Expected Output definition

Expected Output means the generation profile associated with a 50% probability of exceedance.
Expected Output means the amount of Output (in kWh) to be produced by the System, based on the PVSYST data set forth in Exhibit B hereto.
Expected Output means Expected Energy in the first full Contract Year, reduced by an annual degradation factor of per Contract Year, compounded.

Examples of Expected Output in a sentence

  • The quantity of Energy in each month of the Settlement Period shall be equal to the Expected Output for such month (“Settlement Energy”).

  • Seller shall provide documentation to support all data and calculations used in each report to calculate the percent Expected Output.

  • The Output Shortfall shall be expressed in MWh and calculated in accordance with the following formula: Output Shortfall = (85% of the Expected Output for the Contract Year).

  • The Output Shortfall shall be expressed in MWh and calculated in accordance with the following formula: Output Shortfall = ( % of the Expected Output for the Contract Year).

  • SCHEDULE A: LIST OF SCHEMES/PROGRAMS FOR DELIVERABLES 01, 02 & 03 Deliverable 01: Research & Evaluation (Assessment of 13 Schemes/Programs) of NHM UP on RMNCH+A and National Programs Expected Output: A Study report with qualitative and quantitative data compilation with anecdotes and Case studies for each Schemes/Programs.


More Definitions of Expected Output

Expected Output means the expected amount of Output from the System, as set forth in Exhibit B.
Expected Output shall have meaning set forth in Clause 2.1; “Feedback” shall have the meaning set forth in Clause 2.2; “FLW” means Frontline Workers;
Expected Output means in the first full Contract Year, reduced by an annual degradation factor of per Contract Year.
Expected Output means 214,327 MWh in the first full Contract Year, reduced by an annual degradation factor of 0.8% per Contract Year.
Expected Output means 208,721 MWh in the first full Contract Year, reduced by an annual degradation factor of 0.5% per Contract Year.
Expected Output means 64,206 MWh in the first full Contract Year, reduced by an annual degradation factor of 0.5% per Contract Year.
Expected Output means the amount of electricity (in kWh) expected to be produced by the Solar Park Generating Facility for a given calendar month or other period (as applicable) during the Term set forth in a ▇▇ ▇▇▇▇▇ ▇▇ data set based on the technical specifications of the Solar Park Generating Facility and which has been prepared by or certified by the Engineer.