Grid Codes definition
Examples of Grid Codes in a sentence
Frequency Restoration Reserve At present includes Tertiary Operating Reserve 1 (TOR1) and Tertiary Operating Reserve 2 (TOR2) as defined in the EirGrid and SONI Grid Codes.
RR – Replacement Reserve At present includes Replacement Reserve (RR) as defined in the EirGrid and SONI Grid Codes.
Governments encourages status of 'must- run' to wind and solar power projects, which is reflected both in Indian Electricity Grid Code (IEGC) as well as State Grid Codes /Regulations.
If a situation of force majeure and/or an emergency situation, as defined in the Grid Codes or pursuant to Belgian civil law, is/are invoked, the fulfilment of the obligations that are the subject of the Contract is temporarily suspended for so long as the event that gave rise to the emergency situation and/or force majeure persists.
The following specification defines the minimum requirements for an instrument used in the monitoring and register of dynamic disturbances on electric power systems and the supervision of generator performance according to Grid Codes.
If an emergency situation or a multiple-incident situation arises, as defined in the Grid Codes, or when ▇▇▇▇ is of the opinion that an emergency might reasonably be expected to arise, ▇▇▇▇ may take the necessary measures, preventively as the case may be, which are described in the Grid Codes, including the implementation of the rescue code and the restoration code.
The metering data relating to Injection and/or Off-take Points connected to a distribution network other than the ▇▇▇▇ Grid will be supplied to [ARP] by the distribution system operator in question, in accordance with the Grid Codes for Local and Regional Transmission.
Demand Unit Demand Side Unit as defined in the EirGrid and SONI Grid Codes and in the ESBN and NIE Distribution Codes; or An Individual Demand Site or Aggregated Demand Site with a Demand Side Unit MW Capacity of at least 4 MW.
Except where there is further specification aimed at application for the purposes of the Contract, and without ignoring the stipulations of public order, the concepts defined in the Electricity Act, the electricity decrees and/or ordinances in relation to the organisation of the electricity market and/or the various applicable Grid Codes (as defined hereunder) are also included for the purposes of the Contract in the sense of these statutory or regulatory definitions.
Loss percentages will be allocated to [BRP]’s Balancing Perimeter for the Offtake measured at the Offtake Points (excluding those Offtake Points that supply a CDS), for the Distribution Allocations and for CDS Allocations connected to the ▇▇▇▇ ▇▇▇▇ (in the event of net Offtake), without prejudice to the provisions of the Federal Grid Code and, if applicable, in accordance with the relevant Grid Codes for Local and Regional Transmission.