Minimum Design Flow Rate definition

Minimum Design Flow Rate means the minimum flow rate of Gas that a Delivery Point and Metering are designed to have flow through them and, in the case of Metering Accurately measure, as set out in Schedule One;
Minimum Design Flow Rate means the minimum flow rate of Gas that a Receipt Point and Metering are designed to have flow through them and, in the case of Metering Accurately measure, as set out in Schedule One; Nominated Quantity and Nominated Quantities mean, in respect of a Day and a Receipt Point, the quantity of Gas that a Shipper (or Shippers) request the Interconnected Party, where it is an OBA Party, to inject into First Gas’ Pipeline for that Shipper (or those Shippers); OBA Charges has the meaning set out in section 11.10;
Minimum Design Flow Rate means the minimum flow rate of Gas that a Receipt Point and Metering are designed to have flow through them and, in the case of Metering Accurately measure, as set out in Schedule One; Month means the period beginning at 0000 hours on the first Day of a calendar month and ending at 0000 hours on the first Day of the next calendar month, and Monthly shall be read accordingly; Nominated Quantity meansand Nominated Quantities mean, in respect of a Day and a Receipt Point, the quantity of Gas that a Shipper requests(or Shippers) request the Interconnected Party, where it is an OBA Party, to inject into First Gas’ Pipeline for that Shipper, which, to the extent that the Interconnected Party and First Gas approve such Nominated Quantity, shall be that Shipper’s Receipt Quantity: Non-Specification Gas means gas that is not Gas; OATIS means First Gas’ internet-based open access transmission information system, whose homepage is located at ▇▇▇▇://▇▇▇.▇▇▇▇▇.▇▇.▇▇ (or such other homepage as First Gas may notify to the Interconnected Party in writing from time to time), (or any replacement system;those Shippers):

Examples of Minimum Design Flow Rate in a sentence

  • If Gas is injected at a Receipt Point at rates less than the then-current Minimum Design Flow Rate to the extent that, in First Gas’ reasonable opinion, the Accuracy of the metered quantities at that Receipt Point is adversely affected, First Gas shall notify the Interconnected Party accordingly.

  • If Gas is taken at a Delivery Point at rates less than the then-current Minimum Design Flow Rate to the extent that, in First Gas’ reasonable opinion, the Accuracy of the metered quantities at that Delivery Point is adversely affected, First Gas shall notify the Interconnected Party accordingly.

  • If Gas is injected at a Receipt Point at rates less than the then-current Minimum Design Flow Rate to the extent that, in First Gas’ reasonable opinion, the Accuracy of the metered quantities at that Receipt Point is unduly affected, First Gas shall notify the Interconnected Party accordingly.

  • If Gas is injected at a Receipt Point at rates less than the then-current Minimum Design Flow Rate to the extent that, in First Gas’ reasonable opinion, the Accuracy of the metered quantities at that Receipt Point is unduly adversely affected, First Gas shall notify the Interconnected Party accordingly.

  • If Gas is taken at a Delivery Point at rates less than the then-current Minimum Design Flow Rate to the extent that, in First Gas’ reasonable opinion, the Accuracy of the metered quantities at that Delivery Point is unduly affected, First Gas shall notify the Interconnected Party accordingly.

  • If Gas is taken at a Delivery Point at rates less than the then-current Minimum Design Flow Rate to the extent that, in First Gas’ reasonable opinion, the Accuracy of the metered quantities at that Delivery Point is unduly adversely affected, First Gas shall notify the Interconnected Party accordingly.

  • If Gas is injected at a Receipt Point at rates less than the Minimum Design Flow Rate to the extent that, in First Gas’ reasonable opinion, the Accuracy of the energy quantities injected at that Receipt Point is compromised, First Gas shall notify the Interconnected Party accordingly.

  • If Gas is taken at a Delivery Point at rates less than the Minimum Design Flow Rate to the extent that, in First Gas’ reasonable opinion, the Accuracy of the energy quantities taken at that Delivery Point is compromised, First Gas shall notify the Interconnected Party accordingly.

  • Low Flow WhereIf Gas is taken at a Delivery Point at rates less than the Minimum Design Flow Rate sufficiently often, or in quantitiesto the extent that, in First Gas’ reasonable opinion makes, the determinationAccuracy of the energy quantities taken at that Delivery Point Inaccurateis compromised, First Gas shall notify the Interconnected Party and, after reasonable consultation, decide whether modifications to the Metering are necessaryaccordingly.

  • If Gas is injected at a Receipt Point at rates less than the then-current Minimum Design Flow Rate to the extent that, in First Gas’ reasonable opinion, the Accuracy of the metered quantities at that Receipt Point is undulyadversely affected, First Gas shall notify the Interconnected Party accordingly.


More Definitions of Minimum Design Flow Rate

Minimum Design Flow Rate means the minimum flow rate of Gas that a Receipt Point and Metering are designed to have flow through them and, in the case of Metering Accurately measure, as set out in Schedule One; Month means the period beginning at 0000 hours on the first Day of a calendar month and ending at 0000 hours on the first Day of the next calendar month, and Monthly shall be read accordingly; Nominated Quantity means, in respect of a Day and a Receipt Point, the quantity of Gas that a Shipper requests the Interconnected Party to inject into First Gas’ Pipeline for that Shipper, which, to the extent that the Interconnected Party and First Gas approve such Nominated Quantity, shall be that Shipper’s Receipt Quantity: Non-Specification Gas means gas that is not Gas; ▇▇▇▇▇ means First Gas’ internet-based open access transmission information system, whose homepage is located at ▇▇▇▇://▇▇▇.▇▇▇▇▇.▇▇.nz (or such other homepage as First Gas may notify to the Interconnected Party in writing from time to time), or any replacement system;

Related to Minimum Design Flow Rate

  • Maximum design heat input means the ability of a unit to combust a stated maximum amount of fuel per hour on a steady state basis, as determined by the physical design and physical characteristics of the unit.

  • Minimum DSCR means, with respect to a Supplemental Loan, (i) if the Senior Indebtedness bears interest at a fixed rate, 1.25:1, or (ii) if the Senior Indebtedness bears interest at a floating rate, 1.10:1.

  • Peak flow rate means the maximum instantaneous flow from a given storm condition at a particular location.

  • Maximum Daily Starts means the maximum number of times that a generating unit can be started in an Operating Day under normal operating conditions.

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.