from this agreement shall be consistent with pertinent standards and guidelines of the Secretary of the Interior, including as applicable the Secretary's Standards and Guidelines for Historical Documentation (48 FR 44728-30) and for Architectural and Engineering Documentation (48 FR 44730-34).
Methods of recordation and documentation described in the treatment plan(s) shall conform to the Secretary of the Interior’s Standards for Architectural and Engineering Documentation (48 FR 44730-44734) or other standards specified by NRC.
The Supplier shall promptly notify Silver Wheaton in writing of any material departure from or proposed change to the Development Plan or Engineering Documentation.
The digital photography package shall include printed color and black and white copies of the digital photographs (on appropriate paper, per NPS Photographic Policy), a CD/DVD of the digital photographs, a completed state architectural inventory form, and a written site history of the historic property per SOI Standards for Architectural and Engineering Documentation (▇▇▇▇▇://▇▇▇.▇▇▇.▇▇▇/history/local-law/arch_stnds_6.htm).
This documentation will be prepared in compliance with the Secretary of the Interior's Standards and Guidelines for Architectural and Engineering Documentation: HABS/HAER Standards, originally published in the Federal Register, Vol.
The large format film photography package shall include one (1) full set of 4 x 5 or 5 x 7-inch photographs printed on acid free paper, the corresponding 4 x 5 or 5 x 7- inch negatives in acid free sleeves, a completed state architectural inventory form, and a written site history of the historic property per SOI Standards for Architectural and Engineering Documentation (▇▇▇▇▇://▇▇▇.▇▇▇.▇▇▇/history/local- law/arch_stnds_6.htm).
Until Completion, the Supplier shall provide Silver Wheaton quarterly progress reports no later than 45 days following the end of each fiscal quarter, updating the construction and development in respect of the Project Assets, including costs incurred but not yet paid, costs incurred and paid, and an estimate of costs still to be incurred, compared to the Development Plan and Engineering Documentation.
NASA ARC and PV shall ensure that all documents prepared to satisfy the requirements of this MOA comply with the Secretary of the Interior’s Standards and Guidelines for Archeology and Historic Preservation, including but not limited to the Secretary of Interior’s Guidelines for Architectural and Engineering Documentation, HAER Documentation Level 1.
This booklet contains the Secretary of the Interior's Standards for Architectural and Engineering Documentation as published in the Federal Register on September 29, 1983 - commonly known as the HABS/HAER Standards for the Historic American Buildings Survey/Historic American Engineering Record (HABS/HAER) program of the National Park Service.