Geotechnical Investigation definition

Geotechnical Investigation. Identifiable Soil Borings and Reports and testing costs approved by Program Manager.
Geotechnical Investigation. Consultant shall conduct site reconnaissance of the area to observe groundwater seepage, performance of earthwork features, and to locate the field explorations and understand access restrictions for field explorations. Consultant shall conduct field explorations that include two (2) soil borings. The geotechnical borings will be drilled using a track-mounted drill rig and mud-rotary drilling techniques up to a depth of 30 feet. If bedrock is encountered, we will core up to 10 feet of coring into the bedrock and terminate the borehole. The drill cuttings are assumed to be non-hazardous and will be drummed and removed from site. Wilsonville will get right of entry agreements for this work. In addition to the soil borings, the Consultant shall perform five (5) hand auger borings to depths of 10 feet or refusal along the proposed new channel alignment which is understood to be underneath PGE and BPA power transmission lines. Consultant shall install one (1) vibrating wire piezometer and datalogger in a selected boring to monitor groundwater levels. The piezometer data from the datalogger will be downloaded on three occasions in order to incorporate the findings into the geotechnical analysis and reporting. Consultant shall perform laboratory testing of soils to determine engineering properties. Laboratory testing will include up to ten (10) moisture tests, up to two (2) sieve analysis tests, and up to two (2) Atterberg limit tests. Consultant will perform one (1) small-scale PIT infiltration tests. Wilsonville will get right of entry agreements for this work. Consultant will perform geotechnical analyses buried structure design and summarize findings and design recommendations in a geotechnical engineering report (GER). A draft GER will be submitted for comments and questions. The report will be updated and send out as final. Task 8 Deliverables: • Draft Geotechnical Engineering Report in pdf format • Final Geotechnical Engineering Report in pdf format Task 9Preliminary Design (30%): Consultant shall advance the conceptual drainage improvement plans to a 30% level. Task 9 Deliverables: • Preliminary (30%) design documents set in both full size (22”x34”) and half-size (11”x17”) electronic (PDF) format digitally stamped and signed by a Professional Engineer registered in the State of Oregon.
Geotechnical Investigation has the meaning set forth in Section 9.5.

Examples of Geotechnical Investigation in a sentence

  • For their Preliminary Geotechnical Investigation Reports they have experienced engineers and geologists that use proven site investigation techniques to accurately characterize the surface and subsurface environment.

  • The ADMINISTRATOR shall coordinate the activities of land surveying firms including JWA’s land surveying teams, Geotechnical Investigation firms, and Special Testing and Inspection firms.

  • Perform in accordance with the District’s Geotechnical Investigation Guidelines and other District requirements.

  • Prior to performance of any drilling at the site, contractor shall develop a Geotechnical Investigation Plan for Owner’s review.

  • Geotechnical Investigation reports are available and a copy can be provided upon request.

  • Prior to performance of any drilling, if deemed necessary by the Contractor, the Contractor shall develop a Geotechnical Investigation Plan for Owner’s review.

  • The PROJECT MANAGER shall coordinate the activities of land surveying firms including JWA’s land surveying teams, Geotechnical Investigation firms, and Special Testing and Inspection firms.

  • Included in this task are the Alternatives Evaluation, Project Report, Environmental Documentation, Visual Memo, Topographical Mapping, Geotechnical Investigation, Hydraulic Studies, Bridge Type Selection, Preliminary Water Quality Technical Studies and 30% Design Details.

  • The parcels shall be developed in accordance with the development restriction recommendations outlined in the following reports: - Geotechnical Investigation Report, North Silverado Subdivision, prepared by ParklandGEO (File No CA0266), dated December 23, 2016.

  • All construction shall be performed according to the recommendations contained in Geotechnical Investigation and other engineering reports specific to the site, and in accordance with good engineering and design practices.

Related to Geotechnical Investigation

  • Remedial investigation means a process to determine the nature and extent of a discharge of a contaminant at a site or a discharge of a contaminant that has migrated or is migrating from the site and the problems presented by a discharge, and may include data collected, site characterization, sampling, monitoring, and the gathering of any other sufficient and relevant information necessary to determine the necessity for remedial action and to support the evaluation of remedial actions if necessary;

  • Geotechnical engineer means a Professional Engineer whose principal field of specialization is the design and Construction of earthworks in a permafrost environment.

  • Background investigation means the investigation conducted by a licensee or applicant to support the determination of trustworthiness and reliability.

  • Site investigation means the collection and evaluation of data adequate to determine whether or not discharged contaminants exist at a site or have migrated or are migrating from the site at levels in excess of the applicable remediation standards. A site investigation shall be developed based upon the information collected pursuant to the preliminary assessment;

  • Complaint Investigation means an investigation of any complaint that has been made to a proper authority that is not covered by an abuse investigation.