Loading Service definition
Examples of Loading Service in a sentence
This LTL comprises the provisions contained herein, together with the LNG Truck Loading Service Confirmation Form and the LNG Truck Approval Service Confirmation Form (the “Service Confirmation”) in Attachment A, the general conditions contained in Attachment B (the “General Conditions”) which shall all form an integral part of this LTL.
Depending on the Send-Out rate of the Terminal, the Small-Scale LNG Carrier Loading Service may require a Send- Out into the Transmission System in order to reincorporate the boil-off gas linked to the Loading Service.
The Operator shall bear the cost of any material damage that it may cause to the Shipper during the marketing of the Small-Scale LNG Carrier Loading Service and the Small-Scale LNG Carrier Specific Services, which are the subject of the Contract, up to a limit of two million five hundred thousand (2,500,000) euros per event.
In case the Small-Scale LNG Carrier Loading Service entails a Send-Out into the Transmission System, the Small- Scale LNG Carrier Shipper undertakes to take it over under its Access Contract.
The Operator shall undertake that the Terminal Operator performs the Loading Service and the Small-Scale LNG Carriers Specific Services as contractually agreed.
The purpose of the Contract is to determine the conditions under which the Operator and the Terminal Operator shall perform the Loading Service and Small-Scale Specific Services as well as the rights and obligations of the Parties, in particular, the conditions under which the Operator shall : o Receive the Small-Scale LNG Vessels sent by the Shipper to the Terminal berth; o Load the LNG quantities from the Terminal to the Small-Scale LNG Carriers; o Perform other Small-Scale LNG Specific Services.
One of the necessary conditions for the feasibility of a Small-Scale LNG Carrier Loading Service is the existence of a sufficient inventory level that the Shipper guarantees holding under its ATM Contract.
The Monthly Capacity Charge for the following Month will be estimated as one (1) divided by the Service Term (expressed in Months with a maximum of 12 Months) multiplied by the LNG Truck Loading Service Rights during the relevant Contract Year multiplied by the applicable Regulated Tariff.
The tank truck product loading service for ECOPETROL to be provided by CENIT to ECOPETROL, the regulations of which are contained in the General Conditions of this Master Service Contract, the Chapter on Tank Truck Product Loading Service (Chapter III) and its annexes.
Any Assignment, pursuant to this Section 1.3, shall not require the prior written consent of the parties and shall be exempt from the provisions of Section 6.2 hereof.