If the Final Test Results reveal that the relevant Block has satisfied the Minimum Capacity Level but not the Guaranteed Capacity (as adjusted for uncertainty in accordance with Exhibit 16A), Contractor may elect to perform additional Work (if it deems necessary) and repeat the Capacity Test.
Contractor shall, as soon as practicable following the completion of a Capacity Test in which the Final Test Results reveal that the Minimum Capacity Level for such Block has been achieved, submit to Owner's Representative a Capacity Test Certificate, signed by Contractor's Representative and attaching the Final Test Results performed pursuant to Exhibit 16A.
Contractor shall conduct Functional Tests for each Block in accordance with Exhibit 27 and when Contractor believes that a Block can satisfy the Minimum Capacity Level, Contractor shall conduct the Capacity Test with respect to each Block in accordance with Exhibit 16A.
If the Final Test Results reveal that the relevant Block fails to meet the Minimum Capacity Level for such Block, Contractor shall repeat the respective Capacity Test as many times as necessary until the Minimum Capacity Level has been met.
Contractor shall take all corrective actions so that such Block successfully completes the Capacity Test and meets the Minimum Capacity Level, without prejudice to Owner's rights and remedies under this Agreement.
A Capacity Test Certificate signed by Owner is deemed conclusive evidence that such Block has met the Minimum Capacity Level required under this Agreement (“Acceptance”).
A Capacity Test Certificate signed by Owner is deemed conclusive evidence that the Facility has met the Minimum Capacity Level required under this Agreement.
Contractor shall conduct the Availability Test and Functional Test for the Facility in accordance with Exhibit 25, and when Contractor believes that the Facility can satisfy the Minimum Capacity Level, Contractor shall conduct the Power Plant Controller Test and the Capacity Test in accordance with Exhibit 14B or Exhibit 14C, as applicable.
Contractor shall take all corrective actions so that the Facility successfully completes the Capacity Test and meets the Minimum Capacity Level, without prejudice to Owner’s rights and remedies under this Agreement.
If the Final Test Results reveal that the Facility fails to meet the Minimum Capacity Level, Contractor shall repeat the Capacity Test as necessary until the Minimum Capacity Level has been met.