The Participating Generator shall be responsible for all its costs incurred in connection with operating and maintaining the Net Scheduled QF identified in Schedule 1 for the purpose of meeting its obligations under this Agreement.
The Participating Generator represents that all necessary leases, approvals, permits, licenses, easements, rights of way or access to install, own and/or operate its Net Scheduled QF have been or will be obtained by the Participating Generator prior to the effective date of this Agreement.
For scheduling, billing, and settlement purposes regarding Net Scheduled QF Self-provided Load, measurements shall be made at the Point of Demarcation.
Net Scheduled QF operating limitations shall be set forth in Schedule 1 of this Agreement , the resource data template used for transmittal of Participating Generator technical data to the CAISO pursuant to the CAISO Tariff, or as otherwise mutually agreed to by the Parties.
The Participating Generator has identified the Net Scheduled QF that it owns, operates or has a contractual entitlement to, in Schedule 1, as required by Section 4.6.4 of the CAISO Tariff.
The Participating Generator shall provide to the CAISO the required information regarding operating contacts, rated capacity, and operating characteristics of the Net Scheduled QF.
The Participating Generator shall provide to the CAISO (a) a copy of the FERC order providing Qualifying Facility status to the Net Scheduled QF listed in Schedule 1, (b) a copy of any existing power purchase agreement with a UDC for the Net Scheduled QF listed in Schedule 1, and (c) a copy or a summary of the primary terms of any agreement for standby service with a UDC or MSS Operator.
The Participating Generator may satisfy the provisions of the CAISO Tariff for the installation of meters and telemetry by installing at the Point of Demarcation meters and telemetry for the purpose of recording the net impact of the Net Scheduled QF upon the CAISO Controlled Grid; provided that the installed meters and telemetry satisfy the technical functional and performance requirements for meters and telemetry set forth in the CAISO Tariff.
Notwithstanding Section 10.1.3 of the CAISO Tariff, the Participating Generator may net the value for the Generation produced by each Net Scheduled QF listed in Schedule 1 and the value for the Demand of the Self-provided Load that is (i) served by the Net Scheduled QF and (ii) electrically located on the same side of the Point of Demarcation.
Pursuant to Sections 8.9 and 8.10 of the CAISO Tariff, and the Existing QF Contract, if any, associated with that Net Scheduled QF, the CAISO may verify, inspect and test the capacity and operating characteristics of the Net Scheduled QF.