Front of the Meter Project definition

Front of the Meter Project means the Project is located front of the retail meter as indicated in Appendix II Part A.

Examples of Front of the Meter Project in a sentence

  • Delete if the applicable Project is a Front of the Meter Project.

  • At Seller’s expense, Seller shall, or shall cause Project Company to, (a) in the case of Front of the Meter Project, obtain and maintain a single CAISO Resource ID dedicated exclusively to the Project and install all necessary metering and telemetry required by the CAISO to deliver the Product and (b) in the case of Behind the Meter Project, install, or shall cause the Customers in Seller’s Portfolio to install all necessary metering and telemetry required by the CAISO to deliver the Product.

  • At Seller’s expense, Seller shall (a) in the case of Front of the Meter Project, obtain and maintain a single CAISO Resource ID dedicated exclusively to the Project and install all necessary metering and telemetry required by the CAISO to deliver the Product and (b) in the case of Behind the Meter Project, install, or shall cause the Customers in Seller’s Portfolio to install all necessary metering and telemetry required by the CAISO to deliver the Product.

  • At Seller’s expense, Seller shall (a) in the case of Front of the Meter Project, obtain and maintain a single CAISO Resource ID dedicated exclusively to the Project and install all necessary metering and telemetry required by the CAISO to deliver the Product and (b) in the case of Behind the Meter Project, install, or shall cause the Customers in Seller’s Portfolio to install all necessary metering and telemetry required by the CAISO to deliver the Product Four.4Scheduling.

  • At Seller’s expense, Seller shall [, or shall cause Project Company to,] (a) in the case of Front of the Meter Project, obtain and maintain a single CAISO Resource ID dedicated exclusively to the Project and install all necessary metering and telemetry required by the CAISO to deliver the Product and (b) in the case of Behind the Meter Project, install, or shall cause the Customers in Seller’s Portfolio to install all necessary metering and telemetry required by the CAISO to deliver the Product.

  • At Seller’s expense, Seller shall [, or shall cause Project Company to,] (a) in the case of Front of the Meter Project, obtain and maintain a single CAISO Resource ID dedicated exclusively to the Project and install all necessary metering and telemetry required by the CAISO to deliver the Product and (b) in the case of Behind the Meter Project, install, or shall cause the Customers in Seller’s Portfolio to install all necessary metering and telemetry required by the CAISO to deliver the Product Scheduling.

Related to Front of the Meter Project

  • Behind The Meter Generation shall refer to a generation unit that delivers energy to load without using the Transmission System or any distribution facilities (unless the entity that owns or leases the distribution facilities has consented to such use of the distribution facilities and such consent has been demonstrated to the satisfaction of the Office of the Interconnection); provided, however, that Behind The Meter Generation does not include (i) at any time, any portion of such generating unit’s capacity that is designated as a Generation Capacity Resource; or (ii) in an hour, any portion of the output of such generating unit that is sold to another entity for consumption at another electrical location or into the PJM Interchange Energy Market.

  • Built-Up Area and/or “Covered Area” in relation to a Flat shall mean the floor area of that Flat including the area of balconies and terraces, if any attached thereto, and also the thickness of the walls (external or internal) and the columns and pillars therein Provided That if any wall, column or pillar be common between two Flats, then one-half of the area under such wall column or pillar shall be included in the built-up area of each such Flat.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Interior lot means a lot other than a corner lot.

  • water meter means any apparatus for measuring or showing the volume of water supplied to, or of effluent discharged from any premises;